13 resultados para (C37:2) (C37:3) (C37:4) flux

em Brock University, Canada


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Badger newspaper gets a new look in this fall issue.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investigations of 2-alkyl-3-methoxypyrazines (2-isopropyl-3-methoxypyra2ine, 2- secbutyl-3-methoxypyrazine and 2-isobutyl-3-niethoxypyrazine) in ladybug species {Coleoptera: Coccinellidae) and wine samples have been conducted. Headspace sampling coupled with gas chromatography-mass spectrometry was used to determine amounts of 2-alkyl-3-methoxypyra2ines in the ladybug species. Hippodamia convergens had the highest amount of alkybnethoxypyrazines, followed by Harmoma axyridis and the least in Coccinella septempunctata. Using a solvent extraction method, the precoccinelline alkaloid was found present in Hippodamia convergens and Coccinella septempunctata but not Harmonia axyridis. Steam distillation followed by a soHd phase extraction method as a sample preparation technique, enhanced detection while the isotope dilution method afforded accurate quantitation of the alkyknethoxypyrazines in the wine samples. Both ladybug-tainted and commercial wine samples were found to contain the 2- alkyl-3-methoxypyrazines. Wine samples prepared in 2001 generally contained higher levels than the corresponding 2003 samples. Levels of the 2-alkyl-3-methoxypyrazines found in the commercial wines ranged from a minimum value of 6 ng/L to 260 ±10 ng/L. Analyses revealed that for both ladybug species and wine samples, the 2- isopropyl-3-methoxypyrazine had the highest concentration, followed by 2-isobutyl- 3-methoxypyrazine and the least being the 2-secbutyl-3-methoxypyrazine. Possible contamination of the wine samples by ladybugs is thoroughly discussed. Furthermore, attempts to remove or reduce the levels of the alkylmethoxypyrazines with molecularly imprinted polymers from wine samples are presented in detail.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Survey map of the Second Welland Canal created by the Welland Canal Company showing the Town of St. Catharines. Identified structures associated with the Canal include Lock 3 and its Lock House, Lock 4 and its Lock House, Hydraulic Race, and a floating tow path. The surveyors' measurements and notes can be seen in red and black ink and pencil. Local area landmarks are also identified and include streets and roads (ex. Geneva Street, Ontario Street, St. Paul Street, and Merritville Road), Lincoln Mills and its Store House, T. M. Merritt's Store House, Cooper Shop, L. Shickluna's Dry Dock, Peter McGill's Grist Mill, J. Flint's Saw Factory, T. Hosteter's Gristing Mill, J. Dougan Builder's shop or office, Norris and Nelson Mill, G. N. Oil Foundry and its Machine Shop and Boiler, a barrel shed, woolen factory, Estate of P. Nihen (or T. Nihan), Norris and Nelson's Wharf, the W. C. Office, and structures (possibly houses) or small properties belonging to T. Adams, and A. K. Boomer. Properties and property owners of note are: Concession 6 Lots 16, 17, and 18, Concession 7 Lots 16, 17, and 18, Alva Dittrick, James R. Benson, W. B. Robinson, and C. Phelps.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Sept. 1854, signed by S.D. Woodruff, Oct. 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Oct. 31, 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Oct. 1854, signed by S.D. Woodruff, Nov. 1854.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month ending Dec. 1, 1854, signed by S.D. Woodruff, Jan. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Scrap of paper that has been burned almost completely. Only the header of the document is intact. It is an estimate of work done by Messrs. Brown and McDonell, contractors on sections 1, 2 and 3 ending at St. Catharines for the months of April and May 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Oct., 1855. This document is water damaged and full of holes. The list of prices is almost completely illegible. The document is signed by S.D. Woodruff, Nov. 1855.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

County of Welland estimate (copy) of work done on sections 2 and 3 of the tap drain at Marshville by George Stanford, signed by S.D. Woodruff. Estimate no.1, July, 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

County of Welland estimate (copy) of work done on sections 2 and 3 of the tap drain at Marshville by George Stanford, signed by S.D. Woodruff. Estimate no.2, Oct., 1856.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chart of land drainage for the Welland Canal final estimate of work done on sections no.1, 2 and 3 on the road below lock no. 2 leading to Port Dalhousie. Work commenced Nov. 1846 and finished July 1847. Road work and the waste weir no.1 to Port Dalhousie work commenced Aug. 1847 and finished Sept. 1847, Nov.1, 1847.