112 resultados para Offshore wind farm costs
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
Thesis: A liquid-cooled, direct-drive, permanent-magnet, synchronous generator with helical, double-layer, non-overlapping windings formed from a copper conductor with a coaxial internal coolant conduit offers an excellent combination of attributes to reliably provide economic wind power for the coming generation of wind turbines with power ratings between 5 and 20MW. A generator based on the liquid-cooled architecture proposed here will be reliable and cost effective. Its smaller size and mass will reduce build, transport, and installation costs. Summary: Converting wind energy into electricity and transmitting it to an electrical power grid to supply consumers is a relatively new and rapidly developing method of electricity generation. In the most recent decade, the increase in wind energy’s share of overall energy production has been remarkable. Thousands of land-based and offshore wind turbines have been commissioned around the globe, and thousands more are being planned. The technologies have evolved rapidly and are continuing to evolve, and wind turbine sizes and power ratings are continually increasing. Many of the newer wind turbine designs feature drivetrains based on Direct-Drive, Permanent-Magnet, Synchronous Generators (DD-PMSGs). Being low-speed high-torque machines, the diameters of air-cooled DD-PMSGs become very large to generate higher levels of power. The largest direct-drive wind turbine generator in operation today, rated just below 8MW, is 12m in diameter and approximately 220 tonne. To generate higher powers, traditional DD-PMSGs would need to become extraordinarily large. A 15MW air-cooled direct-drive generator would be of colossal size and tremendous mass and no longer economically viable. One alternative to increasing diameter is instead to increase torque density. In a permanent magnet machine, this is best done by increasing the linear current density of the stator windings. However, greater linear current density results in more Joule heating, and the additional heat cannot be removed practically using a traditional air-cooling approach. Direct liquid cooling is more effective, and when applied directly to the stator windings, higher linear current densities can be sustained leading to substantial increases in torque density. The higher torque density, in turn, makes possible significant reductions in DD-PMSG size. Over the past five years, a multidisciplinary team of researchers has applied a holistic approach to explore the application of liquid cooling to permanent-magnet wind turbine generator design. The approach has considered wind energy markets and the economics of wind power, system reliability, electromagnetic behaviors and design, thermal design and performance, mechanical architecture and behaviors, and the performance modeling of installed wind turbines. This dissertation is based on seven publications that chronicle the work. The primary outcomes are the proposal of a novel generator architecture, a multidisciplinary set of analyses to predict the behaviors, and experimentation to demonstrate some of the key principles and validate the analyses. The proposed generator concept is a direct-drive, surface-magnet, synchronous generator with fractional-slot, duplex-helical, double-layer, non-overlapping windings formed from a copper conductor with a coaxial internal coolant conduit to accommodate liquid coolant flow. The novel liquid-cooling architecture is referred to as LC DD-PMSG. The first of the seven publications summarized in this dissertation discusses the technological and economic benefits and limitations of DD-PMSGs as applied to wind energy. The second publication addresses the long-term reliability of the proposed LC DD-PMSG design. Publication 3 examines the machine’s electromagnetic design, and Publication 4 introduces an optimization tool developed to quickly define basic machine parameters. The static and harmonic behaviors of the stator and rotor wheel structures are the subject of Publication 5. And finally, Publications 6 and 7 examine steady-state and transient thermal behaviors. There have been a number of ancillary concrete outcomes associated with the work including the following. X Intellectual Property (IP) for direct liquid cooling of stator windings via an embedded coaxial coolant conduit, IP for a lightweight wheel structure for lowspeed, high-torque electrical machinery, and IP for numerous other details of the LC DD-PMSG design X Analytical demonstrations of the equivalent reliability of the LC DD-PMSG; validated electromagnetic, thermal, structural, and dynamic prediction models; and an analytical demonstration of the superior partial load efficiency and annual energy output of an LC DD-PMSG design X A set of LC DD-PMSG design guidelines and an analytical tool to establish optimal geometries quickly and early on X Proposed 8 MW LC DD-PMSG concepts for both inner and outer rotor configurations Furthermore, three technologies introduced could be relevant across a broader spectrum of applications. 1) The cost optimization methodology developed as part of this work could be further improved to produce a simple tool to establish base geometries for various electromagnetic machine types. 2) The layered sheet-steel element construction technology used for the LC DD-PMSG stator and rotor wheel structures has potential for a wide range of applications. And finally, 3) the direct liquid-cooling technology could be beneficial in higher speed electromotive applications such as vehicular electric drives.
