8 resultados para Culverts
em Brock University, Canada
Resumo:
Chart of bill of timber in bridges, culverts, cattle-guard and roadways, signed by S.D. Woodruff, Oct. 18, 1855.
Resumo:
Approximate estimate of the cost of macadamizing, grading, bridging and putting in culverts from Hurst’s Bridge above Thorold to Port Robinson (2 pages, handwritten), n.d.
Resumo:
Presentation from the Office of Macdonald and Rykert regarding the Case of O’Connor vs. the Great Western Railway Co. This is a handwritten, 9 ½ page double sided document). Some of the witnesses for the plaintiff included: Robert Johnson, John Ryder, Edward Duffy, Gilbert Gregory, John Cutter, James Patterson, Samuel Rush and Francis Bigger, among others. They claimed that the Great Western Railway Co. was destroying their land. Jacob Dittrick claimed that the culverts were not large enough to carry off water. Mr. Jackson noticed injury to his flats. Wild grass was destroying the bottom grass, May 6, 1836.
Resumo:
Letter containing a memorandum of the work done during Nov. 1855 by Messrs. Brown and McDonell. The work done includes track laying and timber in culverts. There is also a section of the road between St. Catharines and the Great Western Railway where earth has been removed, posts set and laid. This is signed by Francis Lalor, Dec. 12, 1855.
Resumo:
Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Letter to S.D. Woodruff that Edward Henderson has completed the excavation below the Marshville culverts and Brown and Henshaw have finished the contract on the tap ditch. This is signed by Fred Holmes, Nov. 5, 1856.
Resumo:
Diagrams (charts and graphs) made into a booklet with a newspaper cover. This booklet contains cross sections of the back ditch on the south side of the Welland Canal feeder, west of the Marshville culverts (45 pages, hand drawn). This was created by Fred Holmes, Oct. 3, 1857.