10 resultados para Lightening schedule
em Brock University, Canada
Resumo:
Self-controlled KR practice has revealed that providing participants the opportunity to control their KR is superior for motor learning compared to participants replicating the KR schedule of a self-control participant, without the choice (e.g., yoked). The purpose of the present experiment was two-fold. First, to examine the utility of a self-controlled KR schedule for learning a spatial motor task in younger and older adults and second, to determine whether a self-controlled KR schedule facilitates an increased ability to estimate one’s performance in retention and transfer. Twenty younger adults and 20 older adults practiced in either the self-control or yoked condition and were required to push and release a slide along a confined pathway using their non-dominant hand to a target distance. The retention data revealed that as a function of age, a self-controlled KR schedule facilitated superior retention performance and performance estimations in younger adults compared to their yoked counterparts.
Resumo:
Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.
Resumo:
Denver and Rio Grande Railway schedule, 1881.
Resumo:
The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.
Resumo:
“Frisco Line” St. Louis and San Francisco Railway the direct line through St. Louis schedule, Jan. 9, 1882.
Resumo:
Union Pacific Railway from Kansas City , Omaha, St. Joseph to Denver, San Francisco, Portland, Helena, Butte, Boise, Leadville, Durango, Deadwood and all cities and mining camps in the west schedule, Jan. 15, 1882.
Resumo:
Wabash St. Louis and Pacific Railway schedule, 1882.
Resumo:
Iron Mountain Route Railway schedule: the great through line St. Louis, Arkansas and Texas to the Hot Springs of Arkansas.
Resumo:
Union Pacific Railway: the Kansas and Nebraska route schedule, 1882.
Resumo:
This document is very badly burned, it includes: a schedule of construction, May 28, 1855 and value of work used for constructing the bridge crossing at Chippawa Creek, Oct. 1857. It is signed by S.D. Woodruff (3 pages, handwritten). Almost all text is illegible, 1857