5 resultados para ARCHITECTURAL PATRIMONY
em Brock University, Canada
Resumo:
Layout planning is a process of sizing and placing rooms (e.g. in a house) while a t t empt ing to optimize various criteria. Often the r e are conflicting c r i t e r i a such as construction cost, minimizing the distance between r e l a t ed activities, and meeting the area requirements for these activities. The process of layout planning ha s mostly been done by hand, wi th a handful of a t t empt s to automa t e the process. Thi s thesis explores some of these pa s t a t t empt s and describes several new techniques for automa t ing the layout planning process using evolutionary computation. These techniques a r e inspired by the existing methods, while adding some of the i r own innovations. Additional experimenLs are done to t e s t the possibility of allowing polygonal exteriors wi th rectilinear interior walls. Several multi-objective approaches are used to evaluate and compare fitness. The evolutionary r epr e s ent a t ion and requirements specification used provide great flexibility in problem scope and depth and is worthy of considering in future layout and design a t t empt s . The system outlined in thi s thesis is capable of evolving a variety of floor plans conforming to functional and geometric specifications. Many of the resulting plans look reasonable even when compared to a professional floor plan. Additionally polygonal and multi-floor buildings were also generated.
Resumo:
The Oak Ridges Moraine is a major physiographic feature of south-central Ontario, extending from Rice Lake westward to the Niagara Escarpment. While much previous work has largely postulated a relatively simple the origin of the moraine, recent investigations have concentrated on delineating the discernible glacigenic deposits (or landform architectural elements) which comprise the complex mosaic of the Oak Ridges Moraine. This study investigates the sedimentology of the Bloomington fan complex, one of the oldest elements of the Oak Ridges Moraine. The main sediment body of the Bloomington fan complex was deposited during early stages of the formation of the Oak Ridges Moraine, when the ice subdivided, and formed a confined, interlobate lake basin between the northern and southern lobes. Deposition from several conduits produced a fan complex characterized by multiple, laterally overlapping, fan bodies. It appears that the fans were active sequentially in an eastward direction, until the formation of the Bloomington fan complex was dominated by the largest fan fed by a conduit near the northeastern margin of the deposit. Following deposition of the fan complex, the northern and southern ice margins continued to retreat, opening drainage outlets to the west and causing water levels to drop in the lake basin. Glaciofluvial sediment was deposited at this time, cutting into the underlying fan complex. Re-advancing northern ice then closed westerly outlets, and caused water levels to increase, initiating the re-advance of the southern ice. As the southern ice approached the Bloomington fan, it deposited an ice-marginal sediment complex consisting of glacigenic sediment gravity flows, and glaciolacustrine and glaciofluvial sediments exhibiting north and northwesterly paleocurrents. Continued advance of the southern ice, overriding the fan complex, ii produced large-scale glaciotectonic deformation structures, and deposited the Halton Till. The subaqueous fan depositional model that is postulated for the Bloomington fan complex differs from published models due to the complex facies associations produced by the multiple conduit sources of sediment feeding the fans. The fluctuating northern and southern ice margins, which moved across the study area in opposite directions, controlled the water level in the interlobate basin and caused major changes in depositional environments. The influence of these two lobes also caused deposition from two distinct source directions. Finally, erosion, deposition, and deformation of the deposit with the readvance of the southern ice contributed further to the complexity of the Bloomington fan complex.
Resumo:
This thesis describes research in which genetic programming is used to automatically evolve shape grammars that construct three dimensional models of possible external building architectures. A completely automated fitness function is used, which evaluates the three dimensional building models according to different geometric properties such as surface normals, height, building footprint, and more. In order to evaluate the buildings on the different criteria, a multi-objective fitness function is used. The results obtained from the automated system were successful in satisfying the multiple objective criteria as well as creating interesting and unique designs that a human-aided system might not discover. In this study of evolutionary design, the architectures created are not meant to be fully functional and structurally sound blueprints for constructing a building, but are meant to be inspirational ideas for possible architectural designs. The evolved models are applicable for today's architectural industries as well as in the video game and movie industries. Many new avenues for future work have also been discovered and highlighted.
Resumo:
Walter D’Arcy Ryan was born in 1870 in Kentville, Nova Scotia. He became the chief of the department of illumination at the General Electric Company of Schenectady, New York. He was a founder in the field of electrical illumination. He built the electric steam scintillator which had numerous nozzles and valves. The operator would release steam through the valves. The nozzles all had names which included: Niagara, fan, snake, plume, column, pinwheel and sunburst. The steam scintillator was combined with projectors, prismatic reflectors, flashers and filters to produce the desired effects. In 1920 a group of businessmen from Niagara Falls, New York formed a group who called themselves the “generators’. They lobbied the American and Canadian governments to improve the illumination of the Falls. They were able to raise $58, 000 for the purchase and installation of 24 arc lights to illuminate the Falls. On February 24th, 1925 the Niagara Falls Illumination Board was formed. Initially, the board had a budget of $28,000 for management, operation and maintenance of the lights. The power was supplied free by the Ontario Power Company. They had 24 lights installed in a row on the Ontario Power Company surge tank which was next to the Refectory in Victoria Park on the Canadian side. The official opening ceremony took place on June 8th, 1925 and included a light parade in Niagara Falls, New York and an international ceremony held in the middle of the Upper Steel Arch Bridge. Walter D’Arcy Ryan was the illuminating engineer and A.D. Dickerson who was his New York field assistant directed the scintillator. with information from American Technological Sublime by David E. Nye and the Niagara Falls info website Location: Brock University Archives Source Information: Subject Headings: Added Entries: 100 Ryan, W. D’A. |q (Walter D’Arcy), |d 1870-1934 610 General Electric Company 650 Lighting, Architectural and decorative 650 Lighting |z New York (State) |z Niagara Falls 700 Dickerson, A.F. 700 Schaffer, J.W. Related material held at other repositories: The Niagara Falls Museum in Niagara Falls, Ontario has a program (pamphlet) dedicating new lighting in 1958 and it has postcards depicting the illumination of the Falls. Some of Ryan’s accomplishments can be seen at The Virtual Museum of the City of San Francisco. Described by: Anne Adams Date: Sept 26,Upper Steel Arch Bridge. Walter D’Arcy Ryan was the illuminating engineer and A.D. Dickerson who was his New York field assistant directed the scintillator. with information from American Technological Sublime by David E. Nye and the Niagara Falls info website
Resumo:
As the complexity of evolutionary design problems grow, so too must the quality of solutions scale to that complexity. In this research, we develop a genetic programming system with individuals encoded as tree-based generative representations to address scalability. This system is capable of multi-objective evaluation using a ranked sum scoring strategy. We examine Hornby's features and measures of modularity, reuse and hierarchy in evolutionary design problems. Experiments are carried out, using the system to generate three-dimensional forms, and analyses of feature characteristics such as modularity, reuse and hierarchy were performed. This work expands on that of Hornby's, by examining a new and more difficult problem domain. The results from these experiments show that individuals encoded with those three features performed best overall. It is also seen, that the measures of complexity conform to the results of Hornby. Moving forward with only this best performing encoding, the system was applied to the generation of three-dimensional external building architecture. One objective considered was passive solar performance, in which the system was challenged with generating forms that optimize exposure to the Sun. The results from these and other experiments satisfied the requirements. The system was shown to scale well to the architectural problems studied.