13 resultados para Nuclear power plants.

em Brock University, Canada


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Welland Power and Supply Canal Company Limited, established in 1893 and incorporated in 1894 with a capital stock of $500,000. The aim of the company was to harness the natural water supply of the Niagara and Welland Rivers. In 1898 the Canadian Electrical News published a report by Henry Symons, QC outlining the main project of the company. This project involves the construction of a canal from the Welland River to the brow of the mountain at Thorold, a distance of 8 miles; the construction at Thorold of a power house, and from Thorold to Lake Ontario, a raceway by which to carry water into the lake. The estimate for the machinery to generate 100,000 horse power is £125,000; for transmission line to Toronto at a voltage of 10,000….The total estimate therefore amounts to £2,452,162, or roughly speaking, $12,000,000. Source: Canadian Electrical News, August 1898, p. 172. In 1899 the company officers petitioned the federal government desiring a name change to the Niagara-Welland Power Company Limited. Officers of the company were Harry Symons, President; Charles A. Hesson, Vice-President; and M.R. O’Loughlin, James B. Sheehan, James S. Haydon, Frederick K. Foster, directors; John S. Campbell, secretary-treasurer. The company’s head offices were located in St. Catharines, with a New York (City) office on Broad Street. In 1905 and 1909 the company petitioned the federal government for additional time to construct its works, which was granted. The company had until May 16, 1915 to complete construction. John S. Campbell (1860-1950) was a graduate of the University of Toronto and Osgoode Hall. During his university years John began his military career first in "K" Company, Queens Own rifles and then later as Commanding Officer of the 19th Lincoln Regiment, from 1906 to 1910. Upon his return to St. Catharines John Campbell served as secretary in the St. Catharines Garrison Club, a social club for military men begun in 1899. After being called to the Bar, he became a partner in the firm of Campbell and McCarron and was appointed to the bench in 1916, serving until retirement in 1934. Judge Campbell served as an alderman for several terms and was the mayor of St. Catharines in 1908 and 1909. He also served as the first chairman of the St. Catharines Public Utilities in 1914. John S. Campbell was married to Elizabeth Oille, daughter of Jerome B. and Charlotte (St. John) Oille. The family home "Cruachan" was located at 32 Church St.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Public Ownership League of America Conference, September 10th to 13th, 1923, at Toronto, Ontario.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The thesis presents a comparison of the national energy policies of the Federal Republic of Germany and Canada from 1973 until the late 1980s. The purpose of this paper is to analyze whether economic and/or environmental concerns were responsible for changes in the· West-German and Canadian national energy policies. Furthermore, the feasibility of implementing a soft energy path in West-Germany and Canada is examined. For better comprehension of the policy-making process and implemented changes in the national energy policies of the two states, the West-German and Canadian parliamentary systems and the political cultures were compared. For the analysis, several events with international impact were taken as guidelines. Furthermore, based on statistical data, the West-German and Canadian energy production and consumption were analyzed. With reference to these results the degree of the de facto changes in the national energy policies were analyzed. In addition, the thesis discusses the possibilities which a soft energy path offers to both national governments to renounce themselves from the dependencies on a few energy resources. The thesis reveals that changes in the West-German and Canadian national energy policies, in their energy production and consumption are correlated to various world events. In particular, governmental reponses security of energy supply by the two international oil crises of 1973 and 1979/1980 demonstrate that changes in the West-German and Canadian national energy policies were implemented in reaction to economic concerns than environmental ones. With the policies "away from oil" and "off oil", the West-German and Canadian government implemented the i i substitution of oil through various diverse energy supply resources. However, energy savings concepts and policies were initiated through the first oil crisis in 1973. The world recessions in 1975 and 1982 had no 'profound impacts on the agenda of West-German and Canadian energy policies. As a consequence of the stagnation or the negative growth of the world economic market, changes in their energy production and consumption can be perceived. However, the West-German and Canadian energy production and consumption intensified with the augmentation of the world economy. During the period of study, environmental concerns were taken into account in the energy policy agendas of the Federal Republic of Germany and Canada but they were not of primary concern. wi thin the decade of. the 1980s notably more environmental considerations were taken into account in the energy policies of the two states. The two nuclear reactor accidents in 1979 and 1986 sharpened to various degrees West-German and Canadian public discourse of present energy supply mix and attitude towards energy production and consumption. The statistical data reflects yet no changes in the energy policies in regard to the position of nuclear power. However, in the next several years possible changes can be observed through statistical data, because the planning, the construction and possible phase out of nuclear power requires several years. Finally, the thesis reveals that the implementation of a soft energy path requires profound changes in the consumer behaviour. As several studies indicate, a soft energy path is technological and economically feasible for the Federal Republic of Germany and Canada, its implementation remains to be a political decision.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Caption title.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Issued with the Business Men's Association, Niagara Falls, N. Y. The water-power of the Falls of Niagara applied to manufacturing purposes. Buffalo, 1890.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Electrical Development Company of Ontario was created in 1903. It was one of three private power companies that had water power leases with the Niagara Parks Commission, but was the only one that was financed with Canadian capital. The company built the Toronto Power Generating Station at Niagara Falls beginning in 1906, and the power house was completed in 1913. During the construction, there was much debate about whether the utility should remain privately operated or become a public utility. In 1920, the company became part of the public utility.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Adam Beck, chairman. C. B. Smith, chief engineer.