264 resultados para Motley, John Lothrop, 1814-1877.
Resumo:
Letter to S.D. Woodruff from John F. Day stating that it is impossible for him to go into the woods regarding the pine in dispute. He says that Mr. Woodruff appears to ignore (or forget) that the inspection could be made by Mr. Day’s son and that proposition was agreeable to Mr. Woodruff. He says that he will (with Burton and Bro.’s consent) appoint someone who is unknown to both Mr. Woodruff and Burton and Bro. This is a 1 page handwritten letter written on a letter which was previously sent by S.D. Woodruff on May 8. This is accompanied by an envelope, July 26, 1880.
Resumo:
Letter to John F. Day from S.D. Woodruff in which he states that he would not think of having Burton perform a service for him again, Aug. 23, 1880.
Resumo:
License no. 7 of season 1877/78 made out to S.D. Woodruff for 35 ¾ square miles in berth no. 198, May 31, 1877.
Resumo:
License no. 6 of season 1877/78 made out to S.D. Woodruff for 36 square miles in berth no.192, May 31, 1877.
Resumo:
Note that John Brown has done grading in the section between Geneva Street and Slabtown [known as Merritton prior to amalgamation with St. Catharines in 1961]. This document is badly stained and faded. It is signed by S.D. Woodruff, 1855.
Resumo:
Note that John Brown has graveled in the section between Geneva Street and Slabtown. This is signed by S.D. Woodruff, Oct. 18, 1855.
Resumo:
Note stating that John Brown has done grading in the section of railway between Geneva Street and Slabtown. This document is signed by S.D. Woodruff, Dec. 12, 1855.
Resumo:
Chart of estimate for work done on the Port Dalhousie and Thorold Railway by John Brown, contractor regarding the section between Geneva Street and the Thorold Station up to the 30th of June 1856. This document is burned on the edges. This does not affect the text, 1856
Resumo:
Port Dalhousie and Thorold Railway wages paid to John Brown (2 pages, handwritten) from Aug. 1855 – May 1856.
Resumo:
Prices of John Brown’s contracts for Port Dalhousie and Thorold Railway from Geneva Street to Thorold Station (1 page, handwritten), n.d.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension to John Gilleland for supplies. This is accompanied by a note about pine lumber and fencing, Apr. and May, 1857.
Resumo:
Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension for W.G. Thompson for the Northern Division. There are attached notes from the Welland Railway Company to John Mitchell for putting up shelves; to William Waud, staff; and to William Martin to repair the office (copy), June 10, 1857.
Resumo:
Unsigned letter to John Williams stating that before the return of the final estimate, the arch of the bridge must be completed, Sept. 19, 1857
Resumo:
Chart of estimate #7 of work done by John Williams during the month of May. This is signed by Fred Holmes, May 29, 1856.
Resumo:
Chart of estimate #8 of work done by John Williams during the month of June. This is signed by Fred Holmes, June 1856