Resumo:
Tässä diplomityössä selvitetään teollisen mittakaavan merituulipuistojen taloudellisia ja osin myös teknisiä rakentamisedellytyksiä Kokkolan seudun rannikolla. Lisäksi työssä tarkastellaan erilaisten tukitoimien vaikutusta tuulivoiman kannattavuuteen sekä selvitetään lyhyesti merituulivoiman hallinnollisia ja oikeudellisia edellytyksiä. Esimerkkikohteina tarkastellaan viittä Kokkolan edustalle suunniteltua merituulipuistoa, joiden tehot ovat 20 – 100 MW ja yksikkökoot 1,8 – 5 MW. Tuulipuistojen tuuliolot on arvioitu läheisten mittauspisteiden tietojen perusteella ja niiden pohjalta on laskettu puistojen energiantuotto. Tuulivoimaloiden huipunkäyttöajoiksi on saatu noin 2400 – 2500 h/a. Puistojen investointikustannukset ovat noin 6 500 –10 200 mk/kW: itse turbiinin lisäksi suurimpia kustannuseriä ovat perustukset ja sähköverkkoliitäntä. Vuosittaisten käyttö- ja kunnossapitokustannusten suuruudeksi on arvioitu noin 3 % investointikustannuksista. Kannattavuustarkastelut on suoritettu 5 % laskentakorolla ja 25 vuoden pitoajalle. Tuotantokustannukset ovat ilman tukia noin 27 – 38 p/kWh. Kun sähkön hintana on 150 mk/MWh, ei taloudellista kannattavuutta voida saavuttaa edes nykyisin käytössä olevan investointi- ja tuotantotuen avulla. Tuulisähköstä saatava mahdollinen ”vihreän sähkön lisä” tai päästökaupan aloittaminen voisivat mahdollistaa tuulivoiman taloudellisen kannattavuuden myös silloin, kun sähkön hintataso on matala. Kannattavuutta voitaisiin parantaa myös tukijärjestelmällä, joka painottaa nykyistä enemmän tuotantoa.
Resumo:
In the latter days, human activities constantly increase greenhouse gases emissions in the atmosphere, which has a direct impact on a global climate warming. Finland as European Union member, developed national structural plan to promote renewable energy generation, pursuing the aspects of Directive 2009/28/EC and put it on the sharepoint. Finland is on a way of enhancing national security of energy supply, increasing diversity of the energy mix. There are plenty significant objectives to develop onshore and offshore wind energy generation in country for a next few decades, as well as another renewable energy sources. To predict the future changes, there are a lot of scenario methods developed and adapted to energy industry. The Master’s thesis explored “Fuzzy cognitive maps” approach in scenarios developing, which captures expert’s knowledge in a graphical manner and using these captures for a raw scenarios testing and refinement. There were prospects of Finnish wind energy development for the year of 2030 considered, with aid of FCM technique. Five positive raw scenarios were developed and three of them tested against integrated expert’s map of knowledge, using graphical simulation. The study provides robust scenarios out of the preliminary defined, as outcome, assuming the impact of results, taken after simulation. The thesis was conducted in such way, that there will be possibilities to use existing knowledge captures from expert panel, to test and deploy different sets of scenarios regarding to Finnish wind energy development.
