34 resultados para Distributed Control Problems

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The increasing power demand and emerging applications drive the design of electrical power converters into modularization. Despite the wide use of modularized power stage structures, the control schemes that are used are often traditional, in other words, centralized. The flexibility and re-usability of these controllers are typically poor. With a dedicated distributed control scheme, the flexibility and re-usability of the system parts, building blocks, can be increased. Only a few distributed control schemes have been introduced for this purpose, but their breakthrough has not yet taken place. A demand for the further development offlexible control schemes for building-block-based applications clearly exists. The control topology, communication, synchronization, and functionality allocationaspects of building-block-based converters are studied in this doctoral thesis. A distributed control scheme that can be easily adapted to building-block-based power converter designs is developed. The example applications are a parallel and series connection of building blocks. The building block that is used in the implementations of both the applications is a commercial off-the-shelf two-level three-phase frequency converter with a custom-designed controller card. The major challenge with the parallel connection of power stages is the synchronization of the building blocks. The effect of synchronization accuracy on the system performance is studied. The functionality allocation and control scheme design are challenging in the seriesconnected multilevel converters, mainly because of the large number of modules. Various multilevel modulation schemes are analyzed with respect to the implementation, and this information is used to develop a flexible control scheme for modular multilevel inverters.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Työn tavoitteena oli kehittää automaattinen optimointijärjestelmä energiayhtiön omistamaan pieneen sähkön- ja lämmöntuotantolaitokseen (CHP-laitos). Optimointitarve perustuu energiayhtiön sähkön hankintaan sähköpörssistä, kaasun hankintahintaan, kohteen paikallisiin sähkö- ja lämpökuormituksiin ja muihin laitoksen talouteen vaikuttaviin tekijöihin. Kehitettävällä optimointijärjestelmällä ontarkoitus tulevaisuudessa hallita useita hajautetun energiantuotannon yksiköitäkeskitetysti. Työssä kehitettiin algoritmi, joka optimoi voimalaitoksen taloutta sähkötehoa säätävillä ajomalleilla ja suoralla sähköteho-ohjeella. Työssä kehitetyn algoritmin tuottamia hyötyjä selvitettiin Harjun oppimiskeskuksen CHP-laitoksen mittaushistoriatiedoilla. CHP-laitosten käytön optimointiin luotiin keskitettyyn laskentaan ja hajautettuun ohjaukseen perustuva järjestelmä. Se ohjaa CHP-laitoksia reaaliaikaisesti ja ennustaa historiatietoihin perustuvalla aikasarjamallilla laitoksen tulevaa käyttöä. Optimointijärjestelmän toimivuus ja saatu hyöty selvitettiin Harjun oppimiskeskuksen CHP-laitoksella vertaamalla mittauksista laskettua toteutunutta hyötyä optimointijärjestelmän laskemaan ennustettuun hyötyyn.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Kansallisten rajojen yli laajentuvat yritykset kohtaavat kasvavia paineita yhtenäistää eri yksiköiden toimintatapoja, prosesseja ja järjestelmiä. Hyvin toteutettuna organisaation sisäinen integrointi voi johtaa tytäryritysten tuottavuuden parantumiseen ja strategisiin mittakaavaetuihin, kun taas huonosti toteutettuna integrointi voi johtaa lisääntyviin konflikteihin ja emoyhtiön kontrollin katoamiseen. Integroinnin kannalta Venäjälle perustettavat tytäryritykset asettavat suuria haasteita. Kasvava ja kehittyvä kansantalous on jatkuvassa muutoksessa kohti edistyneempiä ja tuottavampia toimintamalleja, mutta toisaalta yritystoiminnantaustalla vaikuttaa edelleenkin Neuvostoajan perinnöt, jotka muokkaavat yritysten johtamisrakenteita ja prosesseja. Nämä taustavaikuttajat vaikeuttavat kansainvälisen yrityksen yhtenäistämistä, mutta toisaalta tarjoavat suuria mahdollisuuksia yrityksille, jotka oppivat elämään Venäjän markkinoiden ehdoilla. Tämä tutkimus käyttää apunaan konstruktiivista tutkimustyötä ratkoakseenYIT:n Venäjälle perustettavien yritysten integrointiin liittyviä ongelmia ja mahdollisuuksia. Työn lopputuloksena syntyy oppimiseen pohjautuva integraatiostrategia ja tätä strategiaa tukeva integroinnin johtamisjärjestelmä.