Cost of the railway from Port Dalhousie to St. Catharines (1 page, handwritten), Jan. 11, 1855.
Resumo:
List of [timber railway] piles delivered and driven (1 page, handwritten). This is signed by Alex Morrison, July 1856.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
The Buffalo and Brantford Railway Company was formed in 1850. The railway was renamed the Buffalo, Brantford & Goderich Railway in 1852 to reflect the plans to extend the line to Goderich. Financial problems led to a British group taking over the railway a few years later and the name was changed to the Buffalo & Lake Huron Railway. It was June 1858 before the line to Goderich was completed. Source: (http://brantford.library.on.ca/genealogy/railways.php#buffalo) March 8, 2010
Resumo:
Joseph William Winthrop Spencer (commonly known as J.W. Spencer) was a geologist and geomorphologist best known for his work on the geology of southern Ontario and the Great Lakes. He was born in Dundas, Upper Canada in 1851, but moved to Hamilton, Ontario in 1867. In 1871, he began studies in geology at McGill College in Montreal. In 1875 he worked in the Michigan copper mines and shortly afterwards prepared a thesis on the copper deposits. He submitted this thesis to the University of Gottingen in Germany in 1877 and was awarded a doctorate in geology, the second Canadian to earn a doctorate in this field. In 1880, he became a professor of geology and chemistry at King’s College in Windsor, N.S. Subsequently, he taught at the University of Missouri, and then the University of Georgia, but moved to Washington, D.C. in 1894, where he worked as a consultant geologist. Spencer spent much of his life studying preglacial river valleys in Ontario and the origins of the Great Lakes, as well as the Niagara River and Falls. In 1907, he published a book titled The Falls of Niagara: their evolution and varying relations to the Great Lakes. His opinions in these areas differed from some of his contemporaries, namely the American geologist Grove Karl Gilbert. Gilbert published a review of the The Falls of Niagara that exposed some flaws and inaccuracies in Spencer’s estimate of the age of the falls. Spencer’s studies also took him to the Caribbean and Central America. In 1920 he moved back to Canada, but died the following year.
Resumo:
Indenture of release by executors between Richard Miller, John L. Ranney and Richard Woodruff, all of St. Catharines and Joseph A. Woodruff of Clifton, all executors of the will of Samuel Zimmerman of the first part and The Great Western Railway Company of the second part. Parties of the second part have exonerated parties of the first part to undertake and complete the Sarnia branch of the railway. Also, parties of the first part believe they are entitled to compensation as the death of Zimmerman was caused while travelling on one of the carriages belonging to said company. A sum of $150,000 was agreed upon to be paid to the executors by the Great Western Railway Company, September 7, 1858.
Resumo:
Letter which S.D. Woodruff writes to William Hamilton Merritt about the length of the railway from Port Dalhousie to the Great Western Railway. He says that the distance is 6 miles. From Port Dalhousie to St. Catharines there will 4 miles of rail required for a single track, Mar. 13, 1854.
Resumo:
Letter from S.D. Woodruff which he writes from the office of the Port Dalhousie Thorold Railway Company to George Rykert. He submits an abstract of prices of people to undertake the construction of the railway from Port Dalhousie, Mar. 30, 1854.
Resumo:
Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.
Indenture between The St. Catharines and Niagara Central Railway Company and Samuel DeVeaux Woodruff
Resumo:
Indenture of deed of land situate between The St. Catharines and Niagara Central Railway Company and Samuel DeVeaux Woodruff of St. Catharines regarding parts of Lots no. 12 and 13 30 in the 8th Concession of the Township of Grantham. This was registered at Merritton on Feb. 2, 1891 – instrument no. 1021, Aug. 16, 1890.
Resumo:
Letter from the Michigan Central Railway to S.D. Woodruff regarding the construction of a fence, June 16, 1883.