32 resultados para Wrongful gains
Resumo:
Intelligence from a human source, that is falsely thought to be true, is potentially more harmful than a total lack of it. The veracity assessment of the gathered intelligence is one of the most important phases of the intelligence process. Lie detection and veracity assessment methods have been studied widely but a comprehensive analysis of these methods’ applicability is lacking. There are some problems related to the efficacy of lie detection and veracity assessment. According to a conventional belief an almighty lie detection method, that is almost 100% accurate and suitable for any social encounter, exists. However, scientific studies have shown that this is not the case, and popular approaches are often over simplified. The main research question of this study was: What is the applicability of veracity assessment methods, which are reliable and are based on scientific proof, in terms of the following criteria? o Accuracy, i.e. probability of detecting deception successfully o Ease of Use, i.e. easiness to apply the method correctly o Time Required to apply the method reliably o No Need for Special Equipment o Unobtrusiveness of the method In order to get an answer to the main research question, the following supporting research questions were answered first: What kinds of interviewing and interrogation techniques exist and how could they be used in the intelligence interview context, what kinds of lie detection and veracity assessment methods exist that are reliable and are based on scientific proof and what kind of uncertainty and other limitations are included in these methods? Two major databases, Google Scholar and Science Direct, were used to search and collect existing topic related studies and other papers. After the search phase, the understanding of the existing lie detection and veracity assessment methods was established through a meta-analysis. Multi Criteria Analysis utilizing Analytic Hierarchy Process was conducted to compare scientifically valid lie detection and veracity assessment methods in terms of the assessment criteria. In addition, a field study was arranged to get a firsthand experience of the applicability of different lie detection and veracity assessment methods. The Studied Features of Discourse and the Studied Features of Nonverbal Communication gained the highest ranking in overall applicability. They were assessed to be the easiest and fastest to apply, and to have required temporal and contextual sensitivity. The Plausibility and Inner Logic of the Statement, the Method for Assessing the Credibility of Evidence and the Criteria Based Content Analysis were also found to be useful, but with some limitations. The Discourse Analysis and the Polygraph were assessed to be the least applicable. Results from the field study support these findings. However, it was also discovered that the most applicable methods are not entirely troublefree either. In addition, this study highlighted that three channels of information, Content, Discourse and Nonverbal Communication, can be subjected to veracity assessment methods that are scientifically defensible. There is at least one reliable and applicable veracity assessment method for each of the three channels. All of the methods require disciplined application and a scientific working approach. There are no quick gains if high accuracy and reliability is desired. Since most of the current lie detection studies are concentrated around a scenario, where roughly half of the assessed people are totally truthful and the other half are liars who present a well prepared cover story, it is proposed that in future studies lie detection and veracity assessment methods are tested against partially truthful human sources. This kind of test setup would highlight new challenges and opportunities for the use of existing and widely studied lie detection methods, as well as for the modern ones that are still under development.
Resumo:
The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.