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Kiristyvä kansainvälinen kilpailu pakottaa automaatiojärjestelmien valmistajat ottamaan käyttöön uusia menetelmiä, joiden avulla järjestelmien suorituskykyä ja joustavuutta saadaan parannettua. Agenttiteknologiaa on esitetty käytettäväksi olemassa olevien automaatiojärjestelmien kanssa vastaamaan automaatiolle asetettaviin uusiin haasteisiin. Agentit ovat itsenäisiä yhteisöllisiä toimijoita, jotka suorittavat niille ennalta määrättyjä tehtäviä. Ne tarjoavat yhtenäisen kehyksen kehittyneiden toimintojen toteutukselle. Agenttiteknologian avulla automaatiojärjestelmä saadaan toimimaan joustavasti ja vikasietoisesti. Tässä työssä selostetaan agenttiteknologian ajatuksia ja käsitteitä. Lisäksi selvitetään sen soveltuvuutta monimutkaisten ohjausjärjestelmien kehittämiseen ja etsitään käyttökohteita sen soveltamiselle levytehtaassa. Työssä käsitellään myös aatteita, jotka ovat johtaneet agenttiteknologian käyttöön automaatiojärjestelmissä, sekä selostetaan agenttiavusteisen esimerkkisovelluksen rakenne ja testitulokset. Tutkimuksen tuloksena löydettiin useita kohteita agenttiteknologian käytölle levytehtaassa. Esimerkkisovellus osoittaa sen sopivan hyvin kehittyneiden toimintojen toteutukseen automaatiojärjestelmissä.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this project was to introduce a new software product to pulp industry, a new market for case company. An optimization based scheduling tool has been developed to allow pulp operations to better control their production processes and improve both production efficiency and stability. Both the work here and earlier research indicates that there is a potential for savings around 1-5%. All the supporting data is available today coming from distributed control systems, data historians and other existing sources. The pulp mill model together with the scheduler, allows what-if analyses of the impacts and timely feasibility of various external actions such as planned maintenance of any particular mill operation. The visibility gained from the model proves also to be a real benefit. The aim is to satisfy demand and gain extra profit, while achieving the required customer service level. Research effort has been put both in understanding the minimum features needed to satisfy the scheduling requirements in the industry and the overall existence of the market. A qualitative study was constructed to both identify competitive situation and the requirements vs. gaps on the market. It becomes clear that there is no such system on the marketplace today and also that there is room to improve target market overall process efficiency through such planning tool. This thesis also provides better overall understanding of the different processes in this particular industry for the case company.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The energy system of Russia is the world's fourth largest measured by installed power. The largest are that of the the United States of America, China and Japan. After 1990, the electricity consumption decreased as a result of the Russian industry crisis. The vivid economic growth during the latest few years explains the new increase in the demand for energy resources within the State. In 2005 the consumption of electricity achieved the maximum level of 1990 and continues to growth. In the 1980's, the renewal of power facilities was already very slow and practically stopped in the 1990's. At present, the energy system can be very much characterized as outdated, inefficient and uneconomic because of the old equipment, non-effective structure and large losses in the transmission