79 resultados para Distributed power generation
Resumo:
The main objective of the study was to define the methodology for assessing the limits for application island grids instead of interconnecting with existing grid infrastructure. The model for simulation of grid extension distance and levelised cost of electricity has been developed and validated by the case study in Finland. Thereafter, sensitivities of the application limits were examined with the respect to operational environment, load conditions, supply security and geographical location. Finally, recommendations for the small-scale rural electrification projects in the market economy environment have been proposed.
Resumo:
Liberalization of electricity markets has resulted in a competed Nordic electricity market, in which electricity retailers play a key role as electricity suppliers, market intermediaries, and service providers. Although these roles may remain unchanged in the near future, the retailers’ operation may change fundamentally as a result of the emerging smart grid environment. Especially the increasing amount of distributed energy resources (DER), and improving opportunities for their control, are reshaping the operating environment of the retailers. This requires that the retailers’ operation models are developed to match the operating environment, in which the active use of DER plays a major role. Electricity retailers have a clientele, and they operate actively in the electricity markets, which makes them a natural market party to offer new services for end-users aiming at an efficient and market-based use of DER. From the retailer’s point of view, the active use of DER can provide means to adapt the operation to meet the challenges posed by the smart grid environment, and to pursue the ultimate objective of the retailer, which is to maximize the profit of operation. This doctoral dissertation introduces a methodology for the comprehensive use of DER in an electricity retailer’s short-term profit optimization that covers operation in a variety of marketplaces including day-ahead, intra-day, and reserve markets. The analysis results provide data of the key profit-making opportunities and the risks associated with different types of DER use. Therefore, the methodology may serve as an efficient tool for an experienced operator in the planning of the optimal market-based DER use. The key contributions of this doctoral dissertation lie in the analysis and development of the model that allows the retailer to benefit from profit-making opportunities brought by the use of DER in different marketplaces, but also to manage the major risks involved in the active use of DER. In addition, the dissertation introduces an analysis of the economic potential of DER control actions in different marketplaces including the day-ahead Elspot market, balancing power market, and the hourly market of Frequency Containment Reserve for Disturbances (FCR-D).
Resumo:
Increasingly growing share of distributed generation in the whole electrical power system’s generating system is currently a worldwide tendency, driven by several factors, encircling mainly difficulties in refinement of megalopolises’ distribution networks and its maintenance; widening environmental concerns adding to both energy efficiency approaches and installation of renewable sources based generation, inherently distributed; increased power quality and reliability needs; progress in IT field, making implementable harmonization of needs and interests of different-energy-type generators and consumers. At this stage, the volume, formed by system-interconnected distributed generation facilities, have reached the level of causing broad impact toward system operation under emergency and post-emergency conditions in several EU countries, thus previously implementable approach of their preliminary tripping in case of a fault, preventing generating equipment damage and disoperation of relay protection and automation, is not applicable any more. Adding to the preceding, withstand capability and transient electromechanical stability of generating technologies, interconnecting in proximity of load nodes, enhanced significantly since the moment Low Voltage Ride-Through regulations, followed by techniques, were introduced in Grid Codes. Both aspects leads to relay protection and auto-reclosing operation in presence of distributed generation generally connected after grid planning and construction phases. This paper proposes solutions to the emerging need to ensure correct operation of the equipment in question with least possible grid refinements, distinctively for every type of distributed generation technology achieved its technical maturity to date and network’s protection. New generating technologies are equivalented from the perspective of representation in calculation of initial steady-state short-circuit current used to dimension current-sensing relay protection, and widely adopted short-circuit calculation practices, as IEC 60909 and VDE 0102. The phenomenon of unintentional islanding, influencing auto-reclosing, is addressed, and protection schemes used to eliminate an sustained island are listed and characterized by reliability and implementation related factors, whereas also forming a crucial aspect of realization of the proposed protection operation relieving measures.
Resumo:
Russia approved ambitious reform plan for the electricity sector in 2001 including privatisation of the country’s huge thermal generation assets. So far the sector had suffered from power shortages, aging infrastructure, substantial electricity losses, and weak productivity and profitability numbers. There was obvious need for foreign investments and technologies. The reform was rather successful; the generation assets were privatised in auctions in 2007-2008 and three European energy companies, E.On, Enel and Fortum, invested in and obtained together over 10% of the Russian production assets. The novelty of these foreign investments serves unique object for the study. The political risk is involved in the FDI due to the industry’s social and economic importance. The research’s objective was to identify and analyse the political risk that foreign investors face in the Russian electricity sector. The research had qualitative study method and the empirical data was collected by interviewing. The research’s theoretical framework was based on the existing political risk theories and it focused to understand the Russian government in relation to the country’s stability and define both macro-level and micro-level sources of political risk for the foreign direct investments in the sector. The research concludes that the centralised and obscure political decision-making, economic constriction, high level of governmental control in economy and corruption form the country’s internal macro-level risk sources for the foreign investors in the sector. Additionally the retribution due to the companies’ home country actions, possible violent confrontations at the Russian borders and the currency instability are externally originated risk sources. In the electricity industry there is risk of tightened governmental control and increased regulation and taxation. Similarly the company-level risk sources link to the unreformed heating sector, bargaining with the authorities, diplomatic stress between host and home countries and to companies and government’s divergent perspective for the profit-making. The research stresses the foreign companies’ ability to cope with the characteristics of Russian political environment. In addition to frequent political and market risk assessment, the companies need to focus on currency protection against rouble’s rate fluctuation and actively build good company-citizenship in the country. Good relationship is needed with the Russian political authorities. The political risk identification and the research’s conclusive framework also enable political risk study assessments for other industries in Russia