126 resultados para Niagara River

em Brock University, Canada


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A portfolio of 50 folio and 103 vignette etchings, printed on fine china paper, which has been pressed into a sturdy hand-made paper. The plates were printed by J.H. Daniels of Boston in black, brown, sepia or blue ink. All prints are dated, numbered, and signed or initialed in the plate by Sangster, and the folio prints have pencil signatures. Vol. 1. Vignettes (nos. 1-53) -- vol. 2. Vignettes (nos. 54-103) -- vol. 3. Plates (vol. 1 and 2, nos. 1-50).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A portfolio of 50 folio and 103 vignette etchings, printed on fine china paper, which has been pressed into a sturdy hand-made paper. The plates were printed by J.H. Daniels of Boston in black, brown, sepia or blue ink. All prints are dated, numbered, and signed or initialed in the plate by Sangster, and the folio prints have pencil signatures. Vol. 1. Vignettes (nos. 1-53) -- vol. 2. Vignettes (nos. 54-103) -- vol. 3. Plates (vol. 1 and 2, nos. 1-50).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A portfolio of 50 folio and 103 vignette etchings, printed on fine china paper, which has been pressed into a sturdy hand-made paper. The plates were printed by J.H. Daniels of Boston in black, brown, sepia or blue ink. All prints are dated, numbered, and signed or initialed in the plate by Sangster, and the folio prints have pencil signatures. Vol. 1. Vignettes (nos. 1-53) -- vol. 2. Vignettes (nos. 54-103) -- vol. 3. Plates (vol. 1 and 2, nos. 1-50).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Niagara River Remedial Action Plan was part of an initiative to restore the integrity of the Great Lakes Basin ecosystem. In 1972, the Great Lakes Water Quality Agreement was signed by both Canada and the United States to demonstrate their commitment to protecting this valuable resource. An amendment in 1987 stipulated that Remedial Action Plans (RAPs) be implemented in 43 ecologically compromised areas known as Areas of Concern. The Niagara River was designated as one of these areas by federal and provincial governments and the International Joint Commission, an independent and binational organization that deals with issues concerning the use and quality of boundary waters between Canada and the United States. Although the affected area included parts of both the Canadian and American side of the river, Remedial Action Plans were developed separately in both Canada and the United States. The Niagara River (Ontario) RAP is a three-stage process requiring collaboration between numerous government agencies and the public. Environment Canada, the Ontario Ministry of the Environment, and the Niagara Peninsula Conservation Authority are the agencies guiding the development and implementation of the Niagara River (Ontario) RAP. The first stage is to determine the severity and causes of the environmental degradation that resulted in the location being designated an Area of Concern; the second stage is to identify and implement actions that will restore and protect the health of the ecosystem; and the third stage is to monitor the area to ensure that the ecosystem’s health has been restored. Stage one of the RAP commenced in January 1989 when a Public Advisory Committee (PAC) was established. This committee was comprised of concerned citizens and representatives from various community groups, associations, industries and municipalities. After several years of consultation, the Niagara River (Ontario) Remedial Action Plan Stage 2 Report was released in 1995. It contained 16 goals and 37 recommendations. Among them was the need for Canadians and Americans to work more collaboratively in order to successfully restore the water quality in the Niagara River. Stage three of the Niagara River (Ontario) RAP is currently ongoing, but it is estimated that it will be completed by 2015. At that point, the Niagara River Area of Concern will be delisted, although monitoring of the area will continue to ensure it remains healthy.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

1 map :|bdigital, JPEG file

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The description of the image reads "(18) Looking over the 'Whirlpool' and down the River - from Canadian side - Niagara, U.S.A."

Relevância:

70.00% 70.00%

Publicador:

Resumo:

"Illustrated by maps of the Falls and immediate vicinity, and of the Niagara River, from Lake Erie to Lake Ontario, and six new views."

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The lithograph, "General view of lands, tunnel and docks of Niagara River Hydraulic Tunnel, Power and Sewer Company," called for p. [4] in the Index, has been removed and encapsulated, and is shelved separately.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Consists of 33 postcards featuring various scenes and landmarks in the Niagara region. The postcards feature the Great Gorge Route, the Niagara River and Falls, Queenston Heights, Ridley College, military camps in Niagara-on-the-Lake, and a Catholic Church in Port Colborne. Most of the postcards are blank, but four have been postmarked. One of these is addressed to Miss Ada Misner, Espanola, Ont., from M.G. and is postmarked August 18, 1908. Another postcard is addressed to Mr. Alfred H. Smith, Stamford Hill, London N., from Hedley Smith, France and is postmarked 1902. Another is addressed to Miss Annabel Bishop, Buffalo, N.Y. from Irene Lalour(?), and is postmarked April 30, 1908. The last postcard is addressed to Miss Edna Lackie, Toronto, from R.M. and is postmarked August 1, 1910.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In 1846, the governments of Upper Canada and the State of New York initiated the creation of two companies that would be authorized to build a bridge over the Niagara River. The bridge was to be owned by both companies, respectively known as the Niagara Falls Suspension Bridge Company (Canadian) and the International Bridge Company (American). A suspension bridge was completed in 1848. This bridge was later replaced by a second suspension bridge that accommodated railways, built in 1853-54. However, the increasing weight of trains made it necessary for the bridge to be redesigned, and a third bridge was completed in 1886. Eventually, this bridge was replaced by a steel arch bridge, which was completed in 1897.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Niagara Parks Commission administrative headquarters are located in Oak Hall which is on the cliff above Dufferin Islands. In 1798 this land was granted by the crown to United Empire Loyalist James Skinner until 1898. A century later it was the home of the Clarks, Streets and Macklems. These families controlled the mills of Bridgewater which was a pioneer industrial village located at Dufferin Islands. Then, it was known as Clark Hill. Colonel Thomas Clark, commander of the Second Lincoln Militia in the War of 1812 is the earliest known occupant of the house. When Clark died in 1837, the house went to Thomas Clark Street who was the son of the Colonel’s partner. Mr. Street was a bachelor and his sister, widow of Dr. T.C. Macklem, managed his household. Mrs. Macklem had 2 sons. The eldest son drowned in the Niagara River at the age of 8 and the younger son, Sutherland became heir to the estate. Mr. Macklem opened Cynthia Islands and Cedar Island to the public and had roads built to reach them. Two suspension bridges connected them to the mainland and tolls were charged on the bridges. The improvements to the land cost Macklem $18,962. He called the bridges “Bridge Castor” and “Bridge Pollux”. There was also an office built at the end of Bridge Castor. Macklem also spent $454 fixing up the Burning Spring Building (the burning spring is enclosed in a barrel which collects gas and lets it out through a tube at the top). Macklem received a yearly income of $56,378.79 from tourists and visitors. In 1887 Cynthia Islands and Cedar Island were deeded to the crown and became part of Queen Victoria Park. The name Cynthia was changed to Dufferin in honour of Lord Dufferin. Sources: www.niagarafrontier.com/parks.html www.niagarafrontier.com/burningsprings.html