Resumo:
Wind energy has obtained outstanding expectations due to risks of global warming and nuclear energy production plant accidents. Nowadays, wind farms are often constructed in areas of complex terrain. A potential wind farm location must have the site thoroughly surveyed and the wind climatology analyzed before installing any hardware. Therefore, modeling of Atmospheric Boundary Layer (ABL) flows over complex terrains containing, e.g. hills, forest, and lakes is of great interest in wind energy applications, as it can help in locating and optimizing the wind farms. Numerical modeling of wind flows using Computational Fluid Dynamics (CFD) has become a popular technique during the last few decades. Due to the inherent flow variability and large-scale unsteadiness typical in ABL flows in general and especially over complex terrains, the flow can be difficult to be predicted accurately enough by using the Reynolds-Averaged Navier-Stokes equations (RANS). Large- Eddy Simulation (LES) resolves the largest and thus most important turbulent eddies and models only the small-scale motions which are more universal than the large eddies and thus easier to model. Therefore, LES is expected to be more suitable for this kind of simulations although it is computationally more expensive than the RANS approach. With the fast development of computers and open-source CFD software during the recent years, the application of LES toward atmospheric flow is becoming increasingly common nowadays. The aim of the work is to simulate atmospheric flows over realistic and complex terrains by means of LES. Evaluation of potential in-land wind park locations will be the main application for these simulations. Development of the LES methodology to simulate the atmospheric flows over realistic terrains is reported in the thesis. The work also aims at validating the LES methodology at a real scale. In the thesis, LES are carried out for flow problems ranging from basic channel flows to real atmospheric flows over one of the most recent real-life complex terrain problems, the Bolund hill. All the simulations reported in the thesis are carried out using a new OpenFOAM® -based LES solver. The solver uses the 4th order time-accurate Runge-Kutta scheme and a fractional step method. Moreover, development of the LES methodology includes special attention to two boundary conditions: the upstream (inflow) and wall boundary conditions. The upstream boundary condition is generated by using the so-called recycling technique, in which the instantaneous flow properties are sampled on aplane downstream of the inlet and mapped back to the inlet at each time step. This technique develops the upstream boundary-layer flow together with the inflow turbulence without using any precursor simulation and thus within a single computational domain. The roughness of the terrain surface is modeled by implementing a new wall function into OpenFOAM® during the thesis work. Both, the recycling method and the newly implemented wall function, are validated for the channel flows at relatively high Reynolds number before applying them to the atmospheric flow applications. After validating the LES model over simple flows, the simulations are carried out for atmospheric boundary-layer flows over two types of hills: first, two-dimensional wind-tunnel hill profiles and second, the Bolund hill located in Roskilde Fjord, Denmark. For the twodimensional wind-tunnel hills, the study focuses on the overall flow behavior as a function of the hill slope. Moreover, the simulations are repeated using another wall function suitable for smooth surfaces, which already existed in OpenFOAM® , in order to study the sensitivity of the flow to the surface roughness in ABL flows. The simulated results obtained using the two wall functions are compared against the wind-tunnel measurements. It is shown that LES using the implemented wall function produces overall satisfactory results on the turbulent flow over the two-dimensional hills. The prediction of the flow separation and reattachment-length for the steeper hill is closer to the measurements than the other numerical studies reported in the past for the same hill geometry. The field measurement campaign performed over the Bolund hill provides the most recent field-experiment dataset for the mean flow and the turbulence properties. A number of research groups have simulated the wind flows over the Bolund hill. Due to the challenging features of the hill such as the almost vertical hill slope, it is considered as an ideal experimental test case for validating micro-scale CFD models for wind energy applications. In this work, the simulated results obtained for two wind directions are compared against the field measurements. It is shown that the present LES can reproduce the complex turbulent wind flow structures over a complicated terrain such as the Bolund hill. Especially, the present LES results show the best prediction of the turbulent kinetic energy with an average error of 24.1%, which is a 43% smaller than any other model results reported in the past for the Bolund case. Finally, the validated LES methodology is demonstrated to simulate the wind flow over the existing Muukko wind farm located in South-Eastern Finland. The simulation is carried out only for one wind direction and the results on the instantaneous and time-averaged wind speeds are briefly reported. The demonstration case is followed by discussions on the practical aspects of LES for the wind resource assessment over a realistic inland wind farm.