lines. The aim of Russia's energy reform, which was started in 2001, is to achieve a market based energy policy by 2011. This would thus remove the significantly state-controlled monopoly in Russia's energy policy. The reform will stimulateto decrease losses, improve the energy system and employ energy-saving technologies. The Russian energy system today is still based on the use of fossil fuels, and it almost totally ignores the efficient use of renewable sources such as wind, solar, small hydro and biomass, despite of their significant resources in Russia. The main target of this project is to consider opportunities to apply renewable energy production in the North-West Federal Region of Russia to partly solve the above mentioned problems in the energy system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Problems of the designing active magnet bearingcontrol are developed. The estimation controller are designed and applied to a rigid rotor. The mathematical model of the active magnet bearing controller is developed. This mathematical model is realized on a DSP. The results of this realization are analyzed. The conclusions about the digital signal processing are made.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present study was done with two different servo-systems. In the first system, a servo-hydraulic system was identified and then controlled by a fuzzy gainscheduling controller. The second servo-system, an electro-magnetic linear motor in suppressing the mechanical vibration and position tracking of a reference model are studied by using a neural network and an adaptive backstepping controller respectively. Followings are some descriptions of research methods. Electro Hydraulic Servo Systems (EHSS) are commonly used in industry. These kinds of systems are nonlinearin nature and their dynamic equations have several unknown parameters.System identification is a prerequisite to analysis of a dynamic system. One of the most promising novel evolutionary algorithms is the Differential Evolution (DE) for solving global optimization problems. In the study, the DE algorithm is proposed for handling nonlinear constraint functionswith boundary limits of variables to find the best parameters of a servo-hydraulic system with flexible load. The DE guarantees fast speed convergence and accurate solutions regardless the initial conditions of parameters. The control of hydraulic servo-systems has been the focus ofintense research over the past decades. These kinds of systems are nonlinear in nature and generally difficult to control. Since changing system parameters using the same gains will cause overshoot or even loss of system stability. The highly non-linear behaviour of these devices makes them ideal subjects for applying different types of sophisticated controllers. The study is concerned with a second order model reference to positioning control of a flexible load servo-hydraulic system using fuzzy gainscheduling. In the present research, to compensate the lack of dampingin a hydraulic system, an acceleration feedback was used. To compare the results, a pcontroller with feed-forward acceleration and different gains in extension and retraction is used. The design procedure for the controller and experimental results are discussed. The results suggest that using the fuzzy gain-scheduling controller decrease the error of position reference tracking. The second part of research was done on a PermanentMagnet Linear Synchronous Motor (PMLSM). In this study, a recurrent neural network compensator for suppressing mechanical vibration in PMLSM with a flexible load is studied. The linear motor is controlled by a conventional PI velocity controller, and the vibration of the flexible mechanism is suppressed by using a hybrid recurrent neural network. The differential evolution strategy and Kalman filter method are used to avoid the local minimum problem, and estimate the states of system respectively. The proposed control method is firstly designed by using non-linear simulation model built in