61 resultados para Partnership urban operation of the Port
Resumo:
The water quality and fish populations of the Welland River were observed to decline with distance downstream. This coincided with increased agricultural , domestic and industrial waste loadings. The river upstream of the City of Welland received considerable loadings from agricultural sources. Centrarchids, sciaenids, ictalurids, cyprinids and esocids characterized this upper section of the river. Most of these species were tolerant of low dissolved oxygen concentrations and the high turbidity which prevailed there . The river near Port Robinson receives many industrial and domestic wastes as evidenced by the water quality data. The fish in this section were less abundant and the observed population was comprised almost solely of cyprinids. Further downstream, near Montrose, the Welland River received shock loads of chemical wastes that exceeded a specific conductance of ISiOOO ;umhos/cm. Few fish were captured at this site and those that were captured were considered to be transients. A review of the literature revealed that none of the common indices of water quality in use today could adequately predict the observed distributions. In addition to the above, the long-term trend (l3 yrs) of water quality of the lower Welland River revealed a gradual improvement. The major factor thought to be responsible for this improvement was the operation of the Welland Sewage Treatment Plant. The construction of the New Welland Ship Canal coincided with large fluctuations of the total solids and other parameters downstream. These conditions prevailed for a maximum of three years (1972- 1975)' Furthermore, spawning times and temperatures, geographic distributions, length-weight regressions and many other descriptive aspects of the ecology of some 26 species/ taxa of fish were obtained. Several of these species are rare or new to southern Ontario.
Resumo:
Clipping from a Town Council meeting at which estimates of the costs of Railway Line no. 1 and Line no. 2 were submitted by the office of Port Dalhousie and Thorold Railway. The estimate was submitted by S.D. Woodruff and George Rykert, president. There is also a disclaimer in which Calvin Phelps claims to have resigned as director of the Port Dalhousie and Thorold Railway when he discovered that the company had no intention to adhere to the original plan for building and running the road, Aug. 1854.
Resumo:
The Beckman Helium Discharge Detector has been found to be sensitive to the fixed gases oxygen, nitrogen, and hydrogen at detection levels 10-100 times more sensitive than possible with a Bow-Mac Thermal Conductivity Detector. Detection levels o~ approximately 1.9 E-4 ~ v/v oxygen, 3.1 E-4 ~ v/v nitrogen, and 3.0 E-3 ~ v/v hydrogen are estimated. Response of the Helium Discharge Detector was not linear, but is useable for quantitation over limited ranges of concentration using suitably prepared working standards. Cleanliness of the detector discharge electrodes and purity of the helium carrier and discharge gas were found to be critical to the operation of the detector. Higher sensitivities of the Helium Discharge Detector may be possible by the design and installation of a sensitive, solid-state electrometer.
Resumo:
The site of present-day St. Catharines was settled by 3000 United Empire Loyalists at the end of the 18th century. From 1790, the settlement (then known as "The Twelve") grew as an agricultural community. St. Catharines was once referred to Shipman's Corners after Paul Shipman, owner of a tavern that was an important stagecoach transfer point. In 1815, leading businessman William Hamilton Merritt abandoned his wharf at Queenston and set up another at Shipman's Corners. He became involved in the construction and operation of several lumber and gristmills along Twelve Mile Creek. Shipman's Corners soon became the principal milling site of the eastern Niagara Peninsula. At about the same time, Merritt began to develop the salt springs that were discovered along the river which subsequently gave the village a reputation as a health resort. By this time St. Catharines was the official name of the village; the origin of the name remains obscure, but is thought to be named after Catharine Askin Robertson Hamilton, wife of the Hon. Robert Hamilton, a prominent businessman. Merritt devised a canal scheme from Lake Erie to Lake Ontario that would provide a more reliable water supply for the mills while at the same time function as a canal. He formed the Welland Canal Company, and construction took place from 1824 to 1829. The canal and the mills made St. Catharines the most important industrial centre in Niagara. By 1845, St. Catharines was incorporated as a town, with the town limits extending in 1854. Administrative and political functions were added to St. Catharines in 1862 when it became the county seat of Lincoln. In 1871, construction began on the third Welland Canal, which attracted additional population to the town. As a consequence of continual growth, the town limits were again extended. St. Catharines attained city status in 1876 with its larger population and area. Manufacturing became increasingly important in St. Catharines in the early 1900s with the abundance of hydro-electric power, and its location on important land and water routes. The large increase in population after the 1900s was mainly due to the continued industrialization and urbanization of the northern part of the city and the related expansion of business activity. The fourth Welland Canal was opened in 1932 as the third canal could no longer accommodate the larger ships. The post war years and the automobile brought great change to the urban form of St. Catharines. St. Catharines began to spread its boundaries in all directions with land being added five times during the 1950s. The Town of Merritton, Village of Port Dalhousie and Grantham Township were all incorporated as part of St. Catharines in 1961. In 1970 the Province of Ontario implemented a regional approach to deal with such issues as planning, pollution, transportation and services. As a result, Louth Township on the west side of the city was amalgamated, extending the city's boundary to Fifteen Mile Creek. With its current population of 131,989, St. Catharines has become the dominant centre of the Niagara region. Source: City of St. Catharines website http://www.stcatharines.ca/en/governin/HistoryOfTheCity.asp (January 27, 2011)