Resumo:
Wind energy is one of the most promising and fast growing sector of energy production. Wind is ecologically friendly and relatively cheap energy resource available for development in practically all corners of the world (where only the wind blows). Today wind power gained broad development in the Scandinavian countries. Three important challenges concerning sustainable development, i.e. energy security, climate change and energy access make a compelling case for large-scale utilization of wind energy. In Finland, according to the climate and energy strategy, accepted in 2008, the total consumption of electricity generated by means of wind farms by 2020, should reach 6 - 7% of total consumption in the country [1]. The main challenges associated with wind energy production are harsh operational conditions that often accompany the turbine operation in the climatic conditions of the north and poor accessibility for maintenance and service. One of the major problems that require a solution is the icing of turbine structures. Icing reduces the performance of wind turbines, which in the conditions of a long cold period, can significantly affect the reliability of power supply. In order to predict and control power performance, the process of ice accretion has to be carefully tracked. There are two ways to detect icing – directly or indirectly. The first way applies to the special ice detection instruments. The second one is using indirect characteristics of turbine performance. One of such indirect methods for ice detection and power loss estimation has been proposed and used in this paper. The results were compared to the results directly gained from the ice sensors. The data used was measured in Muukko wind farm, southeast Finland during a project 'Wind power in cold climate and complex terrain'. The project was carried out in 9/2013 - 8/2015 with the partners Lappeenranta university of technology, Alstom renovables España S.L., TuuliMuukko, and TuuliSaimaa.
Resumo:
Uusiutuva energia elää voimakasta kasvukautta ja hallituksen tekemien tukipäätösten vuoksi tuulivoimaa tullaan rakentamaan huomattavasti lisää tulevien vuosien aikana. Tuuligeneraattorin siipien huolto- ja tarkastustoiminta on uusi ja kehittyvä toimiala. Tämä diplomityö onkin tehty oppaaksi helpottamaan tuulivoimaa omistavien, rakentavien, tai tuulivoimapuiston perustamista harkitsevien tahojen huoltosuunnitelmien tekemistä varten. Diplomityössä käydään läpi yleisimmät tuulivoimaloiden lapojen vikaantu-miset, sekä työskentelytavat ja käytettävät laitteistot voimaloiden lapojen huoltoja ja tarkastuksia tehtäessä.
Resumo:
Tutkielman tavoitteena on toimia katsauksena siitä, minkä kaltainen kokonaisprosessi tuulipuistohankkeiden ympäristövaikutusten arviointi Suomessa tällä hetkellä on. Käsiteltävät lupa- ja kaavoitusprosessit ovat ennen hankkeen varsinaista rakennustyötä tehtäviä selvityksiä. Näiden asioiden tarkasteleminen on tärkeää, koska on arvioitu, että Suomessa on huomattava määrä tuulivoimahankkeita jumissa hallinnollisten esteiden takia. Eri prosesseja on selvitetty viranomaisille tarkoitettujen oppaiden ja ohjeiden avulla. Selvityksistä huomataan, että eri prosesseissa tarkasteltavat asiat ovat välttämättömiä, mutta niiden muodostama kokonaisprosessi on kankea ja hidas. Tutkielmassa on ehdotuksia siitä, miten kokonaisprosessia voidaan parantaa. Lisäksi parannusehdotuksia on esitetty muutamalle yksittäiselle selvitysprosessille. Parannusehdotukset perustuvat Ruotsissa ja Tanskassa käytettävien prosessien eroavaisuuksiin Suomen vastaaviin nähden sekä työn tekijän omiin huomioihin.
Resumo:
The economical competitiveness of various power plant alternatives is compared. The comparison comprises merely electricity producing power plants. Combined heat and power (CHP) producing power will cover part of the future power deficit in Finland, but also condensing power plants for base load production will be needed. The following types of power plants are studied: nuclear power plant, combined cycle gas turbine plant, coal-fired condensing power plant, peat-fired condensing power plant, wood-fired condensing power plant and wind power plant. The calculations are carried out by using the annuity method with a real interest rate of 5 % per annum and with a fixed price level as of January 2008. With the annual peak load utilization time of 8000 hours (corresponding to a load factor of 91,3 %) the production costs would be for nuclear electricity 35,0 €/MWh, for gas based electricity 59,2 €/MWh and for coal based electricity 64,4 €/MWh, when using a price of 23 €/tonCO2 for the carbon dioxide emission trading. Without emission trading the production cost of gas electricity is 51,2 €/MWh and that of coal electricity 45,7 €/MWh and nuclear remains the same (35,0 €/MWh) In order to study the impact of changes in the input data, a sensitivity analysis has been carried out. It reveals that the advantage of the nuclear power is quite clear. E.g. the nuclear electricity is rather insensitive to the changes of nuclear fuel price, whereas for natural gas alternative the rising trend of gas price causes the greatest risk. Furthermore, increase of emission trading price improves the competitiveness of the nuclear alternative. The competitiveness and payback of the nuclear power investment is studied also as such by using various electricity market prices for determining the revenues generated by the investment. The profitability of the investment is excellent, if the market price of electricity is 50 €/MWh or more.
