81 resultados para Power system management
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
The application of VSC-HVDC technology throughout the world has turned out to be an efficient solution regarding a large share of wind power in different power systems. This technology enhances the overall reliability of the grid by utilization of the active and reactive power control schemes which allows to maintain frequency and voltage on busbars of the end-consumers at the required level stated by the network operator. This master’s thesis is focused on the existing and planned wind farms as well as electric power system of the Åland Islands. The goal is to analyze the wind conditions of the islands and appropriately predict a possible production of the existing and planned wind farms with a help of WAsP software program. Further, to investigate the influence of increased wind power it is necessary to develop a simulation model of the electric grid and VSC-HVDC system in PSCAD and examine grid response to different wind power production cases with respect to the grid code requirements and ensure the stability of the power system.
Resumo:
This thesis reviews the role of nuclear and conventional power plants in the future energy system. The review is done by utilizing freely accesible publications in addition to generating load duration and ramping curves for Nordic energy system. As the aim of the future energy system is to reduce GHG-emissions and avoid further global warming, the need for flexible power generation increases with the increased share of intermittent renewables. The goal of this thesis is to offer extensive understanding of possibilities and restrictions that nuclear power and conventional power plants have regarding flexible and sustainable generation. As a conclusion, nuclear power is the only technology that is able to provide large scale GHG-free power output variations with good ramping values. Most of the currently operating plants are able to take part in load following as the requirement to do so is already required to be included in the plant design. Load duration and ramping curves produced prove that nuclear power is able to cover most of the annual generation variation and ramping needs in the Nordic energy system. From the conventional power generation methods, only biomass combustion can be considered GHG-free because biomass is considered carbon neutral. CFB combusted biomass has good load follow capabilities in good ramping and turndown ratios. All the other conventional power generation technologies generate GHG-emissions and therefore the use of these technologies should be reduced.
Resumo:
Diplomityö muodostuu kahdesta kokonaisuudesta. Työn teoriaosa kertoo mitä ympäristöjohtaminen on, millaisia ovat multi-site -organisaatio ja multi-site -johtamisjärjestelmä sekä mitä vaatimuksia nämä asettavat yritykselle. Työssä esitetään malli, jota käyttämällä kansainvälisten johtamisjärjestelmästandardien mukaan rakennetut laatu-, ympäristö-, terveys- ja turvallisuusjärjestelmät voidaan yhdistää yhdeksi kokonaisuudeksi, multi-site - johtamisjärjestelmäksi. Malli rakentuu kolmesta tasosta, joita ovat paikallinen, maakohtainen ja konsernitaso. Esimerkkien avulla kerrotaan miteneri lähtökohdista voidaan näiden tasojen kautta edetä kohti yhtä johtamiskokonaisuutta. Esille tuodaan myös multi-site -johtamisjärjestelmän käyttöönottoa puoltavat ja vastustavat näkökohdat. Työn konkreettinen osa on johtamisjärjestelmämallin paikallisen tason toteuttaminen. Ympäristöjohtamisjärjestelmän rakentaminen standardin EN ISO 14001:2004 vaatimusten mukaiseksi Kvaerner Power Oy:n Suomen toimipaikoille sekä tämän järjestelmän yhdistäminen sertifioituun EN ISO 9001 -standardin mukaiseen laatujärjestelmään. Työssä kerrotaan miten ympäristöjohtamisjärjestelmä on rakennettu ja miten laatu- ja ympäristöjärjestelmät on liitetty yhdeksi kokonaisuudeksi. Työn tuloksena syntyi malli johtamisjärjestelmien yhdistämisestä sekä sertifioitu ympäristöjohtamisjärjestelmä, jonka yhdistäminen laatujärjestelmään toteutettiin tavoitteiden mukaisesti.
