75 resultados para materials for electric energy distribution networks
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
The Thesis is dedicated to development of an operative tool to support decision making of battery energy storages implementation in distribution networks. The basics of various battery technologies, their perspectives and challenges are represented in the Thesis. Mathematical equations that describe economic effect from battery energy storage installation are offered. The main factors that influence profitability of battery settings have been explored and mathematically defined. Mathematical model and principal trends of battery storage profitability under an impact of the major factors are determined. The meaning of annual net value was introduced to show the difference between savings and required costs. The model gives a clear vision for dependencies between annual net value and main factors. Proposals for optimal network and battery characteristics are suggested.
Resumo:
Increasingly growing share of distributed generation in the whole electrical power system’s generating system is currently a worldwide tendency, driven by several factors, encircling mainly difficulties in refinement of megalopolises’ distribution networks and its maintenance; widening environmental concerns adding to both energy efficiency approaches and installation of renewable sources based generation, inherently distributed; increased power quality and reliability needs; progress in IT field, making implementable harmonization of needs and interests of different-energy-type generators and consumers. At this stage, the volume, formed by system-interconnected distributed generation facilities, have reached the level of causing broad impact toward system operation under emergency and post-emergency conditions in several EU countries, thus previously implementable approach of their preliminary tripping in case of a fault, preventing generating equipment damage and disoperation of relay protection and automation, is not applicable any more. Adding to the preceding, withstand capability and transient electromechanical stability of generating technologies, interconnecting in proximity of load nodes, enhanced significantly since the moment Low Voltage Ride-Through regulations, followed by techniques, were introduced in Grid Codes. Both aspects leads to relay protection and auto-reclosing operation in presence of distributed generation generally connected after grid planning and construction phases. This paper proposes solutions to the emerging need to ensure correct operation of the equipment in question with least possible grid refinements, distinctively for every type of distributed generation technology achieved its technical maturity to date and network’s protection. New generating technologies are equivalented from the perspective of representation in calculation of initial steady-state short-circuit current used to dimension current-sensing relay protection, and widely adopted short-circuit calculation practices, as IEC 60909 and VDE 0102. The phenomenon of unintentional islanding, influencing auto-reclosing, is addressed, and protection schemes used to eliminate an sustained island are listed and characterized by reliability and implementation related factors, whereas also forming a crucial aspect of realization of the proposed protection operation relieving measures.
Resumo:
This thesis studies the possibilities to recover energy in a hydraulic forklift system. Controlling of the system is done directly with an electric servo motor drive and a hydraulic pump. A real system was built and tested and simulations of the system were made with Matlab. Results of the system and simulations were analysed and compared and according to them, energy can be recovered efficiently from the hydraulic forklift system. Also new ideas and directions of further research were obtained with the help of this research.
Resumo:
This Master’s Thesis work reports about electric field distribution in recently developed silicon edgeless detector with a new current terminating structure. This structure enables the essential reduction of insensitive detector area as well as allows separation of the current flowing through the active area from the current flowing at the cut edge. The reliable operation of this detector is strongly needed due to the installation inside LHC. In accordance with formulated problems SEM was used as an investigation tool for collecting the data about electric field distribution.
