34 resultados para Tunnel junctions


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Group of men in the hydro tunnel with a loaded dolly and large lamp for light.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One male looking down tunnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three men looking down tunnel as water is pouring in.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four men, same men from a previous photograph, standing in the water of the tunnel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of man working high in rafter of the tunnel with ropes securing him.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of the hydro tunnel wall.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction on the Thorold tunnel began in 1965 and was completed in 1967. It was designed by H. G. Acres & Company Ltd. and built by Pitts-Atlas, a joint venture of C.A. Pitts, General Contractor Ltd., and Atlas Construction Company Ltd. The tunnel replaced two lift bridges (Bridge 9 at Ontario Paper Co. and Bridge 7) that carried traffic over the Welland Canal. The majority of the construction occurred during the winter months, when the canal was closed to shipping. The water was drained and concrete sections shaped liked tubes were poured, creating the tunnel. During the summer months, the end sections of the tunnel were constructed so that shipping could continue uninterrupted. The 24 million dollar project was financed jointly by the Department of Highways and the St. Lawrence Seaway Authority. The tunnel was officially opened on September 18, 1968.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Air duct running along the utilities tunnel.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

View of the service tunnel and foundation construction in October 1971.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The frequency dependence of the electron-spin fluctuation spectrum, P(Q), is calculated in the finite bandwidth model. We find that for Pd, which has a nearly full d-band, the magnitude, the range, and the peak frequency of P(Q) are greatly reduced from those in the standard spin fluctuation theory. The electron self-energy due to spin fluctuations is calculated within the finite bandwidth model. Vertex corrections are examined, and we find that Migdal's theorem is valid for spin fluctuations in the nearly full band. The conductance of a normal metal-insulator-normal metal tunnel junction is examined when spin fluctuations are present in one electrode. We find that for the nearly full band, the momentum independent self-energy due to spin fluctuations enters the expression for the tunneling conductance with approximately the same weight as the self-energy due to phonons. The effect of spin fluctuations on the tunneling conductance is slight within the finite bandwidth model for Pd. The effect of spin fluctuations on the tunneling conductance of a metal with a less full d-band than Pd may be more pronounced. However, in this case the tunneling conductance is not simply proportional to the self-energy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The lithograph, "General view of lands, tunnel and docks of Niagara River Hydraulic Tunnel, Power and Sewer Company," called for p. [4] in the Index, has been removed and encapsulated, and is shelved separately.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The NDP was founded out of the ashes of the Co-Operative Commonwealth Federation to cooperate with the Canadian Labour Congress to become the 'political arm of organized labour' in Canada. The NDP has long claimed they are the party which represents the policy goals of organized labour in Canada: that the NDP alone will fight for trade union rights, and will fight for Canadian workers. Divergent Paths is an examination of the links between the labour movement and the ND P in an era ofneo-liberalism. Provincial NDP governments have become increasingly neoliberal in their ideological orientation, and have often proved to be no friend to the labour movement when they hold office. The Federal party has never held power, nor have they ever formed the Official Opposition. This thesis charts the progress of the federal NDP as they become more neoliberal from 1988 to 2006, and shows how this trend effects the links between the NDP and labour. Divergent Paths studies each federal election from 1988 to 2006, looking at the interactions between Labour and the NDP during these elections. Elections provide critical junctions to study discourse - party platforms, speeches, and other official documents can be used to examine discourse. Extensive newspaper searches were used to follow campaign events and policy speeches. Studying the party's discourse can be used to determine the ideological orientation of the party itself: the fact that the party's discourse has become neoliberal is a sure sign that the party itself is neoliberal. The NDP continues to drive towards the centre of the political spectrum in an attempt to gain multi-class support. The NDP seems more interested in gaining seats at any cost, rather then promoting the agenda of Labour. As the party attempts to open up to more multi-class support, Labour becomes increasingly marginalised in the party. A rift which arguably started well before the 1988 election was exacerbated during that election; labour encouraged the NDP to campaign solely on the issue of Free Trade, and the NDP did not. The 