22 resultados para Laurencine Fremioot, Santa, 1847-1855


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The new California Line via Atchison, Topeka and Santa Fe Railroad and Southern Pacific Railroad. This schedule is torn. This does not affect text, n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is very badly burned, it includes: a schedule of construction, May 28, 1855 and value of work used for constructing the bridge crossing at Chippawa Creek, Oct. 1857. It is signed by S.D. Woodruff (3 pages, handwritten). Almost all text is illegible, 1857

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Note showing the return of time for the preliminary survey of the Port Robinson and Thorold macadamized road for March and April, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract of estimates given to Andrew Mains for ditching on the main drain of marsh lands for 1855 and 1856. This is signed by S.D. Woodruff, May 1, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineer services in the marsh lands drainage for the months of December, 1855 and January, February and March of 1856. Signed by S.D. Woodruff, March 31, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineer services in the marsh lands drainage for the months of December, 1855 and January, February and March of 1856 to Frederick Holmes and Joseph Simpson. Signed by S.D. Woodruff, April 1, 1856.