32 resultados para London, Brighton, and South Coast Railway.

em Brock University, Canada


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most research on southern Africa focuses on the total dependency of the region's states--Angola, Botswana, Lesotho, Malawi, Mozambique, Swaziland, zambia and Zimbabwe--upon the dominant power, South Africa. This thesis examines the relationship between South Africa and Zimbabwe and argues that these two states are more interdependent than dependency scholars would acknowledge. Although a study of the historical period reveals that dependency theory, as defined by Raul Prebisch, Andre Gunder Frank and A. Valenzuela, is helpful for understanding the development of relations between the two states, it is unable to account for many of the characteristics of the relationship which are found in the contemporary context, especially since 1980. An examination of various economic areas of interaction, including investment, trade and transportation, as well as the political realm, indicates that each state exhibits a degree of dependence upon the other. Thus, it is possible to characterize the relationship as one of "mutual dependence," or interdependence as defined by Robert Keohane and Joseph S. Nye. Interdependence is further examined through the concepts of sensitivity and vulnerability. Sensitivity signifies the ability of a state to respond effectively to policy changes made by another state wi thin a given area of interaction without incurring large costs, while vulnerability denotes that an actor is unable to respond, or only at great cost. By applying these concepts to the relationship between Zimbabwe and South Africa, it is determined that although South Africa tends to be sensitive while Zimbabwe is generally vulnerable, the degrees to which these two states are sensi ti ve and vulnerable varies over time and issue area. As the changes wi thin South Africa start to affect relations wi th the rest of southern Africa, it wi 11 be necessary to understand the interaction between the states from an interdependency perspective if cooperation within the region wi 11 be successful. By appl ying an interdependence framework, this study aims at contributing to the understanding of relations among the countries of southern Africa in general, and between South Africa and Zimbabwe in particular.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Interior layered deposits within an embayment in the northern as well as near the southern wall of Coprates Chasma in the Valles Marineris, Mars are studied using HRSC, CTX, HiRISE and CRISM data. In the northern embayment, layered deposits outcrop in three separate locations (a western deposit, a central deposit and an eastern deposit). The central layered deposit in the north has a stratigraphic thickness of 2 km. The western layered deposit abuts against the chasma wall appearing to have a relatively un-eroded depositional surface. The eastern deposit is near a landslide scar which appears to have exposed basement layering showing downward displacement. This northern embayment is suggested to have been an ancestral basin. The triangular edged deposit near the southern wall of Coprates Chasma has an elongated mound protruding from the central edge and is suggested to be the outer limits of a fault block which is back rotated 6° south. The rotation may be the result of the Valles Marineris opening.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Indenture of release regarding a loan of 12, 500 pounds which Samuel Zimmerman (deceased) is said to have lent and advanced to the Woodstock and Lake Erie Railway and Harbour Company. This is put forward by the executors who include: Joseph A. Woodruff, Richard Woodruff, John L. Ranney and Richard Miller. This document releases and exonerates the Railway Company from any debts to the executors. [The outside of the document says 1857, but the actual date is Feb. 10, 1858].

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Indenture of release stating that all existing contracts and agreements made by the Woodstock and Lake Erie Railway Co. are cancelled. This release was between the executors of Samuel Zimmerman's will and the Woodstock and Lake Erie Railway Co. February 10, 1858.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Indenture of deed of land situate between The St. Catharines and Niagara Central Railway Company and Samuel DeVeaux Woodruff of St. Catharines regarding parts of Lots no. 12 and 13 30 in the 8th Concession of the Township of Grantham. This was registered at Merritton on Feb. 2, 1891 – instrument no. 1021, Aug. 16, 1890.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Clipping of notices from the Woodstock and Lake Erie Railway and Harbour Company and the Buffalo, Brantford and Goderich Railway, 1853.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mr. Woodward’s timetable regarding the suspension bridge to Toronto via the Great Western Railway and Port Dalhousie Railway (1 page, handwritten), Jan. 22, 1856

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July, August and September, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of April and May, 1854, signed by S.D. Woodruff, May 31, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July, August and September, 1854, signed by S.D. Woodruff, Sept. 30, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of October, November and December, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of October, November and December, 1854, signed by S.D. Woodruff, Jan. 8, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of January and February, 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of October, January, February and March, 1855, signed by S.D. Woodruff, Mar. 22, 1855.