Resumo:
Focus of this thesisis made on development of electricity sector of Russian North-West. The objective was to determine the most likely scenarios for development of the most critical (western) part of Interregional Power System of North-West, from where the most part of Russian electricity exports to the countries of European Union take place. For this purpose all the involved sides were analyzed: generation, transmission system and electricity consumption in different regions of Russian North-West. The analysis was performed through investigation of existing generation andtransmission capacities and plans for their development to be performed by the generation and transmission companies operating in the region. Principles of Russian electricity sector restructuring and electricity market design are also discussed as well as factors that may influence on future electricity price in the region.
Resumo:
Tietojärjestelmien konsolidointi on eräs vallalla olevista trendeistä, jonka avulla yritykset parantavat järjestelmiensä hallittavuutta sekä kustannustehokkuutta. Tutkimuksen tarkoituksena oli analysoida monikansallisen yrityksen tietojärjestelmän konsolidointiprojektia. Tavoitteena oli kuvata projektissa käytetty konsolidointimalli sekä evaluoida syntyneitä liiketoiminnallisia vaikutuksia. Työn teoreettisessa osassa esitellään tietojärjestelmien hallintaan sekä konsolidointiin vaikuttavia perustekijöitä. Lisäksi analysoidaan merkittäviä liiketoiminnallisia etuja,jotka konsolidointi mahdollistaa. Työn empiirisessä osassa kuvataan yrityksen näkökulmasta konsolidointiin johtavia syitä, projektin kulkua sekä saavutettuja liiketoiminnallisia hyötyjä. Työn tulokset osoittavat, että konsolidoimalla tietojärjestelmiään yritys pystyy parantamaan tehokkuuttaan, palveluastettaan sekä liiketoiminnallista joustavuuttaan monin eri tavoin. Työssä esitettyä konsolidointimallia sekä analyysia liiketoiminnallisista vaikutuksista voidaan hyödyntää tulevien projektien suunnittelussa ja toteutuksessa.
Resumo:
Virtalähdejärjestelmä koostuu itsenäisesti toimivista virtalähdeyksiköistä. Virtalähdeyksiköt ovat rinnankytketty syöttämään virtaa kuormaan. Tämä diplomityö käsittelee virtalähdeyksiköiden ohjaamiseen liittyviä ongelmia ja ratkaisuja. Työssä suunnitellaan virtalähdejärjestelmän ohjauselektroniikkaa sekä mikrokontrollerin ohjelmakoodia. Lisäksi kehitetään ratkaisuja virtalähteen hallintaan ja automaattiseen ohjaukseen. Huomiota kiinnitetään vikasietoisuuteen ja käyttäjäystävällisyyteen.
Resumo:
In liberalized electricity markets, which have taken place in many countries over the world, the electricity distribution companies operate in the competitive conditions. Therefore, accurate information about the customers’ energy consumption plays an essential role for the budget keeping of the distribution company and for correct planning and operation of the distribution network. This master’s thesis is focused on the description of the possible benefits for the electric utilities and residential customers from the automatic meter reading system usage. Major benefits of the AMR, illustrated in the thesis, are distribution network management, power quality monitoring, load modelling, and detection of the illegal usage of the electricity. By the example of the power system state estimation, it was illustrated that even the partial installation of the AMR in the customer side leads to more accurate data about the voltage and power levels in the whole network. The thesis also contains the description of the present situation of the AMR integration in Russia.
