63 resultados para stopping power


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Analysis of power in natural resources management is important as multiple stakeholders interact within complex, social-ecological systems. As a sub-set of these interactions, community climate change adaptation is increasingly using participatory processes to address issues of local concern. While some attention has been paid to power relations in this respect, e.g. evaluating international climate regimes or assessing vulnerability as part of integrated impact assessments, little attention has been paid to how a structured assessment of power could facilitate real adaptation and increase the potential for successful participatory processes. This paper surveys how the concept of power is currently being applied in natural resources management and links these ideas to agency and leadership for climate change adaptation. By exploring behavioural research on destructive leadership, a model is developed for informing participatory climate change adaptation. The working paper then concludes with a discussion of developing research questions in two specific areas - examining barriers to adaptation and mapping the evolution of specific participatory processes for climate change adaptation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Drawing by consulting engineer dated October 19, 1901. Scale is noted as 1/4 inch = 1 foot.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Drawing of "Section thru Wheelpit" dated September 1925. Shows unit no.1 through unit no.11, power house floor and water surface.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineer drawing (untitled), some of the labels read "exciter chamber", "fore bay", "power house floor".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four men (unknown) standing in the tunnel wearing hard hats.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A large group of men in hard hats in the tunnel. The names of the men are unknown.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four men standing in hydro tunnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Photograph of water rushing through hydro tunnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Another photograph of several men walking through the tunnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large group of men standing in the tunnel wearing boots and hard hats.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Group of men in the hydro tunnel with a loaded dolly and large lamp for light.