5 resultados para Concrete bridges.

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

View of the construction of a concrete wall.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Forms and reinforcing steel bars used in the walls of the Aquatic Centre.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Picture Exchange Communication System (PECS) is an augmentative and alternative communicative system that improves communication and decreases problem behaviors in children with Developmental Disabilities and Autism. The mediator model is a validated approach that clinicians use to train parents to perform evidence-based interventions. Parental non-adherence to treatment recommendations is a documented problem. This qualitative study investigated clinician-perceived factors that influence parental adherence to PECS recommendations. Three focus groups (n=8) were conducted with Speech Language Pathologists and Behavior Therapists experienced in providing parents with PECS recommendations. Constant comparison analysis was used. In general, clinicians believed that PECS was complex to implement. Thirty-one bridges were identified to overcome complexity. Twenty-two barriers and 6 other factors also impacted parental adherence. Strategies to address these factors were proposed based on a review of the literature. Future research will be performed to validate these findings using parents and a larger sample size.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction on the Thorold tunnel began in 1965 and was completed in 1967. It was designed by H. G. Acres & Company Ltd. and built by Pitts-Atlas, a joint venture of C.A. Pitts, General Contractor Ltd., and Atlas Construction Company Ltd. The tunnel replaced two lift bridges (Bridge 9 at Ontario Paper Co. and Bridge 7) that carried traffic over the Welland Canal. The majority of the construction occurred during the winter months, when the canal was closed to shipping. The water was drained and concrete sections shaped liked tubes were poured, creating the tunnel. During the summer months, the end sections of the tunnel were constructed so that shipping could continue uninterrupted. The 24 million dollar project was financed jointly by the Department of Highways and the St. Lawrence Seaway Authority. The tunnel was officially opened on September 18, 1968.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of bill of timber in bridges, culverts, cattle-guard and roadways, signed by S.D. Woodruff, Oct. 18, 1855.