Resumo:
Euroopan Unionin asettamat tavoitteet uusiutuvien energialähteiden lisäämiselle sähköntuotannossa ovat johtamassa tuulivoimalla tuotetun sähkön merkittävään kasvamiseen. Suomeenkin suunnitellaan suuria, useista kymmenistä tuulivoimaloista koostuvia tuulivoimapuistoja niin maalle kuin merelle. Tuulivoimapuiston suunnittelu on kokonaisuudessaan pitkä prosessi, johon sisältyy sähköteknisen suunnittelun lisäksi myös ympäristövaikutusten arviointiohjelma ja erinäiset lupa-asiat. Tämän diplomityön tavoitteena on kehittää menetelmiä, joiden avulla suurten tuulivoimapuistojen keskijänniteverkon teknistaloudellinen suunnittelu helpottuisi. Tuulivoimapuiston keskijänniteverkon parhaan teknistaloudellisen ratkaisun löytyminen riippuu useista muuttujista. Työssä kehitettiin laskentamallipohja, jonka avulla voidaan helposti ja nopeasti tarkastella erilaisten ratkaisuiden vaikutusta kokonaisuuteen. Tavoite on optimoida teknistaloudellisessa mielessä koko tuulivoimapuiston sisäinen keskijänniteverkko. Kehitettyä laskentamallipohjaa hyödynnettiin esimerkkiprojektina olleen tuulivoimapuiston keskijänniteverkon suunnittelussa. Mallin avulla voidaan laskea nopeasti verkon kustannukset koko pitoajalta. Kustannuslaskelmissa otetaan huomioon investointi-, häviö- ja keskeytyskustannukset.
Resumo:
The aim of this master’s thesis was to document the present state and to create a development plan for Moventas Wind’s cost accounting. The current cost accounting system was evaluated and most fundamental problems were chosen as areas of focus in development work. The development plan includes both short- and long-term development proposals for problems identified. This report presents two alternative models for product costing. Benchmarking of cost accounting practices and modern cost accounting theories were used in development of cost accounting. It was found that the current cost accounting system functions quite well and the adjustments in unit cost rate calculation have only a minor influence on costs of goods sold. An OEE-based standard cycle concept was also developed and it was found that the implementation of this new system is worthwhile in the long-term.
Resumo:
The goal of the master's thesis is a detailed research of the technical wind energy potential in Russian Federation: the distribution of the potential all over the territory of the country and the possibility of the application of the potential for power supply of various objects. The main attention of the thesis is devoted to the assessment of wind energy resources (potential) of Russian Federation, both for the territory of country in whole and for every region. Theoretical basic wind energy concepts and the scheme of transformation of kinetic energy of a wind into electric energy by modern wind turbines are given in the work. Also the costs of energy, stimuli of development of wind-engineering and obstacles which impact the industry development are analyzed. The review of existent and projected wind power plants in Russia is carried out.
Resumo:
The energy reform, which is happening all over the world, is caused by the common concern of the future of the humankind in our shared planet. In order to keep the effects of the global warming inside of a certain limit, the use of fossil fuels must be reduced. The marginal costs of the renewable sources, RES are quite high, since they are new technology. In order to induce the implementation of RES to the power grid and lower the marginal costs, subsidies were developed in order to make the use of RES more profitable. From the RES perspective the current market is developed to favor conventional generation, which mainly uses fossil fuels. Intermittent generation, like wind power, is penalized in the electricity market since it is intermittent and thus diffi-cult to control. Therefore, the need of regulation and thus the regulation costs to the producer differ, depending on what kind of generation market participant owns. In this thesis it is studied if there is a way for market participant, who has wind power to use the special characteristics of electricity market Nord Pool and thus reach the gap between conventional generation and the intermittent generation only by placing bids to the market. Thus, an optimal bid is introduced, which purpose is to minimize the regulation costs and thus lower the marginal costs of wind power. In order to make real life simulations in Nord Pool, a wind power forecast model was created. The simulations were done in years 2009 and 2010 by using a real wind power data provided by Hyötytuuli, market data from Nord Pool and wind forecast data provided by Finnish Meteorological Institute. The optimal bid needs probability intervals and therefore the methodology to create probability distributions is introduced in this thesis. In the end of the thesis it is shown that the optimal bidding improves the position of wind power producer in the electricity market.