Resumo:
The general striving to bring down the number of municipal landfills and to increase the reuse and recycling of waste-derived materials across the EU supports the debates concerning the feasibility and rationality of waste management systems. Substantial decrease in the volume and mass of landfill-disposed waste flows can be achieved by directing suitable waste fractions to energy recovery. Global fossil energy supplies are becoming more and more valuable and expensive energy sources for the mankind, and efforts to save fossil fuels have been made. Waste-derived fuels offer one potential partial solution to two different problems. First, waste that cannot be feasibly re-used or recycled is utilized in the energy conversion process according to EU’s Waste Hierarchy. Second, fossil fuels can be saved for other purposes than energy, mainly as transport fuels. This thesis presents the principles of assessing the most sustainable system solution for an integrated municipal waste management and energy system. The assessment process includes: · formation of a SISMan (Simple Integrated System Management) model of an integrated system including mass, energy and financial flows, and · formation of a MEFLO (Mass, Energy, Financial, Legislational, Other decisionsupport data) decision matrix according to the selected decision criteria, including essential and optional decision criteria. The methods are described and theoretical examples of the utilization of the methods are presented in the thesis. The assessment process involves the selection of different system alternatives (process alternatives for treatment of different waste fractions) and comparison between the alternatives. The first of the two novelty values of the utilization of the presented methods is the perspective selected for the formation of the SISMan model. Normally waste management and energy systems are operated separately according to the targets and principles set for each system. In the thesis the waste management and energy supply systems are considered as one larger integrated system with one primary target of serving the customers, i.e. citizens, as efficiently as possible in the spirit of sustainable development, including the following requirements: · reasonable overall costs, including waste management costs and energy costs; · minimum environmental burdens caused by the integrated waste management and energy system, taking into account the requirement above; and · social acceptance of the selected waste treatment and energy production methods. The integrated waste management and energy system is described by forming a SISMan model including three different flows of the system: energy, mass and financial flows. By defining the three types of flows for an integrated system, the selected factor results needed in the decision-making process of the selection of waste management treatment processes for different waste fractions can be calculated. The model and its results form a transparent description of the integrated system under discussion. The MEFLO decision matrix has been formed from the results of the SISMan model, combined with additional data, including e.g. environmental restrictions and regional aspects. System alternatives which do not meet the requirements set by legislation can be deleted from the comparisons before any closer numerical considerations. The second novelty value of this thesis is the three-level ranking method for combining the factor results of the MEFLO decision matrix. As a result of the MEFLO decision matrix, a transparent ranking of different system alternatives, including selection of treatment processes for different waste fractions, is achieved. SISMan and MEFLO are methods meant to be utilized in municipal decision-making processes concerning waste management and energy supply as simple, transparent and easyto- understand tools. The methods can be utilized in the assessment of existing systems, and particularly in the planning processes of future regional integrated systems. The principles of SISMan and MEFLO can be utilized also in other environments, where synergies of integrating two (or more) systems can be obtained. The SISMan flow model and the MEFLO decision matrix can be formed with or without any applicable commercial or free-of-charge tool/software. SISMan and MEFLO are not bound to any libraries or data-bases including process information, such as different emission data libraries utilized in life cycle assessments.
Resumo:
This study compares different electric propulsion systems. Results of the analysis of all the advantages and disadvantages of the different propulsion systems are given. This thesis estimates possibilities to apply different diesel-electric propulsion concepts for different vessel types. Small and medium size vessel’s power ranges are studied. The optimal delivery system is chosen. This choice is made on the base of detailed study of the concepts, electrical equipment market and comparison of mass, volume and efficiency parameters. In this thesis three marine generators are designed. They are: salient pole synchronous generator and two permanent magnet synchronous generators. Their electrical, dimensional, cost and efficiency parameters are compared. To understand all the benefits diagrams with these parameters are prepared. Possible benefits and money savings are estimated. As the result the advantages, disadvantages and boundary conditions for the permanent magnet synchronous generator application in marine electric-power systems are found out.
Resumo:
All over the world power systems become bigger and bigger every day. New equipment is installed, new feeders are constructed, new power units are installed. Some old elements of the network, however, are not changed in time. As a result, “bottlenecks” for capacity transmission can occur. By locked power problem the situation when a power plant has installed capacity exceeding the power it can actually deliver is usually meant. Regime, scheme or even technical restrictions-related issues usually cause this kind of problem. It is really important, since from the regime point of view it is typical decision to have a mobile capacity reserve, in case of malfunctions. And, what can be even more significant, power plant owner (JSC Fortum in our case) losses his money because of selling less electrical energy. The goal of master`s thesis is to analyze the current state of Chelyabinsk power system and the CHP-3 (Combined Heat and Power plant) in particular in relation with it`s ability to deliver the whole capacity of the CHP in it`s existing state and also taking into consideration the prospect of power unit 3 installation by the fourth quarter of 2010. The thesis contains some general information about the UPS of Russia, CPS of Ural, power system of Chelyabinsk and the Chelyabinsk region itself. Then the CHP-3 is described from technical point of view with it`s equipment observation. Regimes for the nowadays power system and for the system after the power unit 3 installation are reviewed. The problems occurring are described and, finally, a solution is offered.
