59 resultados para Dominion Power Company


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Canadian Niagara Power Company was created in 1892, in large part due to the efforts of William Birch Rankine, a businessman who pioneered the development of hydropower on both the Canadian and American shores of the Niagara River. Numerous delays and problems postponed the construction and operation of the company's powerhouse, which was formally opened on January 2, 1905. Upon opening, the powerhouse boasted the largest generators of their kind in the world, with a capacity of 10,000 electrical horsepower each. The company was acquired by FortisOntario in 2002. In 2009, the company’s water rights expired and the Canadian Niagara Powerhouse building, also known as the Rankine Generating Station, was turned over to the Niagara Parks Commission.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to W.D. Woodruff from E.E. Black of N.W. Harris and Co. Bankers of New York (1 page, printed), which accompanied a bill showing $10,000 due on the Dominion Power Company, July 23, 1907.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to W.D. Woodruff from E.E. Black of N.W. Harris and Co. Bankers of New York (1 page, printed) regarding $41,000 in Dominion Power Company bonds that they have put in safekeeping, Oct. 30, 1907.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to W.D. Woodruff from Mr. Harris of N.W. Harris and Co. Bankers of New York (1 page, printed) which accompanied a receipt for the $41,000 Dominion Power Company bonds, Nov. 4, 1907.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Letter to W.D. Woodruff from E.C. Wheeler Jr. of N.W. Harris and Co. Bankers of New York (1 page, printed) saying that he is pleased that Mr. Woodruff has decided to take the $10,000 Dominion Powers at 90 and interest. They will expect Mr. Woodruff in a few days, Dec. 10, 1907.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Remarks of Mr. William B. Rankine, secretary of the Canadian Niagara Power Company.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Drawing by consulting engineer dated October 19, 1901. Scale is noted as 1/4 inch = 1 foot.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Drawing of "Section thru Wheelpit" dated September 1925. Shows unit no.1 through unit no.11, power house floor and water surface.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Engineer drawing (untitled), some of the labels read "exciter chamber", "fore bay", "power house floor".