3 resultados para Multi-Criteria Decision Aid (MCDA)
em Brock University, Canada
Resumo:
Bank stabilization structures are used to prevent the loss of valuable land within the urban environment and the decision for the type of structure used depends on the properties of the stream. In the urban areas of Southern Ontario there is a preference for the use of armourstone blocks as bank stabilization. The armourstone revetment is a free standing stone structure with large blocks of stone layered vertically and offset from one another. During fieldwork at Forty Mile Creek in Grimsby, Ontario armourstone failure was identified by the removal of two stones within one column from the wall. Since the footer stones were still in place, toe scour was eliminated as a cause of failure. Through theoretical, field, and experimental work the process of suction has been identified as a mode of failure for the armourstone wall and the process of suction works similarly to quarrying large blocks of rock off bedrock streambeds. The theory of lateral suction has previously not been taken into consideration for the design of these walls. The physical and hydraulic evidence found in the field and studied during experimental work indicate that the armourstone wall is vulnerable to the process of suction. The forces exerted by the flow and the resistance of the block determine the stability of the armourstone block within the wall. The design of the armourstone wall, high surface velocities, and short pulses of faster flowing water within the profile could contribute to armourstone failure by providing the forces needed for suction to occur, therefore adjustments to the design of the wall should be made in order to limit the effect.
Resumo:
Feature selection plays an important role in knowledge discovery and data mining nowadays. In traditional rough set theory, feature selection using reduct - the minimal discerning set of attributes - is an important area. Nevertheless, the original definition of a reduct is restrictive, so in one of the previous research it was proposed to take into account not only the horizontal reduction of information by feature selection, but also a vertical reduction considering suitable subsets of the original set of objects. Following the work mentioned above, a new approach to generate bireducts using a multi--objective genetic algorithm was proposed. Although the genetic algorithms were used to calculate reduct in some previous works, we did not find any work where genetic algorithms were adopted to calculate bireducts. Compared to the works done before in this area, the proposed method has less randomness in generating bireducts. The genetic algorithm system estimated a quality of each bireduct by values of two objective functions as evolution progresses, so consequently a set of bireducts with optimized values of these objectives was obtained. Different fitness evaluation methods and genetic operators, such as crossover and mutation, were applied and the prediction accuracies were compared. Five datasets were used to test the proposed method and two datasets were used to perform a comparison study. Statistical analysis using the one-way ANOVA test was performed to determine the significant difference between the results. The experiment showed that the proposed method was able to reduce the number of bireducts necessary in order to receive a good prediction accuracy. Also, the influence of different genetic operators and fitness evaluation strategies on the prediction accuracy was analyzed. It was shown that the prediction accuracies of the proposed method are comparable with the best results in machine learning literature, and some of them outperformed it.
Resumo:
This study examined the operational planning, implementation and execution issues of major sport events, as well as the mitigation and management strategies used to address these issues, with the aim of determining best practices in sport event operational planning. The three Research Questions were: 1) What can previous major sport events provide to guide the operational management of future events? 2) What are the operational issues that arise in the planning and execution of a major sport event, how are they mitigated and what are the strategies used to deal with these issues? 3) What are the best practices for sport event operational planning and how can these practices aid future events? Data collection involved a modified Delphi technique that consisted of one round of in-depth interviews followed by two rounds of questionnaires. Both data collection and analysis were guided by an adaptation of the work of Parent, Rouillard & Leopkey (2011) with a focus on previously established issue and strategy categories. The results provided a list of Top 26 Prominent Issues and Top 17 Prominent Strategies with additional issue-strategy links that can be used to aid event managers producing future major sport events. The following issue categories emerged as having had the highest impact on previous major sport events that participants had managed: timing, funding and knowledge management. In addition, participants used strategies from the following categories most frequently: other, formalized agreements and communication.