8 resultados para BIOTA FUNCTIONAL GRADIENT PROJECT

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research topic of the work is: “Factors of innovation creation within functionally heterogeneous project teams”. The research question is “What are the factors of innovation creation within functionally heterogeneous project teams?” The subject of this research is to explore the teams of projects, aimed at creating innovations, and understand how innovation is generated through project team work within them in term of factors. In line with the purposes of this study, firstly, it was analyzed what factors of such teams’ work are affecting creating innovation positively and negatively on the base of chosen literature and a preliminary conceptional framework was formulated, and secondly, the research of the work of project teams in one of the divisions of ABB company has been done and other factors and interdependencies between them have been added to the conceptional framework. This final conceptional framework constitutes the essense of the work findings and can be used as a tool to analyze the innovation creation process in functionally heterogeneous project teams

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today's business environment has become increasingly unexpected and fast changing because of the global competition. This new environment requires the companies to organize their control differently, e.g. by logistic process thinking. Logistic process thinking in software engineering applies the principles of production process to immaterial products. Processes must be optimized, so that every phase adds value to the customer, and the lead times can be cut shorter to meet the new customer requirements. The purpose of this thesis is to examine and optimize the testing processes of software engineering concentrating on module testing, functional testing and their interface. The concept of logistic process thinking is introduced through production process, value added model and process management. Also theory of testing based on literature is presented, concentrating on module testing and functional testing. The testing processes of the Case Company are presented together with the project models in which they are implemented. The real life practices in module testing and functional testing and their interface are examined through interviews. These practices are analyzed against the processes and the testing theory, through which ideas for optimizing the testing process are introduced. The project world of the Case Company is also introduced together with two example testing projects in different life cycle phases. The examples give a view of how much effort of the project is put in different types of testing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Työssä on tutkittu sähkösuunnittelun projektityön hallintaa ja kehittämistä. Tavoitteena oli löytää ongelmia ja pyrkiä korjaamaan niitä, jotta suunnittelu olisi mahdollisimman toimivaa. Tutkimus perustuu kirjallisuuteen ja haastatteluihin. Työssä perehdytään kirjallisuuden avulla projektin peruskäsitteisiin ja hallintaan sekä sähkösuunnittelun projektin yleiseen toteutukseen. Haastattelujen avulla on selvitetty tämän hetkistä tilannetta sähkösuunnitteluprojektin hallinnasta ja siihen liittyvistä ongelmista Pöyryn Kouvolan konttorissa. Työn tuloksena on selvitetty merkittävimpiä ongelmia, jotka esiintyvät sähkösuunnitteluprojektissa. Työ keskittyy pääosin sähkösuunnitteluprojektin hallinnallisiin ongelmiin ja niiden toteutukseen. Kirjallisuuden ja haastattelujen pohjalta on koottu ohjeita sähkösuunnittelun projektinhallintaan

