2 resultados para Association Rate

em Brock University, Canada


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Variation in hiring procedures occurs within fire service human resource departments. In this study, City 1 and City 2 applicants were required to pass their biophysical assessments prior to being hired as firefighters at the beginning and end of the screening process, respectively. City 1 applicants demonstrated significantly lower resting heart rate (RHR), resting diastolic blood pressure (RDBP), body fat% (BF) and higher z-scores for BF, trunk flexibility (TF) and overall clinical assessment (p<0.05). Regression analysis found that age and conducting the biophysical assessment at the end of the screening process explained poorer biophysical assessment results in BF% (R2=21%), BF z-score (R2=22%), TF z-score (R2=10%) and overall clinical assessment z-score (R2=7%). Each of RHR (OR=1.06, CI=1.01-1.10), RDBP (OR=1.05, CI=1.00-1.11) and BF% (OR=1.20, CI=1.07-1.37) increased the odds of being a City 2 firefighter (p<0.05). Biophysical screening at the end of the hiring process may result in the hiring of a less healthy firefighter.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Association of Major Power Consumers in Ontario (AMPCO) was founded as the Niagara Basic Power Users' Association in the early 1960s. It was a coalition of seven companies in the chemical, pulp and paper, and abrasives industries within the Niagara region. The Association was formed to address increasing electricity rates. In 1974, the name changed to the Association of Direct Customers of Ontario. This change reflected the expansion of the regional Association to a provincial one, which grew in response to Ontario Hydro’s proposed rate increases of over 30 per cent. In 1975, the Association adopted its current name. AMPCO continues to advocate for “electricity rates that are competitive, fair and efficient, and a reliable supply of electrical energy across Ontario.”