Resumo:
Sähkön tuotannon ja kulutuksen välillä tulee vallita tasapaino joka hetki. Tunninsisäinen tehotasapainon hallinta on kantaverkkoyhtiön vastuulla, ja se tehdään säätöresurssein. Tässä työssä tarkastellaan tunninsisäistä tehotasapainon hallintaa Suomessa 2020-luvun alussa ja loppupuolella. Työn tarkoituksena on arvioida, riittävätkö nykytilanteen mukaiset säätöresurssit kattamaan tulevat säätötarpeet ja kuinka suuria säätövajeita, eli erotuksia markkinaehtoisen säätökyvyn ja säätötarpeen välillä, mahdollisesti esiintyy. Tehotasapainon hallintaa tarkastellaan tarkemmin kuudessa esimerkki-markkinatilanteessa. Tilanteet ajoittuvat tällä hetkellä tehotasapainon hallinnan kannalta hankaliin ajankohtiin, kevään tulva-ajalle, kesän lomakaudelle ja talven huippukuormitustilanteeseen. Tarkastelutilanteiden avulla pyritäänkin selvittämään hankalimmat tilanteet, joita tehotasapainon hallinnassa 2020-luvulla voidaan kohdata. Työn tarkastelutilanteiden perusteella säätövaje voi olla suurimmillaan 200 - 1100 MW Suomessa 2020-luvulla. Tämä työ vastaa myös siihen, mitä tulisi tehdä, jotta selvittäisiin tehotasapainon hallinnasta kaikissa tilanteissa tulevalla vuosikymmenellä.
Resumo:
Ambitious energy targets set by EU put pressures to increase share of renewable electricity supply in this and next decades and therefore, some EU member countries have boosted increasing renewable energy generation capacity by implementing subsidy schemes on national level. In this study, two different change approaches to increase renewable energy supply and increase self-sufficiency of supply are assessed with respect to their impacts on power system, electricity market and electricity generation costs in Finland. It is obtained that the current electricity generation costs are high compared to opportunities of earnings from present-day investor’s perspective. In addition, the growth expectations of consumptions and the price forecasts do not stimulate investing in new generation capacity. Revolutionary transition path is driven by administrative and political interventions to achieve the energy targets. Evolutionary transition path is driven by market-based mechanisms, such as market itself and emission trading scheme. It is obtained in this study that in the revolutionary transition path operation of market-based mechanisms is distorted to some extent and it is likely that this path requires providing more public financial resources compared to evolutionary transition path. In the evolutionary transition path the energy targets are not achieved as quickly but market-based mechanisms function better and investment environment endures more stable compared to revolutionary transition path.
Resumo:
Viranomaisvaatimuksen mukaan ydinvoimalaitoksen toiminnan perustana tulee olla johtamisjärjestelmä, joka kattaa organisaation rakenteen ja prosessit, henkilöstön vastuut ja valtuudet sekä päätöksentekomenettelyt. Sen tulee myös tukea hyvää turvallisuuskulttuuria ja varmistaa että ydin- ja säteilyturvallisuuteen liittyvät vaatimukset täyttyvät kaikessa toiminnassa. Loviisan voimalaitoksen johtamisjärjestelmä ohjaa voimalaitoksen käyttötoimintaa ja se on kuvattuna voimalaitosohjeistossa joka käsittää voimalaitoksen politiikat, laadunvarmistuskäsikirjat sekä erilaiset ohjeet. Loviisan voimalaitoksen toimintaa seurataan ja arvioidaan säännöllisesti mm. auditoinneilla. Seurannan ja arvioinnin tarkoituksena on tunnistaa johtamisjärjestelmän mahdolliset kehittämisalueet ja varmistaa täyttääkö toiminta sille asetetut vaatimukset. Tämä opinnäyte pohjautuu sisäisessä auditoinnissa havaittuun puutteeseen voimalaitoksen työlupakäytännöissä. Työssä toteutettiin mobiilijärjestelmä, jonka tarkoituksena on parantaa kunnossapitotöihin liittyvien työlupien jälkiseurantaa. Tällaisia työlupaa vaativia töitä ovat mm. tuli- ja säteilytyöt, joiden suorittamiseen liittyy riskejä kuten palo- ja räjähdysvaara tai tarpeeton altistuminen säteilylle. Mobiilijärjestelmä toteutettiin monikansallisena projektina osana laajempaa Loviisan voimalaitoksen laitostietojärjestelmän uusintaprojektia.
