14 resultados para Northern Pacific Railroad Company.
em Brock University, Canada
Resumo:
The new California Line via Atchison, Topeka and Santa Fe Railroad and Southern Pacific Railroad. This schedule is torn. This does not affect text, n.d.
Resumo:
William Alexander Thomson (1816-1878) was a promoter and developer of railway systems in western Ontario. He incorporated the Fort Erie Railroad Company in 1857, purchased the Erie and Ontario Railroad in 1863, and incorporated the Erie and Niagara Extension Railway Company in 1868 (later renamed the Canada Southern Railway). Thomson was also elected to the House of Commons for Welland in 1872, and re-elected in 1874. He was known for his support of public management of the currency and is seen as a pioneer advocate of government monetary policy. He was also an advocate of radical agrarian economic doctrine, believing that Canadian laws favoured mercantile interests over those of the producers of goods, and that this hindered national development.
Resumo:
Certificate (vellum) to announce that Thomas Henderson is to be Captain of a company of the Northern Regiment of Local Militia in the County of Northumberland, England. The document is stained, faded and contains holes. The text is slightly affected. The signature on this document has been cut away, Sept. 4, 1813.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension for W.G. Thompson for the Northern Division. There are attached notes from the Welland Railway Company to John Mitchell for putting up shelves; to William Waud, staff; and to William Martin to repair the office (copy), June 10, 1857.
Resumo:
A distinctive period of global change occurred during the PUocene between the warm Miocene and subsequent Quaternary cooling. Samples from Ocean Drilling Project Site 11 79 (-5586 mbsl, 41°4'N, 159°57'E), Site 881 (-5765 mbsl, 47°6.133'N, 161°29.490'E) and Site 882 (-3255 mbsl, 50°22'N, 167°36'E) were studied to determine the magnitude and composition ofterrigenous flux to the western mid-latitude North Pacific and its relation to climate change in East Asia since the mid-Pliocene. Dust-sized particles (including pollen), sourced from the arid regions and loess plateaus in East Asia are entrained by prevailing westerly winds and transported to the midlatitude northwest North Pacific Ocean. This is recorded by peaks in the total concentration of pollen and spores, as well as the mean grain size of allochthonous and autochthonous silicate material in abyssal marine sediments. Aridification of the Asian interior due to the phased uplift of the Himalayan-Tibetan Plateau created the modem East Asian Monsoon system dominated by a strengthening of the winter monsoon. The winter monsoon is further enhanced during glacials due to the expansion of desert and steppe environments at the expense ofwoodlands and forests recorded by the composition of palynological assemblages. The late Pliocene-Pleistocene glacials at ODP Sites 1 179, 881, and 882 are characterized by increases in grain size, magnetic susceptibility, pollen and spore concentrations around 3.5-3.3, 2.6-2.4, 1.7-1.6, and 0.9-0.7 Ma (ages based on magnetostratigraphic and biostratigraphic datums). The peaks during these times are relatively rich in pollen taxa derived primarily from steppe and boreal vegetation zones, recording cool, dry climates. The overall size increase of sediment and abundance of terrestrial palynomorphs record enhanced wind strength. The increase in magnitude of pollen and spore concentrations as well as grain size record global cooling and Northern Hemisphere glaciation. The peaks in grain size as well as pollen and spore abundance in marine sediments correlate with the mean grain size of loess in East Asia, consistent with the deflation of unarmoured surfaces during glacials. The transport of limiting nutrients to marine environments enhanced sea surface productivity and increased the rate of sediment accumulation.
Resumo:
"Illustrated with maps, and numerous engravings from original sketches."
Resumo:
Cross sections of excavation required to make a ditch on the earth side of the railroad near Port Dalhousie. This is a 12 page booklet of hand- drawn charts and diagrams which is slightly stained. Text is not affected, Mar. 1860.
Resumo:
Pay roll voucher #13 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Northern Division for the month of April, 1857 approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, April 27, 1857.
Resumo:
Pay roll voucher # 17 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division for the month of May, 1857, approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, May 27, 1857.
Resumo:
Voucher #22 to James McCoppen (copy) which includes a letter from James McCoppen regarding a claim for having water backed up into his grain and grass by the embankment of the railroad. The letter is dated June 24, 1857 and the voucher is dated Jul. 1, 1857.
Resumo:
Pay roll voucher #25 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division, for the month of July, 1857 approved by F. Shanly, chief engineer and W. G. Thompson (copy), July 30, 1857.
Resumo:
The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.