Resumo:
Since it is virtually impossible to balance loads in three-phase system, unbalance in a varying degree exists almost in all distribution networks. The aim of the thesis is to analyze the impact of this unbalance subject to different configurations of distribution system and winding connection of the supplying transformer. Also impact of the voltage unbalance on the equipment is investigated. In order to make the investigation more visual, the following calculations have been conducted: - Unsymmetrical load in four-wire star connected network - Unsymmetrical load in four-wire star connected network with broken zero conductor (or three-wire network). - Unsymmetrical load when the supplying transformer is so-called zigzag transformer. PDF created
Resumo:
Strategic development of distribution networks plays a key role in the asset management in electricity distribution companies. Owing to the capital-intensive nature of the field and longspan operations of companies, the significance of a strategy is emphasised. A well-devised strategy combines awareness of challenges posed by the operating environment and the future targets of the distribution company. Economic regulation, ageing infrastructure, scarcity of resources and tightening supply requirements with challenges created by the climate change put a pressure on the strategy work. On the other hand, technology development related to network automation and underground cabling assists in answering these challenges. This dissertation aims at developing process knowledge and establishing a methodological framework by which key issues related to network development can be addressed. Moreover, the work develops tools by which the effects of changes in the operating environment on the distribution business can be analysed in the strategy work. To this end, the work discusses certain characteristics of the distribution business and describes the strategy process at a principle level. Further, the work defines the subtasks in the strategy process and presents the key elements in the strategy work and long-term network planning. The work delineates the factors having either a direct or indirect effect on strategic planning and development needs in the networks; in particular, outage costs constitute an important part of the economic regulation of the distribution business, reliability being thus a key driver in network planning. The dissertation describes the methodology and tools applied to cost and reliability analyses in the strategy work. The work focuses on determination of the techno-economic feasibility of different network development technologies; these feasibility surveys are linked to the economic regulation model of the distribution business, in particular from the viewpoint of reliability of electricity supply and allowed return. The work introduces the asset management system developed for research purposes and to support the strategy work, the calculation elements of the system and initial data used in the network analysis. The key elements of this asset management system are utilised in the dissertation. Finally, the study addresses the stages of strategic decision-making and compilation of investment strategies. Further, the work illustrates implementation of strategic planning in an actual distribution company environment.
Resumo:
Over the recent years, development in mobile working machines has concentrated on reducing emissions owing to the tightening rules and needs to improve energy utilization and reduce power losses. This study focuses on energy utilization and regeneration in an electro-hydraulic forklift, which is a lifting equipment application. The study starts from the modelling and simulation of a hydraulic forklift. The energy regeneration from the potential energy of the load was studied. Also a flow-based electric motor speed control was suggested in this thesis instead of the throttle control method or the variable displacement pump control. Topics related to further development in the future are discussed. Finally, a summary and conclusions are presented.
Resumo:
Existing electricity distribution system is under pressure because implementation of distributed generation changes the grid configuration and also because some customers demand for better distribution reliability. In a short term, traditional network planning does not offer techno-economical solutions for the challenges and therefore the idea of microgrids is introduced. Islanding capability of microgrids is expected to enable better reliability by reducing effects of faults. The aim of the thesis is to discuss challenges in integration of microgrids into distribution networks. Study discusses development of microgrid related smart grid features and gives estimation of the guideline of microgrid implementation. Thesis also scans microgrid pilots around the world and introduces the most relevant projects. Analysis reveals that the main focus of researched studies is on low voltage microgrids. This thesis extends the idea to medium voltage distribution system and introduces challenges related to medium voltage microgrid implementation. Differences of centralized and distributed microgrid models are analyzed and the centralized model is discovered to be easiest to implement into existing distribution system. Preplan of medium voltage microgrid pilot is also carried out in this thesis.
Resumo:
The focus in this thesis is to study both technical and economical possibilities of novel on-line condition monitoring techniques in underground low voltage distribution cable networks. This thesis consists of literature study about fault progression mechanisms in modern low voltage cables, laboratory measurements to determine the base and restrictions of novel on-line condition monitoring methods, and economic evaluation, based on fault statistics and information gathered from Finnish distribution system operators. This thesis is closely related to master’s thesis “Channel Estimation and On-line Diagnosis of LV Distribution Cabling”, which focuses more on the actual condition monitoring methods and signal theory behind them.