Resumo:
Thesis: A liquid-cooled, direct-drive, permanent-magnet, synchronous generator with helical, double-layer, non-overlapping windings formed from a copper conductor with a coaxial internal coolant conduit offers an excellent combination of attributes to reliably provide economic wind power for the coming generation of wind turbines with power ratings between 5 and 20MW. A generator based on the liquid-cooled architecture proposed here will be reliable and cost effective. Its smaller size and mass will reduce build, transport, and installation costs. Summary: Converting wind energy into electricity and transmitting it to an electrical power grid to supply consumers is a relatively new and rapidly developing method of electricity generation. In the most recent decade, the increase in wind energy’s share of overall energy production has been remarkable. Thousands of land-based and offshore wind turbines have been commissioned around the globe, and thousands more are being planned. The technologies have evolved rapidly and are continuing to evolve, and wind turbine sizes and power ratings are continually increasing. Many of the newer wind turbine designs feature drivetrains based on Direct-Drive, Permanent-Magnet, Synchronous Generators (DD-PMSGs). Being low-speed high-torque machines, the diameters of air-cooled DD-PMSGs become very large to generate higher levels of power. The largest direct-drive wind turbine generator in operation today, rated just below 8MW, is 12m in diameter and approximately 220 tonne. To generate higher powers, traditional DD-PMSGs would need to become extraordinarily large. A 15MW air-cooled direct-drive generator would be of colossal size and tremendous mass and no longer economically viable. One alternative to increasing diameter is instead to increase torque density. In a permanent magnet machine, this is best done by increasing the linear current density of the stator windings. However, greater linear current density results in more Joule heating, and the additional heat cannot be removed practically using a traditional air-cooling approach. Direct liquid cooling is more effective, and when applied directly to the stator windings, higher linear current densities can be sustained leading to substantial increases in torque density. The higher torque density, in turn, makes possible significant reductions in DD-PMSG size. Over the past five years, a multidisciplinary team of researchers has applied a holistic approach to explore the application of liquid cooling to permanent-magnet wind turbine generator design. The approach has considered wind energy markets and the economics of wind power, system reliability, electromagnetic behaviors and design, thermal design and performance, mechanical architecture and behaviors, and the performance modeling of installed wind turbines. This dissertation is based on seven publications that chronicle the work. The primary outcomes are the proposal of a novel generator architecture, a multidisciplinary set of analyses to predict the behaviors, and experimentation to demonstrate some of the key principles and validate the analyses. The proposed generator concept is a direct-drive, surface-magnet, synchronous generator with fractional-slot, duplex-helical, double-layer, non-overlapping windings formed from a copper conductor with a coaxial internal coolant conduit to accommodate liquid coolant flow. The novel liquid-cooling architecture is referred to as LC DD-PMSG. The first of the seven publications summarized in this dissertation discusses the technological and economic benefits and limitations of DD-PMSGs as applied to wind energy. The second publication addresses the long-term reliability of the proposed LC DD-PMSG design. Publication 3 examines the machine’s electromagnetic design, and Publication 4 introduces an optimization tool developed to quickly define basic machine parameters. The static and harmonic behaviors of the stator and rotor wheel structures are the subject of Publication 5. And finally, Publications 6 and 7 examine steady-state and transient thermal behaviors. There have been a number of ancillary concrete outcomes associated with the work including the following. X Intellectual Property (IP) for direct liquid cooling of stator windings via an embedded coaxial coolant conduit, IP for a lightweight wheel structure for lowspeed, high-torque electrical machinery, and IP for numerous other details of the LC DD-PMSG design X Analytical demonstrations of the equivalent reliability of the LC DD-PMSG; validated electromagnetic, thermal, structural, and dynamic prediction models; and an analytical demonstration of the superior partial load efficiency and annual energy output of an LC DD-PMSG design X A set of LC DD-PMSG design guidelines and an analytical tool to establish optimal geometries quickly and early on X Proposed 8 MW LC DD-PMSG concepts for both inner and outer rotor configurations Furthermore, three technologies introduced could be relevant across a broader spectrum of applications. 1) The cost optimization methodology developed as part of this work could be further improved to produce a simple tool to establish base geometries for various electromagnetic machine types. 2) The layered sheet-steel element construction technology used for the LC DD-PMSG stator and rotor wheel structures has potential for a wide range of applications. And finally, 3) the direct liquid-cooling technology could be beneficial in higher speed electromotive applications such as vehicular electric drives.
