55 resultados para Montana Power Company
Resumo:
Remarks of Mr. William B. Rankine, secretary of the Canadian Niagara Power Company.
Resumo:
Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.
Resumo:
Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.
Resumo:
Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.
Resumo:
Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.
Resumo:
Drawing by consulting engineer dated October 19, 1901. Scale is noted as 1/4 inch = 1 foot.
Resumo:
Drawing of "Section thru Wheelpit" dated September 1925. Shows unit no.1 through unit no.11, power house floor and water surface.
Resumo:
Engineer drawing (untitled), some of the labels read "exciter chamber", "fore bay", "power house floor".
Resumo:
Four men (unknown) standing in the tunnel wearing hard hats.
Resumo:
A large group of men in hard hats in the tunnel. The names of the men are unknown.
Resumo:
Four men standing in hydro tunnel.
Resumo:
Letter to the Welland Canal Office from Welland Woodruff, Government Director of the Welland Canal Company in which he dissents from giving an extension of time to the St. Catharines Water Power Company to extend the lease of water from this time. This is a copy of the original, March 11, 1837.
Resumo:
Caption title.