45 resultados para Young’s construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Framework for the addition is completed and further work begins.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Exterior construction nears completion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction of the addition nears completion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Completion of the addition and surrounding lanscaping.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction of the Physical Education Building progresses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pouring the concrete in the construction of the Eleanor Misener Aquatic Centre.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pouring the concrete during the construction of the walls for the Aquatic Centre.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction of the concrete walls and pillars for the Aquatic Centre.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Decew Residence was the first on-campus residence constructed and replaced the temporary student residences on Glenridge Avenue at the base of the escarpment. The Decew residence accommodated 400 students, and included a 300 seat dining hall, 10 activity rooms and 5 student lounges. Construction completed in 1970.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction work continuing on the Decew Residence.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Schmon Tower around 1968 when the ramp was being constructed. The Thistle ramp was torn down around two decades later to make room for Taro Hall and the Alumni Building.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Distant view of the tower and construction of the Thistle Complex.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This picture shows construction work underway on the Thistle Complex. The groundwork, supporting pillars, and preliminary work on the concrete walls can be seen. The most notable feature is the exposed foundation of the Thistle Theatre to the left. The adjacent lecture halls are also taking form to the right.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This picture shows construction work underway on the Thistle Complex. The groundwork, supporting pillars, and concrete walls can be seen. The most notable feature is the exposed foundation of the Thistle Theatre to the left. The adjacent lecture halls are also taking form to the right.