202 resultados para Tehuantepec, Canal de
Resumo:
William Hamilton Merritt (1793-1862) was a soldier, merchant, and politician who was instrumental in the promotion and development of the Welland Canal. After serving with the Lincoln militia during the War of 1812, Merritt became a merchant in St. Catharines, and purchased some land on Twelve Mile Creek on which he ran a sawmill and constructed a grist mill. He initially envisioned a canal between the Welland River and Twelve Mile Creek, which evolved into a plan to link Lake Ontario and Lake Erie. This would enable goods from western Canada to be conveniently shipped to Montreal and Great Britain through the St. Lawrence, while bypassing the Niagara portage. His plan met with opposition for financial and political reasons, as well as from those along the Niagara portage whose businesses would suffer if the canal were built. Despite this opposition, the Welland Canal Company was chartered by the Upper Canadian assembly in January, 1824. Construction on the canal began later that year, and was completed in 1829.
Resumo:
William Hamilton Merritt (1793-1862) was a soldier, merchant, and politician who was instrumental in the promotion and development of the Welland Canal. After serving with the Lincoln militia during the War of 1812, Merritt became a merchant in St. Catharines, and purchased some land on Twelve Mile Creek on which he ran a sawmill and constructed a grist mill. He initially envisioned a canal between the Welland River and Twelve Mile Creek, which evolved into a plan to link Lake Ontario and Lake Erie. This would enable goods from western Canada to be conveniently shipped to Montreal and Great Britain through the St. Lawrence, while bypassing the Niagara portage. His plan met with opposition for financial and political reasons, as well as from those along the Niagara portage whose businesses would suffer if the canal were built. Despite this opposition, the Welland Canal Company was chartered by the Upper Canadian assembly in January, 1824. Construction on the canal began later that year, and was completed in 1829
Resumo:
Sketch of canal lock 2 by S.D. Woodruff. This is a hand drawn sketch, n.d.
Resumo:
Envelope addressed to S.D. Woodruff at the Welland Canal Office regarding pay roll vouchers for – the envelope was empty, July, 1857.
Resumo:
Letter to Dexter Deverardo, clerk of Fonthill from the Welland Canal Office of St. Catharines in order to see that the work is done in a satisfactory manner. This letter is signed in pencil by S.D. Woodruff (4 pages, handwritten), Jan. 8, 1855.
Resumo:
Letter (unsigned) from the Welland Canal Office regarding a quantity of wood felled upon the bank of the feeder. It is laid too near the back ditch. The recipient of the letter is instructed to proceed with the removal of the wood so that the excavation of the ditch might proceed, Aug. 7, 1858.
Resumo:
Plan of levels of marsh land on the line of the proposed ditch from Lyons Creek Culvert on the Welland Canal to lot no. 32 in the 2nd concession of Wainfleet (1 page, hand drawn), n.d.
Resumo:
Letter to the Welland Canal Office from Welland Woodruff, Government Director of the Welland Canal Company in which he dissents from giving an extension of time to the St. Catharines Water Power Company to extend the lease of water from this time. This is a copy of the original, March 11, 1837.
Resumo:
Letter to Samuel Keefer, engineer on the Welland Canal from Charles H. French. He says that he has no extra bills for work on his contract, Sept. 12, 1848.
Resumo:
Letter to S.D. Woodruff enclosing the statement of different classes passing down the Welland Canal. This is signed by William Pring of Port Colborne, collector, Jan.27, 1862.
Resumo:
Abstract of tenders received for the Welland Canal, Sept. 23, 1847.
Resumo:
Chart of land drainage for the Welland Canal final estimate of work done on sections no.1, 2 and 3 on the road below lock no. 2 leading to Port Dalhousie. Work commenced Nov. 1846 and finished July 1847. Road work and the waste weir no.1 to Port Dalhousie work commenced Aug. 1847 and finished Sept. 1847, Nov.1, 1847.
Resumo:
Chart containing the statement of amount required to complete the canal, March 15, 1848.
Resumo:
Map of the Welland Canal including the store house and waste weir no.1, n.d.
Resumo:
Map of the Welland Canal including the store house and waste weir no.1 drawn by Shamus A. Begly of Public Works, n.d.