20 resultados para EXPORT PLAN

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pre 1913 plan showing the Grand Central Hotel and Santorium Co. Ltd. on St. Paul Street, St. Catharines, Ont.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Master Plan Phase 2. Map of the original 1964 master plan showing the planned campus layout and distances from the centre of campus (ie. the Tower).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Master Plan Phase 2. This overhead map of the original 1964 Master Plan shows the planned campus layout along the escarpment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1969-70 floor plan for the old Glenridge Campus located at Glenridge and Lockhart. For a more detailed copy, please contact the archives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Low levels of ionizing radiation induce two translocation responses in soybean: a reduction in photoassimilate export from leaves and a change in the distribution pattern of exported photoassimilate within the plant. In this investigation these responses have been further studied specifically to ascertain the site of radiation damage and to better understand the physiological responses observed. Experimentally the primary data was obtained from studies in which a mature trifoliate leaf of a young soybean plant (Glycine ~ L. cultivar Harosoy '63) is isolated in a closed transparent chamber and allowed to photoassimilate 14C02 for 15 minutes. This is followed by an additional 45 ~_il'1;ute period before the plant is sectl.o ne d an d 14 C-ra dl' oactl.v.l ty d eterml. ne d'l n a 11 parts. Such 14c data provides one with the magnitude and distribution pattern of translocation. Further analyses were conducted to determine the relative levels of the major photosynthetic products using the techniques of paper chromatography and autoradiography. Since differences between control and irradiated P 1 ants were not 0 b serve d l' n t h e par tl't"lo nlng 0 f 14 C between the 80% ethanol-soluble and -insoluble fractions 14 or in the relative amounts of C-products of photosynthesis, the reduction in export in irradiated plants is not likely due to reduced availability of translocatable materials. Data presented in this thesis shows that photoassimilate export was not affected by gamma radiation until a threshold dose between 2.0 and 3.0 krads was reached. It was also observed that radiation-induced damage to the export process was capable of recovery in a period of 1 to 2 hours provided high light intensity was supplied. In contrast, the distribution pattern was shown to be extremely radiosensitive with a low threshold dose between .25 and .49 krads. Although this process was also capable of recovery,lt" occurred much earlier and was followed by a secondary effect which lasted at least for the duration of the experiments. The data presented in this thesis is interpreted to suggest that the sites of radiation action for the two translocation responses are different. In regards to photoassimilate export, the site of action of ionizing radiation is the leaf, quite possibly the process of photophosphorylation which may provide energy directly for phloem loading and for membrane integrity of the phloem tissue* In regards to the pattern of distribution of exported photoassimilate, the site is likely the apical sink, possibly the result of changes of levels of endogenous hormones. By the selection of radiation exposure dose and time post-irradiation, it is possible to affect independently these two processes suggesting that each may be regulated independent of the other and involves a distinct site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Municipalities that engage in recreation planning have the potential to use their resources more effectively. However, successful planning means getting the plan off the shelf and implemented. This study investigated the factors that influenced municipal recreation plan implementation in three municipalities. Interviews were conducted with eleven key informants (recreation directors, planning consultants, a city councillor, and members of plan steering committees). The findings of this study suggested that because the implementation of recreation plans occurs in a highly political environment, recreation professionals will need effective strategies to get their plans implemented and that implementation can be facilitated by developing or expanding strategies that: (l) build the power of the recreation department within the municipal government structure; (2) build support for recreation within the local community; and (3) build the political and organizational capacity in the recreation department.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1 map :|bdigital, JPEG file

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map and description of the land at the cut of the Chippewa or Welland River. Created by The Welland Canal Company. Included is a drawing of the land along with brief surveyors notes. Noteable features include; bridge, Welland River, road, Stone house, J. Cummings Esq. house, military line, military land, Old Fort, old military draw bridge. Surveyor notes are seen in pencil on the map.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Niagara River Remedial Action Plan was part of an initiative to restore the integrity of the Great Lakes Basin ecosystem. In 1972, the Great Lakes Water Quality Agreement was signed by both Canada and the United States to demonstrate their commitment to protecting this valuable resource. An amendment in 1987 stipulated that Remedial Action Plans (RAPs) be implemented in 43 ecologically compromised areas known as Areas of Concern. The Niagara River was designated as one of these areas by federal and provincial governments and the International Joint Commission, an independent and binational organization that deals with issues concerning the use and quality of boundary waters between Canada and the United States. Although the affected area included parts of both the Canadian and American side of the river, Remedial Action Plans were developed separately in both Canada and the United States. The Niagara River (Ontario) RAP is a three-stage process requiring collaboration between numerous government agencies and the public. Environment Canada, the Ontario Ministry of the Environment, and the Niagara Peninsula Conservation Authority are the agencies guiding the development and implementation of the Niagara River (Ontario) RAP. The first stage is to determine the severity and causes of the environmental degradation that resulted in the location being designated an Area of Concern; the second stage is to identify and implement actions that will restore and protect the health of the ecosystem; and the third stage is to monitor the area to ensure that the ecosystem’s health has been restored. Stage one of the RAP commenced in January 1989 when a Public Advisory Committee (PAC) was established. This committee was comprised of concerned citizens and representatives from various community groups, associations, industries and municipalities. After several years of consultation, the Niagara River (Ontario) Remedial Action Plan Stage 2 Report was released in 1995. It contained 16 goals and 37 recommendations. Among them was the need for Canadians and Americans to work more collaboratively in order to successfully restore the water quality in the Niagara River. Stage three of the Niagara River (Ontario) RAP is currently ongoing, but it is estimated that it will be completed by 2015. At that point, the Niagara River Area of Concern will be delisted, although monitoring of the area will continue to ensure it remains healthy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A plan of part of the lands of the Six Nations Indians, dated January 26, 1833. A note on the plan reads “Part of the lands of the Six Nations Indians as surveyed by order of their Superintendent, John Brant, Esq. Dated at the Mohawk Village, the 29th day of April, 1831. Part of which was returned to the office of the Honourable, the Commissior of Crown Lands, on the 31st Oct. 1831, and now rendered more complete by a continuation of the survey under the same order in 1832, and by information obtained from private practice not connected with my official instructions all of which is most respectfully submitted to the inspection and for the information of His Majesty’s Government by Lewis Burwell, Surveyor”. The map shows the early loyalist land holdings in the Brantford area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A map titled "Plan of Attack of a Iagdkommaudo west of Cantigny on 27 May 1918. There are two sketches and the legend indicates that sketch no. 1 is "Firing until 7A.M." and sketch no. 2 is "Firing after 7A.M."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A map titled "Plan of Organization of Conquered Position". There is a legend at the top right that reads: "Parallel of Surveillance, Parallel of Resistance, Parallel of the Redoubts, Limit between Bns., Final Objective, Final Line after Counter Attack." The map is dated 17 December 1918

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A map titled "Plan of Operation against Cantigny" and dated 17 December 1918.