List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis explored Canadian high performance Athletes' perceptions of the fairness of the SDRCC sport-specific arbitral process. Leventhal’s (1980) model of procedural justice judgment was found to be an effective tool for exploring Athletes’ perceptions of the fairness of the process. Five of his six procedural justice antecedents: consistency, bias suppression, accuracy of information, representativeness, and ethicality influenced the Athletes’ perceptions of the fairness of the process. Emergent data also revealed that the Athletes’ perceptions of fairness were also influenced by three contextual factors and an additional antecedent of procedural justice. Efficiency of the process, inherent power imbalance between Athletes and NSOs, and the measurable effect of the process on personal and professional relationships differentiate sport-specific arbitration from most other processes of allocation. The data also indicated that the opportunity to voice one’s case was also an important determinant of the Athletes’ perceptions of the fairness of the process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #10 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the engineer corps. , Mar. 31, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #12 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the office approved by F. Shanly, chief engineer, April, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #13 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Northern Division for the month of April, 1857 approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, April 27, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #14 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Southern Division for the month of April, 1857 approved by F. Shanly, chief engineer and Francis A. Doyle, assistant engineer, April 28, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher # 17 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division for the month of May, 1857, approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer, May 27, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #16 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the office approved by F. Shanly, chief engineer, May 30, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #18 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Southern Division approved by F. Shanly, chief engineer and F.A. Doyle assistant engineer, May 31, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #20 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division approved by F. Shanly, chief engineer and W.G. Thompson, assistant engineer (copy) June 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #21 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Southern Division approved by F. Shanly, chief engineer and Francis A. Doyle, assistant engineer (copy) June 29, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #26 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Southern Division, for the month of July, 1857 approved by F. Shanly, chief engineer and Francis A. Doyle (copy), July 28, 1857.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pay roll voucher #24 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the office, for the month of July, 1857 approved by F. Shanly, chief engineer (copy), July 31, 1857.