9 resultados para Discharge channel
em Brock University, Canada
Resumo:
The rate of decrease in mean sediment size and weight per square metre along a 54 km reach of the Credit River was found to depend on variations in the channel geometry. The distribution of a specific sediment size consist of: (1) a transport zone; (2) an accumulation zone; and (3) a depletion zone. These zones shift downstream in response to downcurrent decreases in stream competence. Along a .285 km man-made pond, within the Credit River study area, the sediment is also characterized by downstream shifting accumulation zones for each finer clast size. The discharge required to initiate movement of 8 cm and 6 cm blocks in Cazenovia Creek is closely approximated by Baker and Ritter's equation. Incipient motion of blocks in Twenty Mile Creek is best predicted by Yalin's relation which is more efficient in deeper flows. The transport distance of blocks in both streams depends on channel roughness and geometry. Natural abrasion and distribution of clasts may depend on the size of the surrounding sediment and variations in flow competence. The cumulative percent weight loss with distance of laboratory abraded dolostone is defined by a power function. The decrease in weight of dolostone follows a negative exponential. In the abrasion mill, chipping causes the high initial weight loss of dolostone; crushing and grinding produce most of the subsequent weight loss. Clast size was found to have little effect on the abrasion of dolostone within the diameter range considered. Increasing the speed of the mill increased the initial amount of weight loss but decreased the rate of abrasion. The abrasion mill was found to produce more weight loss than stream action. The maximum percent weight loss determined from laboratory and field abrasion data is approximately 40 percent of the weight loss observed along the Credit River. Selective sorting of sediment explains the remaining percentage, not accounted for by abrasion.
Hydraulic and fluvial geomorphological models for a bedrock channel reach of the Twenty Mile Creek /
Resumo:
Bedrock channels have been considered challenging geomorphic settings for the application of numerical models. Bedrock fluvial systems exhibit boundaries that are typically less mobile than alluvial systems, yet they are still dynamic systems with a high degree of spatial and temporal variability. To understand the variability of fluvial systems, numerical models have been developed to quantify flow magnitudes and patterns as the driving force for geomorphic change. Two types of numerical model were assessed for their efficacy in examining the bedrock channel system consisting of a high gradient portion of the Twenty Mile Creek in the Niagara Region of Ontario, Canada. A one-dimensional (1-D) flow model that utilizes energy equations, HEC RAS, was used to determine velocity distributions through the study reach for the mean annual flood (MAF), the 100-year return flood and the 1,000-year return flood. A two-dimensional (2-D) flow model that makes use of Navier-Stokes equations, RMA2, was created with the same objectives. The 2-D modeling effort was not successful due to the spatial complexity of the system (high slope and high variance). The successful 1 -D model runs were further extended using very high resolution geospatial interpolations inherent to the HEC RAS extension, HEC geoRAS. The modeled velocity data then formed the basis for the creation of a geomorphological analysis that focused upon large particles (boulders) and the forces needed to mobilize them. Several existing boulders were examined by collecting detailed measurements to derive three-dimensional physical models for the application of fluid and solid mechanics to predict movement in the study reach. An imaginary unit cuboid (1 metre by 1 metre by 1 metre) boulder was also envisioned to determine the general propensity for the movement of such a boulder through the bedrock system. The efforts and findings of this study provide a standardized means for the assessment of large particle movement in a bedrock fluvial system. Further efforts may expand upon this standardization by modeling differing boulder configurations (platy boulders, etc.) at a high level of resolution.
Resumo:
The streams flowing through the Niagara Escarpment are paved by coarse carbonate and sandstone sediments which have originated from the escarpment units and can be traced downstream from their source. Fifty-nine sediment samples were taken from five streams, over distances of 3,000 to 10,000 feet (915 to 3050 m), to determine downstream changes in sediment composition, textural characteristics and sorting. In addition, fluorometric velocity measurements were used in conjunction with measured -discharge and flow records to estimate the frequency of sediment movement. The frequency of sediments of a given lithology changes downstream in direct response to the outcrop position of the formations in the channels. Clasts derived from a single stratigraphic unit usually reach a maximum frequency within the first 1,000 feet (305 m) of transport. Sediments derived from formations at the top of waterfalls reach a modal frequency farther downstream than material originating at the base of waterfalls. Downstream variations in sediment size over the lengths of the study reaches reflect the changes in channel morphology and lithologic composition of the sediment samples. Linear regression analyses indicate that there is a decrease in the axial lengths between the intial and final samples and that the long axis decreases in length more rapidly than the intermediate, while the short axis remains almost constant. Carbonate sediments from coarse-grained, fossiliferous units - iii - are more variable in size than fine-grained dolostones and sandstones. The average sphericity for carbonates and sandstones increases from 0.65 to 0.67, while maximum projection sphericity remains nearly constant with an average value of 0.52. Pebble roundness increases more rapidly than either of the sphericity parameters and the sediments change from subrounded to rounded. The Hjulstrom diagram indicates that the velocities required to initiate transport of sediments with an average intermediate diameter of 10 cm range from 200 cm/s to 300 cm/s (6.6 ft./sec. to 9.8 ft./sec.). From the modal velocitydischarge relations, the flows corresponding to these velocities are greater than 3,500 cfs (99 m3s). These discharges occur less than 0.01 p~r cent (0.4 days) of the time and correspond to a discharge occurring during the spring flood.
Resumo:
The Beckman Helium Discharge Detector has been found to be sensitive to the fixed gases oxygen, nitrogen, and hydrogen at detection levels 10-100 times more sensitive than possible with a Bow-Mac Thermal Conductivity Detector. Detection levels o~ approximately 1.9 E-4 ~ v/v oxygen, 3.1 E-4 ~ v/v nitrogen, and 3.0 E-3 ~ v/v hydrogen are estimated. Response of the Helium Discharge Detector was not linear, but is useable for quantitation over limited ranges of concentration using suitably prepared working standards. Cleanliness of the detector discharge electrodes and purity of the helium carrier and discharge gas were found to be critical to the operation of the detector. Higher sensitivities of the Helium Discharge Detector may be possible by the design and installation of a sensitive, solid-state electrometer.
Resumo:
First edition printed by Nathaniel Hickman.
Resumo:
Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.
Resumo:
Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.
Resumo:
Note regarding discharge over waste weirs. This is initialed by S.D. Woodruff, May 4, 1846.
Resumo:
Discharge of Mortgage signed by Henry Kalar, President of the Niagara Permanent Building Society stating that John McNeilly [?] has satisfied all money due and the mortgage is therefore discharged. The right hand side of this document is burned. Text is slightly affected, Aug. 8, 1853.