32 resultados para Forestry extension
em Brock University, Canada
Resumo:
List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Voucher #2 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for surveys, paid to Daniel Plumsteel, Dec. 31, 1856.
Resumo:
Voucher #3 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for sinking test pits, paid to Thomas Woods, Dec. 31, 1856.
Resumo:
Voucher #5 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to George Forbes for surveys, Jan. 31, 1857.
Resumo:
Voucher #6 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to Thomas Woods for surveys, Jan. 31, 1857.
Resumo:
Voucher #7 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to W.G. Thompson accompanied by an abstract of vouchers and summaries of account paid by W.G. Thompson for surveys, Jan. 31, 1857.
Resumo:
Pay roll voucher #8 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for surveys in the month of February, Feb. 28, 1857.
Resumo:
Voucher #9 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to W. G. Thompson accompanied by an abstract of vouchers for surveys, Feb. 28, 1857
Resumo:
Pay roll voucher #10 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the engineer corps. , Mar. 31, 1857.
Resumo:
Voucher #15 from the Engineer Department of Port Dalhousie and Thorold Railway Extension to A. H. Armour for office supplies, Apr. 1, 1857.
Resumo:
Pay roll voucher #12 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the office approved by F. Shanly, chief engineer, April, 1857.
Resumo:
Pay roll voucher #13 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Northern Division for the month of April, 1857 approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, April 27, 1857.