627 resultados para Port Credit, Ontario
Resumo:
Editorial (1 typed page) which was printed in the Niagara Falls (Ontario) Evening Review on May 20, 1937, entitled “Captain Creighton Probably called it Clifton First”. This is printed on Lundy’s Lane Historical Society Letterhead by Mrs. Stanley Tolan. The article mentions “Samuel DeVeaux who created a “Niagara Falls Tourist Guide” which was published in 1839, April 24, 1948.
Resumo:
Certificate from the Accounts Branch of Crown Lands, Ontario in receipt of $72 for renewal of license made out to S.D. Woodruff and signed by Thomas H. Johnson, Assistant Commissioner, May 23, 1881.
Resumo:
Letter to George Rykert (president of the Port Dalhousie and Thorold Railway), engineer from William Danforth, civil engineer in which he states that the preliminary survey has been made between Port Dalhousie and Centreville at which point it may intersect with the Great Western Railway. The estimate is included (2 pages, handwritten), July 25, 1853.
Resumo:
Notice that the Port Dalhousie and Thorold Railway map and plans have been certified by commissioners. This is signed “secretary”, n.d.
Resumo:
Letter which S.D. Woodruff writes to William Hamilton Merritt about the length of the railway from Port Dalhousie to the Great Western Railway. He says that the distance is 6 miles. From Port Dalhousie to St. Catharines there will 4 miles of rail required for a single track, Mar. 13, 1854.
Resumo:
Letter which contains a report to George Rykert of Friends of the Port Dalhousie Thorold Railway. In this unsigned letter regarding contracts for the railway, it is suggested that the quantity of the excavation could have been done at 25 cents less per yard, July 23, 1855.
Resumo:
Letter to Mr. Ingersoll, secretary of the Port Dalhousie and Thorold Railway from S.D. Woodruff regarding a letter from F. Lalor on the 25th of October which is about claims of expenses, Dec. 4, 1856.
Resumo:
Original estimate of Mr. Danforth on the Port Dalhousie and Thorold Railway (1 page, handwritten), Nov. 3, 1853.
Resumo:
Specifications and form of tender for grading for the Port Dalhousie and Thorold Railway, March (5 pages, handwritten), 1854.
Resumo:
Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.
Resumo:
Estimated cost of the Port Dalhousie and Thorold Railway sent to George Rykert by S.D. Woodruff, Aug. 5, 1854.
Resumo:
Letter sent from the Port Dalhousie and Thorold Railway to the Town Council of St. Catharines which states that the estimate that was submitted does not embrace the damages done to the buildings along Line no. 1 from Port Dalhousie to Chisholm Corner. The estimates are included in the document, Aug. 17, 1854.
Resumo:
Port Dalhousie and Thorold Railway estimate of work done to date with an approximation of probable damage sustained by suspending the track, Aug. 22, 1854.
Resumo:
Clipping from a Town Council meeting at which estimates of the costs of Railway Line no. 1 and Line no. 2 were submitted by the office of Port Dalhousie and Thorold Railway. The estimate was submitted by S.D. Woodruff and George Rykert, president. There is also a disclaimer in which Calvin Phelps claims to have resigned as director of the Port Dalhousie and Thorold Railway when he discovered that the company had no intention to adhere to the original plan for building and running the road, Aug. 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month of August, 1854, signed by S.D. Woodruff, Sept. 1854.