179 resultados para Canadian Pacific Railway Company


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Buffalo and Brantford Railway Company was formed in 1850. The railway was renamed the Buffalo, Brantford & Goderich Railway in 1852 to reflect the plans to extend the line to Goderich. Financial problems led to a British group taking over the railway a few years later and the name was changed to the Buffalo & Lake Huron Railway. It was June 1858 before the line to Goderich was completed. Source: (http://brantford.library.on.ca/genealogy/railways.php#buffalo) March 8, 2010

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Electrical Development Company of Ontario was created in 1903. It was one of three private power companies that had water power leases with the Niagara Parks Commission, but was the only one that was financed with Canadian capital. The company built the Toronto Power Generating Station at Niagara Falls beginning in 1906, and the power house was completed in 1913. During the construction, there was much debate about whether the utility should remain privately operated or become a public utility. In 1920, the company became part of the public utility.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from 2nd Vice President and General Manager of Canadian General Electric Company, Frederic Nicholls to W. B. Rankine regarding a bid for contract. The letter mentions that the bid for two alternating generators for the Canadian side of Niagara Falls was won by Westinghouse Eletric and Manufacturing Co. Nicholls also mentions that there will be other opportunites to win contracts as more machines are required. Nicholls also implies that Westinghouse may have bid under cost in an effort to secure the first of many contracts with the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Remarks of Mr. William B. Rankine, secretary of the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Drawing by consulting engineer dated October 19, 1901. Scale is noted as 1/4 inch = 1 foot.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Drawing of "Section thru Wheelpit" dated September 1925. Shows unit no.1 through unit no.11, power house floor and water surface.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Engineer drawing (untitled), some of the labels read "exciter chamber", "fore bay", "power house floor".

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men (unknown) standing in the tunnel wearing hard hats.