12 resultados para Distribution static compensator (DSTATCOM)
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
In distributed energy production, permanent magnet synchronous generators (PMSG) are often connected to the grid via frequency converters, such as voltage source line converters. The price of the converter may constitute a large part of the costs of a generating set. Some of the permanent magnet synchronous generators with converters and traditional separately excited synchronous generators couldbe replaced by direct-on-line (DOL) non-controlled PMSGs. Small directly networkconnected generators are likely to have large markets in the area of distributed electric energy generation. Typical prime movers could be windmills, watermills and internal combustion engines. DOL PMSGs could also be applied in island networks, such as ships and oil platforms. Also various back-up power generating systems could be carried out with DOL PMSGs. The benefits would be a lower priceof the generating set and the robustness and easy use of the system. The performance of DOL PMSGs is analyzed. The electricity distribution companies have regulations that constrain the design of the generators being connected to the grid. The general guidelines and recommendations are applied in the analysis. By analyzing the results produced by the simulation model for the permanent magnet machine, the guidelines for efficient damper winding parameters for DOL PMSGs are presented. The simulation model is used to simulate grid connections and load transients. The damper winding parameters are calculated by the finite element method (FEM) and determined from experimental measurements. Three-dimensional finite element analysis (3D FEA) is carried out. The results from the simulation model and 3D FEA are compared with practical measurements from two prototype axial flux permanent magnet generators provided with damper windings. The dimensioning of the damper winding parameters is case specific. The damper winding should be dimensioned based on the moment of inertia of the generating set. It is shown that the damper winding has optimal values to reach synchronous operation in the shortest period of time after transient operation. With optimal dimensioning, interferenceon the grid is minimized.
Resumo:
Deregulation of the electricity sector liberated the electricity sale and production for competitive forces while in the network business, electricity transmission and distribution, natural monopoly positions were recognised. Deregulation was accompanied by efficiencyoriented thinking on the whole electricity supply industry. For electricity distribution this meant a transition from a public service towards profit-driven business guided by economic regulation. Regulation is the primary means to enforce societal and other goals in the regulated monopoly sector. The design of economic regulation is concerned with two main attributes; end-customer price and quality of electricity distribution services. Regulation limits the costs of the regulated company but also defines the desired quality of monopoly services. The characteristics of the regulatory framework and the incentives it provides are therefore decisive for the electricity distribution sector. Regulation is not a static factor; changes in the regulatory practices cause discontinuity points, which in turn generate risks. A variety of social and environmental concerns together with technological advancements have emphasised the relevance of quality regulation, which is expected to lead to the large-scale replacement of overhead lines with underground cables. The electricity network construction activity is therefore currently witnessing revolutionary changes in its competitive landscape. In a business characterised by high statutory involvement and a high level of sunk costs, recognising and understanding the regulatory risks becomes a key success factor. As a response, electricity distribution companies have turned into outsourcing to attain efficiency and quality goals. This doctoral thesis addresses the impacts of regulatory risks on electricity network construction, which is a commonly outsourced activity in the electricity distribution network sector. The chosen research approach is characterised as an action analytical research on account of the fact that regulatory risks are greatly dependent on the individual nature of the regulatory regime applied in the electricity distribution sector. The main contribution of this doctoral thesis is to develop a concept for recognising and managing the business risks stemming from economic regulation. The degree of outsourcing in the sector is expected to increase in years to come. The results of the research provide new knowledge to manage the regulatory risks when outsourcing services.
Resumo:
Markus Öst & Mikael Kilpi