Matlab Simulink and then implemented in practical test rig. The proposed method works satisfactorily and suppresses the vibration successfully. In the last part of research, a nonlinear load control method is developed and implemented for a PMLSM with a flexible load. The purpose of the controller is to track a flexible load to the desired position reference as fast as possible and without awkward oscillation. The control method is based on an adaptive backstepping algorithm whose stability is ensured by the Lyapunov stability theorem. The states of the system needed in the controller are estimated by using the Kalman filter. The proposed controller is implemented and tested in a linear motor test drive and responses are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Technological development brings more and more complex systems to the consumer markets. The time required for bringing a new product to market is crucial for the competitive edge of a company. Simulation is used as a tool to model these products and their operation before actual live systems are built. The complexity of these systems can easily require large amounts of memory and computing power. Distributed simulation can be used to meet these demands. Distributed simulation has its problems. Diworse, a distributed simulation environment, was used in this study to analyze the different factors that affect the time required for the simulation of a system. Examples of these factors are the simulation algorithm, communication protocols, partitioning of the problem, distributionof the problem, capabilities of the computing and communications equipment and the external load. Offices offer vast amounts of unused capabilities in the formof idle workstations. The use of this computing power for distributed simulation requires the simulation to adapt to a changing load situation. This requires all or part of the simulation work to be removed from a workstation when the owner wishes to use the workstation again. If load balancing is not performed, the simulation suffers from the workstation's reduced performance, which also hampers the owner's work. Operation of load balancing in Diworse is studied and it is shown to perform better than no load balancing, as well as which different approaches for load balancing are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Työn tavoitteena oli kuvata piirilevyvalmistaja Aspocomp Oy:n Espoon tehtaan tämän hetkinen tuotannonohjausperiaate ja tunnistaa siinä esiintyvät puutteet sekä kehittää vaihtoehtoinen tuotannonohjausperiaate piirilevyvalmistukseen. Vaihtoehtoisen ohjausperiaatteen lähtökohtana oli tuotannonohjauksen sopeuttaminen vaativaan ja jatkuvasti muuttuvaan liiketoimintaympäristöön. Työn teoreettinen osa keskittyi tuotannonohjauksen eri lähestymistapoihin. Kirjallisuuskatsauksessa esitetään eri tuotannonohjausperiaatteiden keskeiset sisällöt, jotka muodostavat rungon toimivalle tuotannonohjauskäytännölle. Työn kokeellinen osa keskittyi Espoon piirilevytehtaan tuotannonohjausperiaatteen selvittämiseen. Espoon piirilevytehtaan nykyisessä tuotannonohjausperiaatteessa havaittujen ongelmakohtien ja liiketoimintaympäristön vaatimusten perusteella kehitettiin vaihtoehtoinen tuotannonohjaustapa. Vaihtoehtoisen tuotannonohjaustavan päämääränä oli läpimenoajan lyhentäminen sekä tuotannon parempi hallittavuus. Vaihtoehtoinen toimintamalli tavoitteiden saavuttamiseksi perustuu pullonkaulateoriaan, jossa keskeisin muutos nykyiseen toimintamalliin oli puolivalmisteiden varastointi toimitusajan lyhentämiseksi sekä tuotantovolyymin heilahdusten vaikutusten vähentämiseksi. Työn kokeellisessa osassa ilmeni, että kysynnän muutokset ja kapasiteetin suunnittelun puute aiheuttivat ongelmia piirilevytehtaan tuotannonohjauksessa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Työn tavoitteena oli tutkia uuden tuotannonohjausjärjestelmän ja työprosessin käyttöönottoa maantieteellisesti hajautetussa organisaatiossa. Tavoitteena oli myös laatia malli kuinka mittavat järjestelmäkäyttöönotot tulisi viedä läpi