76 resultados para Peruvian Corporation, limited.

em Brock University, Canada


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The By-Law reads: "A By-Law to change the Qualification of a director of the Corporation. Be it enacted and is hereby enacted as a By-law of Barnes Wines, Limited that: - Whereas it is deemed expedient to change the qualifications of a Director of the Corporation; Be it therefore enacted as a By-law of Barnes Wines, Limited, as follows: That By-law no. 75 of the Corporation be and the same is hereby amended by striking out Paragraph 4 thereof. Enacted this 9th day of April, 1973. Witness the Corporate seal of the Corporation."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The summary of the By-Law reads: "A By-Law to authorize the setting aside of certain monies annually out of the net profits of the Company before payment of dominion and provincial income taxes and provincial corporation tax to be paid to a trustee for distribution to the employees and officers of the Company and to authorize the execution of an agreement with a trustee to effect such purpose."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The By-Law is titled "Respecting the borrowing of money by the Corporation".

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The summary of the law states "A special By-Law decreasing the number of directors of the Corporation".

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The By-Law reads "being a by-law increasing the number of directors of the Corporation be it enacted and it is hereby enacted as a special by-law of Barnes Wines, Limited (hereinafter called the "Corporation") as follows: 1. The number of directors of the Corporation be and the same is hereby increased from five to six so that the Board of Directors of the Corporation shall hereafter be composed of six directors. 2. The quorum for meetings of directors be and the same is hereby fixed at three. 3. All prior by-laws and resolutions of the Corporation inconsistent herewith be and the same are hereby amended, modified and revised in order to give effect to this special by-law."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of the hospital-employed nurse educator is evolving. Factors influencing this change include the introduction of standards for nurse educators by the College of Nurses of Ontario (CNO), a change in the way nurses are educated, the emergence of nursing as a profession, and hospital restructuring as a result of budgetary constraints. Two of these influencing factors: the introduction of the updated Standards of Practice for Registered Nurses and Registered Practical Nurses (1996) and hospital restructuring occurred over the last 7 years at several hospitals in southern Ontario. Current literature as well as the Standards of Practice (1996) were utilized to examine the current roles and responsibilities of nurse educators and subsequently develop a questionnaire to study the impact of these influencing factors on the role of the nurse educator. This questionnaire was piloted and revised before its distribution at 4 hospitals in southern Ontario. Twenty-five of the 41 surveys (61%) distributed were returned for analysis. The data reflected that the Standards of Practice had a positive influence on the role of the nurse educator, while hospital restructuring had a negative impact. In addition, many of the roles and responsibilities identified in the literature were indeed part of the current role of nurse educators, as well as several responsibilities not captured in the literature. The predictions for the future of this role in its current state were not positive given the financial status of the health care system as well as the lack of clarity for the role and the current level ofjob satisfaction among practicing nurse educators. However, a list of recommendations were generated which, if implemented, could add clarity to the role and improve job satisfaction. This could enhance the retention of current nurse educators and the possibility of recruiting competent nurse educators to the role in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An analytical model for bacterial accumulation in a discrete fractllre has been developed. The transport and accumlllation processes incorporate into the model include advection, dispersion, rate-limited adsorption, rate-limited desorption, irreversible adsorption, attachment, detachment, growth and first order decay botl1 in sorbed and aqueous phases. An analytical solution in Laplace space is derived and nlln1erically inverted. The model is implemented in the code BIOFRAC vvhich is written in Fortran 99. The model is derived for two phases, Phase I, where adsorption-desorption are dominant, and Phase II, where attachment-detachment are dominant. Phase I ends yvhen enollgh bacteria to fully cover the substratllm have accllillulated. The model for Phase I vvas verified by comparing to the Ogata-Banks solution and the model for Phase II was verified by comparing to a nonHomogenous version of the Ogata-Banks solution. After verification, a sensitiv"ity analysis on the inpllt parameters was performed. The sensitivity analysis was condllcted by varying one inpllt parameter vvhile all others were fixed and observing the impact on the shape of the clirve describing bacterial concentration verSllS time. Increasing fracture apertllre allovvs more transport and thus more accllffilliation, "Vvhich diminishes the dllration of Phase I. The larger the bacteria size, the faster the sllbstratum will be covered. Increasing adsorption rate, was observed to increase the dllration of Phase I. Contrary to the aSSllmption ofllniform biofilm thickness, the accllffilliation starts frOll1 the inlet, and the bacterial concentration in aqlleous phase moving towards the olitiet declines, sloyving the accumulation at the outlet. Increasing the desorption rate, redllces the dliration of Phase I, speeding IIp the accllmlilation. It was also observed that Phase II is of longer duration than Phase I. Increasing the attachment rate lengthens the accliffililation period. High rates of detachment speeds up the transport. The grovvth and decay rates have no significant effect on transport, althollgh increases the concentrations in both aqueous and sorbed phases are observed. Irreversible adsorption can stop accllillulation completely if the vallIes are high.