8 resultados para Ciclo Rankine

em Brock University, Canada


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A letter from Nikola Tesla to William B. Rankine in the year 1904. Tesla discusses the worth of his patents/companies. Tesla also remarks on the power of several of his machines including "Tesla Coil", "Tesla Transformer", and "Tesla High-Potential Methods".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A letter from 2nd Vice President and General Manager of Canadian General Electric Company, Frederic Nicholls to W. B. Rankine regarding a bid for contract. The letter mentions that the bid for two alternating generators for the Canadian side of Niagara Falls was won by Westinghouse Eletric and Manufacturing Co. Nicholls also mentions that there will be other opportunites to win contracts as more machines are required. Nicholls also implies that Westinghouse may have bid under cost in an effort to secure the first of many contracts with the Canadian Niagara Power Company.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A letter from A. M. Grier to W.B. Rankine referencing the purchase of granite for the "Tunnel Portal Lining". Grier discusses the purchase of granite with MacIntosh Granite and Marble Company for Stanstead Granite. Grier also discusses a wire sent to a Mr. Brock in regards to the purchase and supply of granite for the project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A letter from chief engineer C. Sellers to W. B. Rankine discussing the bid of I. P. Morris Co. Sellers discusses conversation with Mr. Hand of I.P. Morris.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A letter from Second V.P. Frederic Nicholls of Canadian General Electric Co. to W.B. Rankine in regards to transformers. The Canadian Niagara Power Co. has agreed to an order of nine transformers (1250 Killowatt) to be installed in the Power House at Niagara Falls. The transformers will cost the Canadian Niagara Power Company forty three thousand two hundred dollars.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report compiled by Canadian Niagara Power Company describes the loss in capacity due to ice. The chart reveals the kilowatts lost and the duration of the outage and the "min. forebay elevation during ice loss period".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A report outlining the expenses of loss due to ice from the year 1938 through 1941 at the Rankine Station. Included in the report is the lost income due to power outages, operating labour, operating material and the sum of these costs per annum.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of Unit 11 Runner at Rankine Station (5901-2105).