Resumo:
In modern society, the body health is a very important issue to everyone. With the development of the science and technology, the new and developed body health monitoring device and technology will play the key role in the daily medical activities. This paper focus on making progress in the design of the wearable vital sign system. A vital sign monitoring system has been proposed and designed. The whole detection system is composed of signal collecting subsystem, signal processing subsystem, short-range wireless communication subsystem and user interface subsystem. The signal collecting subsystem is composed of light source and photo diode, after emiting light of two different wavelength, the photo diode collects the light signal reflected by human body tissue. The signal processing subsystem is based on the analog front end AFE4490 and peripheral circuits, the collected analog signal would be filtered and converted into digital signal in this stage. After a series of processing, the signal would be transmitted to the short-range wireless communication subsystem through SPI, this subsystem is mainly based on Bluetooth 4.0 protocol and ultra-low power System on Chip(SoC) nRF51822. Finally, the signal would be transmitted to the user end. After proposing and building the system, this paper focus on the research of the key component in the system, that is, the photo detector. Based on the study of the perovskite materials, a low temperature processed photo detector has been proposed, designed and researched. The device is made up of light absorbing layer, electron transporting and hole blocking layer, hole transporting and electron blocking layer, conductive substrate layer and metal electrode layer. The light absorbing layer is the important part of whole device, and it is fabricated by perovskite materials. After accepting the light, the electron-hole pair would be produced in this layer, and due to the energy level difference, the electron and hole produced would be transmitted to metal electrode and conductive substrate electrode through electron transporting layer and hole transporting layer respectively. In this way the response current would be produced. Based on this structure, the specific fabrication procedure including substrate cleaning; PEDOT:PSS layer preparation; pervoskite layer preparation; PCBM layer preparation; C60, BCP, and Ag electrode layer preparation. After the device fabrication, a series of morphological characterization and performance testing has been done. The testing procedure including film-forming quality inspection, response current and light wavelength analysis, linearity and response time and other optical and electrical properties testing. The testing result shows that the membrane has been fabricated uniformly; the device can produce obvious response current to the incident light with the wavelength from 350nm to 800nm, and the response current could be changed along with the light wavelength. When the light wavelength keeps constant, there exists a good linear relationship between the intensity of the response current and the power of the incident light, based on which the device could be used as the photo detector to collect the light information. During the changing period of the light signal, the response time of the device is several microseconds, which is acceptable working as a photo detector in our system. The testing results show that the device has good electronic and optical properties, and the fabrication procedure is also repeatable, the properties of the devices has good uniformity, which illustrates the fabrication method and procedure could be used to build the photo detector in our wearable system. Based on a series of testing results, the paper has drawn the conclusion that the photo detector fabricated could be integrated on the flexible substrate and is also suitable for the monitoring system proposed, thus made some progress on the research of the wearable monitoring system and device. Finally, some future prospect in system design aspect and device design and fabrication aspect are proposed.