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The anharmonic, multi-phonon (MP), and Oebye-Waller factor (OW) contributions to the phonon limited resistivity (;0) of metals derived by Shukla and Muller (1979) by the doubletime temperature dependent Green function method have been numerically evaluated for Na and K in the high temperature limit. The anharmonic contributions arise from the cubic and quartic shift of phonons (CS, QS), and phonon width (W) and the interference term (1). The QS, MP and OW contributions to I' are also derived by the matrix element method and the results are in agreement with those of Shukla and Muller (1979). In the high temperature limit, the contributions to;O from each of the above mentioned terms are of the type BT2 For numerical calculations suitable expressions are derived for the anharmonic contributions to ~ in terms of the third and fourth rank tensors obtained by the Ewald procedure. The numerical calculation of the contributions to;O from the OW, MP term and the QS have been done exactly and from the CS, Wand I terms only approximately in the partial and total Einstein approximations (PEA, TEA), using a first principle approach (Shukla and Taylor (1976)). The results obtained indicate that there is a strong pairwise cancellation between the: OW and MP terms, the QS and CS and the Wand I terms. The sum total of these contributions to;O for Na and K amounts to 4 to 11% and 2 to 7%, respectively, in the PEA while in the TEA they amount to 3 to 7% and 1 to 4%, respectively, in the temperature range.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ontario Editorial Bureau (O.E.B.)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cedar Dale Scythe Works was the second manufacturing company that A.S. Whiting had established in Oshawa, the first being the Oshawa Manufacturing Co. in 1852. The Oshawa Manufacturing Co. was eventually taken over by the Joseph Hall Works in 1857. In 1862, the Cedar Dale Works was built after being in a rented space in the Hall Works for two years, building scythes and hoes. With the building of the firm, the village of Cedar Dale was established. In 1867, the firm became Whiting and Cowan when John Cowan bought into the company. After the death of Whiting in 1867, his son-in-law, R.S. Hamlin headed the company. By 1872, it became the A.S. Whiting Manufacturing Co. when Cowan withdrew from the business. Before Whiting’s death, the company had been profitable but due to new machinery being developed, hand tools were becoming obsolete and the business only lasted for a few more years (source: Oshawa Community Museum and Archives Web site).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The fragment appears to be part of a larger group of bylaws for the Town of Welland, 1878. The fragment includes bylaws Cap. I and Cap. II. Cap. I is a bylaw appointing auditors for the town for the year 1878. Due to paper loss only a portion of the title of the Cap. II bylaw is extent but appears to be a bylaw appointing a Hey…….trustee for the town. Welland was incorporated in 1858 as a town and became a city in 1917.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The advertisements are for weed chains and unit chains for tires. Weed and unit chains were designed for use on muddy roads, snow, ice, wet pavement, and sand for single and dual solid truck tires. The Dominion Chain Co., Limited of Niagara Falls, Ontario began operation in 1914. The plant was located at 800 Bender Hill and in 1963 it employed between 250 and 500 people.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Book contains meeting minutes of the Board of Directors of the Humberstone Shoe Company Ltd., held at the Office of McLeod, Young, Weir and Co. Limited, Metropolitan Building, Toronto. Board of Directors includes: H.H. Knoll (President), J.H. Radcliffe, E. K. Reiner, T.H. Kinnear, L.B. Spencer. There is some correspondence, annual reports, contracts, by-laws, statements of profit and loss etc. throughout the book.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Welland Power and Supply Canal Company Limited, established in 1893 and incorporated in 1894 with a capital stock of $500,000. The aim of the company was to harness the natural water supply of the Niagara and Welland Rivers. In 1898 the Canadian Electrical News published a report by Henry Symons, QC outlining the main project of the company. This project involves the construction of a canal from the Welland River to the brow of the mountain at Thorold, a distance of 8 miles; the construction at Thorold of a power house, and from Thorold to Lake Ontario, a raceway by which to carry water into the lake. The estimate for the machinery to generate 100,000 horse power is £125,000; for transmission line to Toronto at a voltage of 10,000….The total estimate therefore amounts to £2,452,162, or roughly speaking, $12,000,000. Source: Canadian Electrical News, August 1898, p. 172. In 1899 the company officers petitioned the federal government desiring a name change to the Niagara-Welland Power Company Limited. Officers of the company were Harry Symons, President; Charles A. Hesson, Vice-President; and M.R. O’Loughlin, James B. Sheehan, James S. Haydon, Frederick K. Foster, directors; John S. Campbell, secretary-treasurer. The company’s head offices were located in St. Catharines, with a New York (City) office on Broad Street. In 1905 and 1909 the company petitioned the federal government for additional time to construct its works, which was granted. The company had until May 16, 1915 to complete construction. John S. Campbell (1860-1950) was a graduate of the University of Toronto and Osgoode Hall. During his university years John began his military career first in "K" Company, Queens Own rifles and then later as Commanding Officer of the 19th Lincoln Regiment, from 1906 to 1910. Upon his return to St. Catharines John Campbell served as secretary in the St. Catharines Garrison Club, a social club for military men begun in 1899. After being called to the Bar, he became a partner in the firm of Campbell and McCarron and was appointed to the bench in 1916, serving until retirement in 1934. Judge Campbell served as an alderman for several terms and was the mayor of St. Catharines in 1908 and 1909. He also served as the first chairman of the St. Catharines Public Utilities in 1914. John S. Campbell was married to Elizabeth Oille, daughter of Jerome B. and Charlotte (St. John) Oille. The family home "Cruachan" was located at 32 Church St.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On February 29, 1912 The Ontario Paper Company Limited was incorporated under the leadership of Col. Robert R. McCormick. Four months later construction began in Thorold, Ontario as this location was best for the abundance of power and water and water transportation. The first machine was started at the mill on September 5, 1913. The mill was one of the most advanced of its era, using electricity instead of water power. The mill was also the first of its kind as it combined pulp and paper making instead of separating the two operations.