142 resultados para Chicago and North Western Railway Company
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension to Francis A. Doyle for fees at the Fonthill Registry Office (copy), July 28, 1857.
Resumo:
Pay roll voucher #24 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the office, for the month of July, 1857 approved by F. Shanly, chief engineer (copy), July 31, 1857.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension to W.G. Thompson regarding horse hire (copy), Jul. 30, 1857.
Resumo:
Pay roll voucher #25 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Northern Division, for the month of July, 1857 approved by F. Shanly, chief engineer and W. G. Thompson (copy), July 30, 1857.
Resumo:
Canadian National Railway Company (CN) was incorporated in 1919 as a Crown Corporation. The company was formed during the period after World War I and integrated two of the country’s largest railroads, Canadian Northern and Grand Trunk. CN is the largest rail network in Canada and the only transcontinental network in North America. As the use of railways declined, CN diversified its activities during the 1970s, becoming involved in telecommunications , hotels and oil exploration. The next decade saw a period of financial stability, however, the 1990s were a period of decreased profitability. As part of a restructuring to alleviate the company’s financial difficulties , it was privatized in 1995.
Resumo:
Calculations regarding quantities needed for cutting and ditching (1 page, handwritten), March 19, 1884.
Resumo:
Memorandum of expenses for work done and materials provided by Messrs. Brown and McDonell, contractors for the Port Dalhousie and Thorold Railway to Sept. 1, 1854, signed by S.D. Woodruff, Sept. 2, 1854.
Resumo:
Letter containing a memorandum of the work done during Nov. 1855 by Messrs. Brown and McDonell. The work done includes track laying and timber in culverts. There is also a section of the road between St. Catharines and the Great Western Railway where earth has been removed, posts set and laid. This is signed by Francis Lalor, Dec. 12, 1855.
Resumo:
Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.
Resumo:
Memorandum respecting differences between the approximate and the final estimate (3 ¼ pages, handwritten), n.d.
Resumo:
List of the number of loads dredged by Smiley’s Dredge since the 1st of October along the Welland Railway. This is addressed to S.D. Woodruff and signed by James Woodall of Lock No. 1. There are holes and stains in the document. Text is not affected, Jan. 12, 1859.
Resumo:
Diagrams of cross sections on the Welland Railway, Port Dalhousie (4 hand-drawn diagrams), March 1860.
Resumo:
Scrap of paper with numbers of railway journals volume numbers, n.d.
Resumo:
Voucher #22 to James McCoppen (copy) which includes a letter from James McCoppen regarding a claim for having water backed up into his grain and grass by the embankment of the railroad. The letter is dated June 24, 1857 and the voucher is dated Jul. 1, 1857.