Resumo:
Diplomityön tavoitteena oli selvittää tuulivoimatuotannon epäsymmetrisyyden vaikutuksia liiketoiminnalle. Tarkastelun kohteena oli tuotetun energian sekä tuulivoimatuotannosta maksettavan korvauksen keskinäinen epäsymmetria. Työssä asiaa tarkasteltiin esimerkki tuulivoimalaitoksen avulla. Tarkastelujaksoksi työssä rajattiin ajanjakso 2014 tammikuusta vuoden 2015 kesäkuuhun. Tämän lisäksi työssä perehdyttiin tuotetun sähkön hinnan suojausstrategioihin, tuotannon häviötekijöihin sekä tasesähkön aiheuttamien kustannusten kehitykseen. Työn tulosten perusteella tuulivoimaliiketoiminta tulee kokemaan epävakauden lisääntymistä. Tuulivoimatuotannon epävarmuus johtuu heikosta pitkän aikavälin ennustettavuudesta, joka koostuu aikaisemmin mainituista tuotannon ja sähkön markkinahinnan välisestä epäsymmetrisyydestä. Työssä käsitellään tuulivoimatuotannon ajallista vaihtelua, joka ilmentää hyvin tuulivoimatuotannon perimmäistä olemusta. Työn lopputuloksena saatiin kuvaus tuotantojen ajallisesta jakautuneisuudesta, joiden pohjalta yritys voi suunnitella suojausstrategioita työssä esiteltyjen johdannaistuotteiden avulla. Edellisten loppupäätelmien lisäksi työssä perehdyttiin häviöiden sekä tasesähkökustannusten taloudellisiin vaikutuksiin sekä kehityssuuntiin tulevaisuudessa.
Resumo:
With growing demand for liquefied natural gas (LNG) and liquid transportation fuels, and concerns about climate change and causes of greenhouse gas emissions, this master’s thesis introduces a new value chain design for LNG and transportation fuels and respective fundamental business cases based on hybrid PV-Wind power plants. The value chains are composed of renewable electricity (RE) converted by power-to-gas (PtG), gas-to-liquids (GtL) or power-to-liquids (PtL) facilities into SNG (which is finally liquefied into LNG) or synthetic liquid fuels, mainly diesel, respectively. The RE-LNG or RE-diesel are drop-in fuels to the current energy system and can be traded everywhere in the world. The calculations for the hybrid PV-Wind power plants, electrolysis, methanation (H2tSNG), hydrogen-to-liquids (H2tL), GtL and LNG value chain are performed based on both annual full load hours (FLh) and hourly analysis. Results show that the proposed RE-LNG produced in Patagonia, as the study case, is competitive with conventional LNG in Japan for crude oil prices within a minimum price range of about 87 - 145 USD/barrel (20 – 26 USD/MBtu of LNG production cost) and the proposed RE-diesel is competitive with conventional diesel in the European Union (EU) for crude oil prices within a minimum price range of about 79 - 135 USD/barrel (0.44 – 0.75 €/l of diesel production cost), depending on the chosen specific value chain and assumptions for cost of capital, available oxygen sales and CO2 emission costs. RE-LNG or RE-diesel could become competitive with conventional fuels from an economic perspective, while removing environmental concerns. The RE-PtX value chain needs to be located at the best complementing solar and wind sites in the world combined with a de-risking strategy. This could be an opportunity for many countries to satisfy their fuel demand locally. It is also a specific business case for countries with excellent solar and wind resources to export carbon-neutral hydrocarbons, when the decrease in production cost is considerably more than the shipping cost. This is a unique opportunity to export carbon-neutral hydrocarbons around the world where the environmental limitations on conventional hydrocarbons are getting tighter.
Resumo:
Selostus: Tarhattujen sinikettujen vuodenaikainen ja vuorokautinen aktiivisuus