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Business process improvement is a common approach in increasing the effectiveness of an organization. It can be seen as an effort to increase coordination between units. Process improvement has proved to be challenging, and most management consultation firms facilitate organizations in this kind of initiatives. Cross-functional improvement is one of the main areas for internal consultants as well. However, the needs, challenges and means of cross-functional help have been rarely discussed in the literature. The objective of this thesis is on one hand to present a conceptual and descriptive framework to help understand the challenges of facilitating coordination improvement efforts in cross-functional improvement programs, and on the other hand to develop and test feasible solutions for some facilitation situations. The research questions are: 1. Why and in what kind of situations do organizations need help in developing coordination in cross-functional processes? 2. How can a facilitator help organizations in improving coordination to develop cross-functional processes? The study consists of two parts. The first part is an overview of the dissertation, and the second part comprises six research publications. The theoretical background for the study are the differentiation causing challenges in cross-functional settings, the coordination needed to improve processes, change management principles, methods and tools, and consultation practises. Three of the publications introduce tools for helping in developing prerequisites, planning responsibilities and supporting learning during the cross-functional program. The three other papers present frameworks to help understand and analyse the improvement situation. The main methodological approaches used in this study are design science research, action research and case research. The research data has been collected from ten cases representing different kinds of organizations, processes and developing situations. The data has been collected mainly by observation, semi-structured interviews and questionnaires. The research contributes to the rare literature combining coordination theories and process improvement practises. It also provides additional understanding of a holistic point of view in process improvement situations. The most important contribution is the addition to the theories of facilitating change in process improvement situations. From the managerial point of view, this study gives advice to managers and consultants in planning and executing cross-functional programs. The main factors increasing the need for facilitation are the challenges for differentiation, challenges of organizational change in general, and the novelty of initiatives and improvement practices concerning process development. Organizations need help in creating the prerequisites to change, in planning initiatives, easing conflict management and collaboration between groups, as well as supporting the learning of cross-functional improvement. The main challenges of facilitation are combining the different roles as a consultant, maintaining the ownership for the improvement project with the client, and supporting learning in the client organization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Inorganic pyrophosphatases (PPases) are enzymes that hydrolyze pyrophosphate (PPi)which is produced as a byproduct in many important growth related processes e.g. in the biosynthesis of DNA, proteins and lipids. PPases can be either soluble or membranebound. Membrane-bound PPases (mPPases) are ion transporters that couple the energy released during PPi hydrolysis to Na+ or H+ transport. When I started the project, only three Na+-transporting mPPases were known to exist. In this study, I aimed to confirm if Na+-transport is a common function of mPPases. Furthermore, the amino acid residues responsible for determining the transporter specificity were unknown. I constructed a phylogenetic tree for mPPases and selected the representative bacterial and archaeal mPPases to be investigated. I expressed different prokaryotic mPPases in Escherichia coli, isolated these as inverted membrane vesicles and characterized their functions. In the first project I identified four new Na+-PPases, two K+-dependent H+-PPases and one K+-independent mPPase. The residues determining the transporter specificity were identified by site-directed mutagenesis. I showed that the conserved glutamate residues are important for specificity, though are not the only residues that influence it. This research clarified the ion transport specificities throughout the mPPase phylogenetic tree, and revealed that Na+ transport is a widespread function of mPPases. In addition, it became clear that the transporter specificity can be predicted from the amino acid sequence in combination with a phylogenetic analysis. In the second project, I identified a novel class of mPPases, which is capable of transporting both Na+ and H+ ions and is mainly found in bacteria of the human gastrointestinal tract. The physiological role of these novel enzymes may be to help the bacteria survive in the demanding conditions of the host. In the third project, I characterized the Chlorobium limicola Na+-PPase and found that this and related mPPases are able to transport H+ ions at subphysiological Na+ concentrations. In addition, the H+-transport activity was shown to be a common function of all studied Na+-PPases at low Na+ concentrations. I observed that mutating gate-lysine to asparagine eliminated the H+ but not the Na+ ion transport function, indicating the important role of the residue in the transport of H+. In the fourth project, I characterized the unknown and evolutionary divergent mPPase clade of the phylogenetic tree. The enzymes belonging to this clade are able to transport H+ ions and, based on their sequence, were expected to be K+- and Na+-independent. The sequences of membrane-bound PPase are usually highly conserved, but the enzymes belonging to this clade are more divergent and usually contain 100−150 extra amino acid residues compared to other known mPPases. Despite the vast sequence differences, these mPPases have the full set of important residues and, surprisingly, are regulated by Na+ and K+ ions. These enzymes are mainly of bacterial origin.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Process management refers to improving the key functions of a company. The main functions of the case company - project management, procurement, finance, and human resource - use their own separate systems. The case company is in the process of changing its software. Different functions will use the same system in the future. This software change causes changes in some of the company’s processes. Project cash flow forecasting process is one of the changing processes. Cash flow forecasting ensures the sufficiency of money and prepares for possible changes in the future. This will help to ensure the company’s viability. The purpose of the research is to describe a new project cash flow forecasting process. In addition, the aim is to analyze the impacts of the process change, with regard to the project control department’s workload and resources through the process measurement, and how the impacts take the department’s future operations into account. The research is based on process management. Processes, their descriptions, and the way the process management uses the information, are discussed in the theory part of this research. The theory part is based on literature and articles. Project cash flow and forecasting-related benefits are also discussed. After this, the project cash flow forecasting as-is and to-be processes are described by utilizing information, obtained from the theoretical part, as well as the know-how of the project control department’s personnel. Written descriptions and cross-functional flowcharts are used for descriptions. Process measurement is based on interviews with the personnel – mainly cost controllers and department managers. The process change and the integration of two processes will allow work time for other things, for example, analysis of costs. In addition to the quality of the cash flow information will improve compared to the as-is process. Analyzing the department’s other main processes, department’s roles, and their responsibilities should be checked and redesigned. This way, there will be an opportunity to achieve the best possible efficiency and cost savings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The study develops an approach that tries to validate software functionality to work systems needs in SMEs. The formulated approach is constructed by using a SAAS based software i.e., work collaboration service (WCS), and SMEs as the elements of study. Where the WCS’s functionality is qualified to the collaboration needs that exist in operational and project work within SMEs. For this research constructivist approach and case study method is selected because the nature of the current study requires an in depth study of the work collaboration service as well as a detailed study of the work systems within different enterprises. Four different companies are selected in which fourteen interviews are conducted to gather data pertaining. The work systems method and framework are used as a central part of the approach to collect, analyze and interpret the enterprises work systems model and the underlying collaboration needs on operational and project work. On the other hand, the functional model of the WCS and its functionality is determined from functional model analysis, software testing, documentation and meetings with the service vendor. The enterprise work system model and the WCS model are compared to reveal how work progression differs between the two and make visible unaddressed stages of work progression. The WCS functionality is compared to work systems collaboration needs to ascertain if the service will suffice the needs of the project and operational work under study. The unaddressed needs provide opportunities to improve the functionality of the service for better conformity to the needs of enterprise and work. The results revealed that the functional models actually differed in how operational and project work progressed within the stages. WCS shared similar stages of work progression apart from the stages of identification and acceptance, and progress and completion stages were only partially addressed. Conclusion is that the identified unaddressed needs such as, single point of reference, SLA and OLA inclusion etc., should be implemented or improved within the WCS at appropriate stages of work to gain better compliance of the service to the needs of the enterprise an work itself. The developed approach can hence be used to carry out similar analysis for the conformance of pre-built software functionality to work system needs with SMEs.