Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.
Resumo:
List of Employees to be involved in the extension of the Port Dalhousie and Thorold Railway (1 page, handwritten). This is signed by S.D. Woodruff, Nov. 25, 1856.
Resumo:
Chart of estimate of work done on Port Dalhousie and Thorold Railway in the section between Geneva Street and Thorold Station of the Great Western Railway by John Brown for November, 1856. This is signed by S.D. Woodruff. The document is stained and damaged. Text is slightly affected, Nov. 1856.
Resumo:
List of instruments which are the property of Port Dalhousie and Thorold Railway in the possession of F. Laler. This document is signed by S.D. Woodruff, Dec. 4, 1856.
Resumo:
Chart of Port Dalhousie and Thorold Railway from St. Catharines to Thorold estimates. This document is slightly burnt and torn. Text is slightly affected. It is signed by S.D. Woodruff, Dec. 27, 1856.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Chart outlining Port Dalhousie and Thorold Railway cost of planks, bridge, railway crossing and approaches thereto, n.d.
Resumo:
Prices of John Brown’s contracts for Port Dalhousie and Thorold Railway from Geneva Street to Thorold Station (1 page, handwritten), n.d.
Resumo:
Memorandum of ditching on the line of the Port Dalhousie and Thorold Railway between Port Dalhousie and St. Catharines (1 page, handwritten), n.d.
Resumo:
Note from the Port Dalhousie and Thorold Railway to Mrs. E. Parnell with prices for digging a well, moving a hog pen and repairing a fence, n.d.
Resumo:
Diagrams of cross sections on the Welland Railway, Port Dalhousie (4 hand-drawn diagrams), March 1860.
Resumo:
Cross sections of excavation required to make a ditch on the earth side of the railroad near Port Dalhousie. This is a 12 page booklet of hand- drawn charts and diagrams which is slightly stained. Text is not affected, Mar. 1860.
Resumo:
Port Dalhousie and the Thorold Railway pay roll for services of engineering and contingencies furnished for the months of June, July, August and September, 1854.