107 resultados para Distribution network planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis aims to redesign the supply chain system in an automotive industry in order to obtain space reduction in the inventory by using tailored logistics network. The redesigning process by tailored supply chain will combine all possible shipment methods including direct shipment, milk-run, milk-run via distribution center and Kanban delivery. The current supply chain system in Nissan goes rather well when the production volume is in moderate level. However, when the production volume is high, there is a capacity problem in the warehouse to accommodate all delivered parts from suppliers. Hence, the optimization of supply chain system is needed in order to obtain efficient logistics process and effective inventory consumption. The study will use primary data for both qualitative and quantitative approach as the research methods. Qualitative data will be collected by conducting interviews with people related to procurement and inventory control. Quantitative data consists of list of suppliers with their condition in several parameters which will be evaluated and analyzed by using scoring method to assign the most suitable transportation network to each suppliers for improvement of inventory reduction in a cost efficient manner.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increasingly growing share of distributed generation in the whole electrical power system’s generating system is currently a worldwide tendency, driven by several factors, encircling mainly difficulties in refinement of megalopolises’ distribution networks and its maintenance; widening environmental concerns adding to both energy efficiency approaches and installation of renewable sources based generation, inherently distributed; increased power quality and reliability needs; progress in IT field, making implementable harmonization of needs and interests of different-energy-type generators and consumers. At this stage, the volume, formed by system-interconnected distributed generation facilities, have reached the level of causing broad impact toward system operation under emergency and post-emergency conditions in several EU countries, thus previously implementable approach of their preliminary tripping in case of a fault, preventing generating equipment damage and disoperation of relay protection and automation, is not applicable any more. Adding to the preceding, withstand capability and transient electromechanical stability of generating technologies, interconnecting in proximity of load nodes, enhanced significantly since the moment Low Voltage Ride-Through regulations, followed by techniques, were introduced in Grid Codes. Both aspects leads to relay protection and auto-reclosing operation in presence of distributed generation generally connected after grid planning and construction phases. This paper proposes solutions to the emerging need to ensure correct operation of the equipment in question with least possible grid refinements, distinctively for every type of distributed generation technology achieved its technical maturity to date and network’s protection. New generating technologies are equivalented from the perspective of representation in calculation of initial steady-state short-circuit current used to dimension current-sensing relay protection, and widely adopted short-circuit calculation practices, as IEC 60909 and VDE 0102. The phenomenon of unintentional islanding, influencing auto-reclosing, is addressed, and protection schemes used to eliminate an sustained island are listed and characterized by reliability and implementation related factors, whereas also forming a crucial aspect of realization of the proposed protection operation relieving measures.