1993 election saw the rift between the two grow even further as the Federal NDP suffered major blowbacks from the actions of the Ontario NDP. The 1997 and 2000 elections saw the NDP make a deliberate move to the centre of the political spectrum which increasingly marginalised labour. In the 2004 election, Jack Layton made no attempt to move the party back to the left; and in 2006 the link between labour and the NDP was perhaps irreparably damaged when the CAW endorsed the Liberal party in a strategic voting strategy, and the CLC did not endorse the NDP. The NDP is no longer a reliable ally of organized labour. The Canadian labour movement must decide wether the NDP can be 'salvaged' or if the labour movement should end their alliance with the NDP and engage in a new political project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A FMRFamide-like neuropeptide with the sequence "DRNFLRF-NH2" was recently isolated from pericardial organs of crayfish (Mercier et aI., Peptides, 14, 137-143, 1993). This neuropeptide, referred to as "DF2'" has already been shown to elicit cardioexcitation and to enhance synaptic transmission at neuromuscular junctions. Possible effects ofDF2 on muscle were investigated using superficial extensor muscles of the abdomen of the crayfish, Procambarus clar/ai. These muscles are of the tonic type and generate slow contractions that affect posture. DF2, at concentrations of 10-8 M or higher, increased muscle tonus and induced spontaneous, rhythmic contractions. These effects were antagonized by 5 rnM Mn2+ but not by lO-7M tetrodotoxin (TTX). Thus, they represent direct actions on muscle cells (rather than effects on motor neurons) and are likely to involve calcium influx. In contrast, deep abdominal extensor muscles, responsible for rapid swimming movements, and superficial flexor muscles do not generate contractions in response to the peptide. 2 Spontaneous contractions were also induced in the superficial extensor muscles by decreasing the temperature to II-13°C. Such contractions were also TTX-insensitive and they were antagonized by adding calcium channel blockers (Mn2+, Cd2+ or Ni2+) or by removing calcium from the bathing solution. This suggests that the spontaneous contractions depend on an influx of calcium from the extracellular solution. N-type and L-type voltage dependent calcium channel blockers did not reduce the effect of the peptide or the spontaneous contractions suggesting that calcium influx is not through N- or L-type calcium channels.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Bruce trail is Canada’s longest and oldest continuous footpath. The trail runs along the Niagara Escarpment from Niagara to Tobermory through private and public land. The main trail is 890 km long and the side trails measure 400 km. In 1961, a “Save the Escarpment” conference was held in Hamilton. Gerry Wolfram, a writer for the St. Catharines Standard proposed that a committee be formed to develop a hiking trail. The Peninsula Field Naturalists Club formed a committee and President Bert Lowe contacted landowners along the proposed route to gain permission to cross their properties. Through Bert Lowe’s effort and dedication, the trail was completed in October 1963. The trail was officially opened on May 24th, 1964 in a ceremony at Queenston. The Niagara group joined the Bruce Trail Association in 1968 at which time the Niagara Bruce Trail Club was formed. The Bruce Trail Association is a charitable, membership-based volunteer organization. Their goal is to preserve public access to the Niagara Escarpment while restoring its natural habitat. The head office of the Bruce Trail Association is located in Hamilton, Ontario. The Niagara Bruce Trail Club’s goal is to secure and preserve a natural corridor along the Niagara Escarpment while providing education, awareness, and access for the public and the future. The club has organized many hikes including special hikes such as the one to commemorate the St. Catharines Centennial. The club has also hosted children’s hikes, cross country skiing hikes, wildflower hikes, jogging hikes, snowshoe hikes and bike outings. They hold annual events such as the End to End hike which is a 3 day walk from Grimsby to Queenston and the 30 km Laura Secord hike to commemorate Laura Secord’s famous walk. Charity hikes have also been held for the Heart and Stroke Foundation and the Lung Association as well as other causes. Major changes have taken place along the trail throughout the years, some of these include: a reroute which eliminated the tunnel passage (1976) and a bridge which eliminated the need to walk to Mountain Road to cross the Queen Elizabeth Way (2008). Other major changes and clean-up projects have been undertaken by the club. The Bruce Trail Conservancy (formerly Association) is made up of 9 clubs including: Niagara Bruce Trail Club (Queenston to Grimsby), Iroquia Bruce Trail Club (Grimsby to Kelso), Toronto Bruce Trail Club (Kelso to Cheltenham), Caledon Hills Bruce Trail Club (Cheltenham to Mono Centre), Dufferin Hi-Land Bruce Trail Club (Mono Centre to Lavender), Blue Mountains Bruce Trail Club (Lavender to Craigleath), Beaver Valley Bruce Trail Club (Craigleath to Blantyre), Sydenham Bruce Trail Club (Blantyre to Wiarton) and Peninsula Bruce Trail Club (Wiarton to Tobermory). Sources: http://www.niagarabrucetrail.org/index.html and http://brucetrail.org/

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx