21 resultados para Railroad track settlement
Resumo:
The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.
Resumo:
The new California Line via Atchison, Topeka and Santa Fe Railroad and Southern Pacific Railroad. This schedule is torn. This does not affect text, n.d.
Resumo:
Printed blank from the New York Central and Hudson River Railroad Express Freight Line, New York for shipping packages of brackets and racks to S.D. Woodruff of St. Catharines. This document is signed by R.L. Crawford, agent, Aug.11, 1876.
Resumo:
Flyer (2 double sided pages, printed) about railroad bonds from E.D. Shepard and Co. Bankers, New York, n.d.
Resumo:
Letter to Henry Nelles from Michael Harris of the Perth Military Settlement (3 pages, handwritten). He is married to Mary Fanning, sister of Henry Nelles but is having marital troubles as he says he “may have to be on the lookout for another wife”. He thinks that his wife Mary may have departed for the United States, Apr. 6, 1821.
Resumo:
Broadside, 90 cm. x 55 cm. made from canvas. This broadside is for a centennial celebration of the settlement of Ontario by the United Empire Loyalists. The first line reads “1774 -1884” [it should be 1784-1884]. The celebration was to be held on the historic plains of Niagara. The names of the general committee of the celebration are listed as well as the names of Major Hiscott, warden; F.A.B. Clench, chairman and Dan Servos. It is written in pencil that “this was given by J.B. Secord”. There are some small holes in the broadside and a small bit of canvas has lost some of its texture. This affects the text very slightly. 1884