hallitusti. Tutkimuksen teoriaosuus on tehty kirjallisuustukimuksena ja asiantuntijahaastatteluiden pohjalta. Teoriaosuudessa käydään läpi mitkä seikat uuden tuotannonohjausjärjestelmän käyttöönotossa ovat tärkeitä onnistumisen kannalta ja kuinka käyttöönottoprojekti tulisi viedä läpi. Työn empiirisessä osuudessa on analysoitu kuinka järjestelmä otettiin käyttöön kohdeyrityksessä. Empiirinen osa on tehty tarkastelemalla käyttöönottoa ja onnistumista on pohdittu suorittamalla käyttäjäkysely. Järjestelmien käyttöönotot epäonnistuvat useassa tapauksessa. Nämä epäonnistumiset johtuvat usein käyttöönotto-organisaation kokemattomuudesta viedä läpi monimutkaisia projekteja, suunnittelun puutteesta, huonosta sitoutumisesta muutokseen tai riittämättömästä resurssien allokoinnista. Ennalta suunnittelu, suunnitelmien pitävyyden tarkastaminen ja mahdollisesti muuttaminen käyttöönoton edetessä ovat avaimia onnistumiseen. Kohdeyrityksessä otetaan erilaisia järjestelmiä käyttöön ajoittain. Nämä käyttöönotot eivät ole kuitenkaan aina sujuneet halutulla tavalla. Tutkimus pyrkii luomaan vaiheittaisen mallin muutokseen valmistautumisesta, suunnittelusta, muutoksen kouluttamisesta, järjestelmän integroimisesta muihin järjestelmiin, muutoksen läpivientiin ja käyttöönoton onnistumisen mittaamisesta. Tutkimuksessa käsitellään uuden projektinhallintajärjestelmän käyttöönoton problematiikan lisäksi uuden työprosessin käyttöönottoa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tämän työn tarkoituksena on koota yhteen selluprosessin mittausongelmat ja mahdolliset mittaustekniikat ongelmien ratkaisemiseksi. Pääpaino on online-mittaustekniikoissa. Työ koostuu kolmesta osasta. Ensimmäinen osa on kirjallisuustyö, jossa esitellään nykyaikaisen selluprosessin perusmittaukset ja säätötarpeet. Mukana on koko kuitulinja puunkäsittelystä valkaisuun ja kemikaalikierto: haihduttamo, soodakattila, kaustistamo ja meesauuni. Toisessa osassa mittausongelmat ja mahdolliset mittaustekniikat on koottu yhteen ”tiekartaksi”. Tiedot on koottu vierailemalla kolmella suomalaisella sellutehtaalla ja haastattelemalla laitetekniikka- ja mittaustekniikka-asiantuntijoita. Prosessikemian paremmalle ymmärtämiselle näyttää haastattelun perusteella olevan tarvetta, minkä vuoksi konsentraatiomittaukset on valittu jatkotutkimuskohteeksi. Viimeisessä osassa esitellään mahdollisia mittaustekniikoita konsentraatiomittausten ratkaisemiseksi. Valitut tekniikat ovat lähi-infrapunatekniikka (NIR), fourier-muunnosinfrapunatekniikka (FTIR), online-kapillaarielektroforeesi (CE) ja laserindusoitu plasmaemissiospektroskopia (LIPS). Kaikkia tekniikoita voi käyttää online-kytkettyinä prosessikehitystyökaluina. Kehityskustannukset on arvioitu säätöön kytketylle online-laitteelle. Kehityskustannukset vaihtelevat nollasta miestyövuodesta FTIR-tekniikalle viiteen miestyövuoteen CE-laitteelle; kehityskustannukset riippuvat tekniikan kehitysasteesta ja valmiusasteesta tietyn ongelman ratkaisuun. Työn viimeisessä osassa arvioidaan myös yhden mittausongelman – pesuhäviömittauksen – ratkaisemisen teknis-taloudellista kannattavuutta. Ligniinipitoisuus kuvaisi nykyisiä mittauksia paremmin todellista pesuhäviötä. Nykyään mitataan joko natrium- tai COD-pesuhäviötä. Ligniinipitoisuutta voidaan mitata UV-absorptiotekniikalla. Myös CE-laitetta voitaisiin käyttää pesuhäviön mittauksessa ainakin prosessikehitysvaiheessa. Taloudellinen tarkastelu pohjautuu moniin yksinkertaistuksiin ja se ei sovellu suoraan investointipäätösten tueksi. Parempi mittaus- ja säätöjärjestelmä voisi vakauttaa pesemön ajoa. Investointi ajoa vakauttavaan järjestelmään on kannattavaa, jos todellinen ajotilanne on tarpeeksi kaukana kustannusminimistä tai jos pesurin ajo heilahtelee eli pesuhäviön keskihajonta on suuri. 50 000 € maksavalle mittaus- ja säätöjärjestelmälle saadaan alle 0,5 vuoden takaisinmaksuaika epävakaassa ajossa, jos COD-pesuhäviön vaihteluväli on 5,2 – 11,6 kg/odt asetusarvon ollessa 8,4 kg/odt. Laimennuskerroin vaihtelee tällöin välillä 1,7 – 3,6 m3/odt asetusarvon ollessa 2,5 m3/odt.