Resumo:
The Finnish electricity distribution sector, rural areas in particular, is facing major challenges because of the economic regulation, tightening supply security requirements and the ageing network asset. Therefore, the target in the distribution network planning and asset management is to develop and renovate the networks to meet these challenges in compliance with the regulations in an economically feasible way. Concerning supply security, the new Finnish Electricity Market Act limits the maximum duration of electricity supply interruptions to six hours in urban areas and 36 hours in rural areas. This has a significant impact on distribution network planning, especially in rural areas where the distribution networks typically require extensive modifications and renovations to meet the supply security requirements. This doctoral thesis introduces a methodology to analyse electricity distribution system development. The methodology is based on and combines elements of reliability analysis, asset management and economic regulation. The analysis results can be applied, for instance, to evaluate the development of distribution reliability and to consider actions to meet the tightening regulatory requirements. Thus, the methodology produces information for strategic decision-making so that DSOs can respond to challenges arising in the electricity distribution sector. The key contributions of the thesis are a network renovation concept for rural areas, an analysis to assess supply security, and an evaluation of the effects of economic regulation on the strategic network planning. In addition, the thesis demonstrates how the reliability aspect affects the placement of automation devices and how the reserve power can be arranged in a rural area network.
Resumo:
Recent Storms in Nordic countries were a reason of long power outages in huge territories. After these disasters distribution networks' operators faced with a problem how to provide adequate quality of supply in such situation. The decision of utilization cable lines rather than overhead lines were made, which brings new features to distribution networks. The main idea of this work is a complex analysis of medium voltage distribution networks with long cable lines. High value of cable’s specific capacitance and length of lines determine such problems as: high values of earth fault currents, excessive amount of reactive power flow from distribution to transmission network, possibility of a high voltage level at the receiving end of cable feeders. However the core tasks was to estimate functional ability of the earth fault protection and the possibility to utilize simplified formulas for operating setting calculations in this network. In order to provide justify solution or evaluation of mentioned above problems corresponding calculations were made and in order to analyze behavior of relay protection principles PSCAD model of the examined network have been created. Evaluation of the voltage rise in the end of a cable line have educed absence of a dangerous increase in a voltage level, while excessive value of reactive power can be a reason of final penalty according to the Finish regulations. It was proved and calculated that for this networks compensation of earth fault currents should be implemented. In PSCAD models of the electrical grid with isolated neutral, central compensation and hybrid compensation were created. For the network with hybrid compensation methodology which allows to select number and rated power of distributed arc suppression coils have been offered. Based on the obtained results from experiments it was determined that in order to guarantee selective and reliable operation of the relay protection should be utilized hybrid compensation with connection of high-ohmic resistor. Directional and admittance based relay protection were tested under these conditions and advantageous of the novel protection were revealed. However, for electrical grids with extensive cabling necessity of a complex approach to the relay protection were explained and illustrated. Thus, in order to organize reliable earth fault protection is recommended to utilize both intermittent and conventional relay protection with operational settings calculated by the use of simplified formulas.
Resumo:
Recent developments in power electronics technology have made it possible to develop competitive and reliable low-voltage DC (LVDC) distribution networks. Further, islanded microgrids—isolated small-scale localized distribution networks— have been proposed to reliably supply power using distributed generations. However, islanded operations face many issues such as power quality, voltage regulation, network stability, and protection. In this thesis, an energy management system (EMS) that ensures efficient energy and power balancing and voltage regulation has been proposed for an LVDC island network utilizing solar panels for electricity production and lead-acid batteries for energy storage. The EMS uses the master/slave method with robust communication infrastructure to control the production, storage, and loads. The logical basis for the EMS operations has been established by proposing functionalities of the network components as well as by defining appropriate operation modes that encompass all situations. During loss-of-powersupply periods, load prioritizations and disconnections are employed to maintain the power supply to at least some loads. The proposed EMS ensures optimal energy balance in the network. A sizing method based on discrete-event simulations has also been proposed to obtain reliable capacities of the photovoltaic array and battery. In addition, an algorithm to determine the number of hours of electric power supply that can be guaranteed to the customers at any given location has been developed. The successful performances of all the proposed algorithms have been demonstrated by simulations.