Resumo:
Efforts to reform the public sector reflect the social, political and economic environment within which government must function. The recent demands by the public for more consensual decision-making, as well as more efficient, effective and responsive public service, have resulted in a number of reform initiatives, including an emphasis on partnership development. The purpose of this thesis is to examine partnership arrangements within the public sector. Specifically, the thesis will assess the value of partnerships and their impact on government by examining six partnership arrangements involving the Ontario Ministry of Natural Resources (OMNR). The OMNR, having recently been awarded the 1992 Institute of Public Administration of Canada Award for Innovative Management, on the theme of partnership development, is being lauded as an example for other government agencies considering similar alliances. The thesis begins by introducing the concept and practice of partnership within the public sector in general and the OMNR specifically. Descriptive analysis of six OMNR partnerships is provided and a number of criteria are used to determine the success of each of these arrangements. Special attention is paid to the political implications of partnerships and to those attributes which appear to contribute to the successful establishment and iii maintenance of partnership arrangements. The conclusion is drawn that partnerships provide the government with an opportunity to address public demands for greater involvement in decision-making while accommodating government's limited financial resources. However, few truly collaborative partnerships exist within the public sector. There are also significant political implications associated with partnerships which must be dealt with both at the political and bureaucratic levels of government. Lastly, it is argued that while partnerships within the OMNR are experiencing some difficulties, they constitute a genuine attempt to broaden the base of decision-making and to incorporate the concerns of stakeholders into resource management.
Resumo:
First edition printed by Nathaniel Hickman.
Resumo:
Several study areas were investigated at two Port Colborne terneries during the summers of 1973 and 1974 in an attempt to determine the influence of clutch size, time of clutch initiation, position in the colony, proximity to Ring-billed Gulls, vegetation and nesting substrate on the reproductive performance of the Common Tern. Hatching success and reproductive success (the number of chicks fledged per egg laid) were generally higher for 3-egg than 2-egg clutches but fledging (the number of chicks fledged per egg hatched) success was usually independant of clutch size. Hatching, fledging and reproductive success declined as a function of time of clutch initiation. Mean clutch sizes also generally declined as a function of time. Nests located in the center of the colony exhibited higher fledging success than those on the periphery. Rock-based clutches had a lower hatching success than clutches initiated on sand or dried vegetation. Reproductive performance did not appear to be related to proximity to Ring-billed Gulls or vegetation within the study area.
Resumo:
Rural communities are currently undergoing rapid restructuring as globalization impacts the future viability of many small towns. Agricultural regions throughout Canada, in particular, Niagara-on-the-Lake, are forced to adapt to changes within the industry. In addition to these challenges, sprawling residential developments from nearby urban centres are changing the dynamic of this town, resulting in conflicts between the residential and agricultural land uses. This thesis explores these conflicts from the perspective of the residents and the farmers. It was found that the initial sources of conflict related to noise-generating farm activities are no longer a concern, while the use of pesticide have become a source of contention among the residents. The farmers, alternately, were found to be proactive and strived to limit the potential for conflict with adjacent residents. Lastly, it was determined that planning legislation aggravates land use conflicts within Niagara-on-the-Lake and need to better address these land use conflicts.
Resumo:
Original estimate of Mr. Danforth on the Port Dalhousie and Thorold Railway (1 page, handwritten), Nov. 3, 1853.
Resumo:
Specifications and form of tender for grading for the Port Dalhousie and Thorold Railway, March (5 pages, handwritten), 1854.
Resumo:
Approximate cost of completing the railway from Port Dalhousie to St. Catharines and an estimate of the cost of the piers at Port Dalhousie signed by William Hamilton Merritt (5 pages, handwritten), July 8, 1854.
Resumo:
Approximate estimate of the cost of completing the Port Dalhousie Railway to the Grand Central Railway Station at Lock 12. This document is badly torn and burned but most of the text is legible, July 14, 1854.
Resumo:
Letter sent from the Port Dalhousie and Thorold Railway to the Town Council of St. Catharines which states that the estimate that was submitted does not embrace the damages done to the buildings along Line no. 1 from Port Dalhousie to Chisholm Corner. The estimates are included in the document, Aug. 17, 1854.
Resumo:
Estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines during the month ending Aug. 31, 1854.