2 resultados para City planning -- Ontario -- Grantham (Township)

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

40.00% 40.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the 2000’s Finland suffered from storms that caused long outages in electricity distribution, longest up to two weeks. These major disturbances increased the importance of supply security. In 2013 new Electricity Market Act was announced. It defined maximum duration for outages, 6 h for city plan areas and 36 h for other areas. The aim for this work is to determine required major disturbance proof level for a study area and find tools for prioritizing overhead lines for cabling renovation to improve supply security. Three prioritization methods were chosen to be studied: A: prioritization line sections by customer outage costs they cause, B: maximizing customers major disturbance proof network and C: minimizing excavation costs in medium voltage network. Profitability calculations showed that prioritization method A was the most profitable and C had the weakest profitability. The prioritization method C drove renovation into unreasonable locations in the study area in reliability point of view. Therefore universal rule prioritization methods couldn’t be made from the prioritization methods. This led to the conclusion that every renewing area need to be evaluated in a case by case basis.