Resumo:
The electricity distribution sector will face significant changes in the future. Increasing reliability demands will call for major network investments. At the same time, electricity end-use is undergoing profound changes. The changes include future energy technologies and other advances in the field. New technologies such as microgeneration and electric vehicles will have different kinds of impacts on electricity distribution network loads. In addition, smart metering provides more accurate electricity consumption data and opportunities to develop sophisticated load modelling and forecasting approaches. Thus, there are both demands and opportunities to develop a new type of long-term forecasting methodology for electricity distribution. The work concentrates on the technical and economic perspectives of electricity distribution. The doctoral dissertation proposes a methodology to forecast electricity consumption in the distribution networks. The forecasting process consists of a spatial analysis, clustering, end-use modelling, scenarios and simulation methods, and the load forecasts are based on the application of automatic meter reading (AMR) data. The developed long-term forecasting process produces power-based load forecasts. By applying these results, it is possible to forecast the impacts of changes on electrical energy in the network, and further, on the distribution system operator’s revenue. These results are applicable to distribution network and business planning. This doctoral dissertation includes a case study, which tests the forecasting process in practice. For the case study, the most prominent future energy technologies are chosen, and their impacts on the electrical energy and power on the network are analysed. The most relevant topics related to changes in the operating environment, namely energy efficiency, microgeneration, electric vehicles, energy storages and demand response, are discussed in more detail. The study shows that changes in electricity end-use may have radical impacts both on electrical energy and power in the distribution networks and on the distribution revenue. These changes will probably pose challenges for distribution system operators. The study suggests solutions for the distribution system operators on how they can prepare for the changing conditions. It is concluded that a new type of load forecasting methodology is needed, because the previous methods are no longer able to produce adequate forecasts.
Resumo:
The research towards efficient, reliable and environmental-friendly power supply solutions is producing growing interest to the “Smart Grid” approach for the development of the electricity networks and managing the increasing energy consumption. One of the novel approaches is an LVDC microgrid. The purpose of the research is to analyze the possibilities for the implementation of LVDC microgrids in public distribution networks in Russia. The research contains the analysis of the modern Russian electric power industry, electricity market, electricity distribution business, regulatory framework and standardization, related to the implementation of LVDC microgrid concept. For the purpose of the economic feasibility estimation, a theoretical case study for comparing low voltage AC and medium voltage AC with LVDC microgrid solutions for a small settlement in Russia is presented. The results of the market and regulatory framework analysis along with the economic comparison of AC and DC solutions show that implementation of the LVDC microgrid concept in Russia is possible and can be economically feasible. From the electric power industry and regulatory framework point of view, there are no serious obstacles for the LVDC microgrids in Russian distribution networks. However, the most suitable use cases at the moment are expected to be found in the electrification of remote settlements, which are isolated from the Unified Energy System of Russia.
Resumo:
In distributed energy production, permanent magnet synchronous generators (PMSG) are often connected to the grid via frequency converters, such as voltage source line converters. The price of the converter may constitute a large part of the costs of a generating set. Some of the permanent magnet synchronous generators with converters and traditional separately excited synchronous generators couldbe replaced by direct-on-line (DOL) non-controlled PMSGs. Small directly networkconnected generators are likely to have large markets in the area of distributed electric energy generation. Typical prime movers could be windmills, watermills and internal combustion engines. DOL PMSGs could also be applied in island networks, such as ships and oil platforms. Also various back-up power generating systems could be carried out with DOL PMSGs. The benefits would be a lower priceof the generating set and the robustness and easy use of the system. The performance of DOL PMSGs is analyzed. The electricity distribution companies have regulations that constrain the design of the generators being connected to the grid. The general guidelines and recommendations are applied in the analysis. By analyzing the results produced by the simulation model for the permanent magnet machine, the guidelines for efficient damper winding parameters for DOL PMSGs are presented. The simulation model is used to simulate grid connections and load transients. The damper winding parameters are calculated by the finite element method (FEM) and determined from experimental measurements. Three-dimensional finite element analysis (3D FEA) is carried out. The results from the simulation model and 3D FEA are compared with practical measurements from two prototype axial flux permanent magnet generators provided with damper windings. The dimensioning of the damper winding parameters is case specific. The damper winding should be dimensioned based on the moment of inertia of the generating set. It is shown that the damper winding has optimal values to reach synchronous operation in the shortest period of time after transient operation. With optimal dimensioning, interferenceon the grid is minimized.