20 resultados para radial-inflow turbine


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wind turbines based on doubly fed induction generators (DFIG) become the most popular solution in high power wind generation industry. While this topology provides great performance with the reduced power rating of power converter, it has more complicated structure in comparison with full-rated topologies, and therefore leads to complexity of control algorithms and electromechanical processes in the system. The purpose of presented study is to present a proper vector control scheme for the DFIG and overall control for the WT to investigate its behavior at different wind speeds and in different grid voltage conditions: voltage sags, magnitude and frequency variations. The key principles of variable-speed wind turbine were implemented in simulation model and demonstrated during the study. Then, based on developed control scheme and mathematical model, the set of simulation is made to analyze reactive power capabilities of the DFIG wind turbine. Further, the rating of rotor-side converter is modified to not only generate active rated active power, but also to fulfill Grid Codes. Results of modelling and analyzing of the DFIG WT behavior under different speeds and different voltage conditions are presented in the work.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasing amount of renewable energy source based electricity production has set high load control requirements for power grid balance markets. The essential grid balance between electricity consumption and generation is currently hard to achieve economically with new-generation solutions. Therefore conventional combustion power generation will be examined in this thesis as a solution to the foregoing issue. Circulating fluidized bed (CFB) technology is known to have sufficient scale to acts as a large grid balancing unit. Although the load change rate of the CFB unit is known to be moderately high, supplementary repowering solution will be evaluated in this thesis for load change maximization. The repowering heat duty is delivered to the CFB feed water preheating section by smaller gas turbine (GT) unit. Consequently, steam extraction preheating may be decreased and large amount of the gas turbine exhaust heat may be utilized in the CFB process to reach maximum plant electrical efficiency. Earlier study of the repowering has focused on the efficiency improvements and retrofitting to maximize plant electrical output. This study however presents the CFB load change improvement possibilities achieved with supplementary GT heat. The repowering study is prefaced with literature and theory review for both of the processes to maximize accuracy of the research. Both dynamic and steady-state simulations accomplished with APROS simulation tool will be used to evaluate repowering effects to the CFB unit operation. Eventually, a conceptual level analysis is completed to compare repowered plant performance to the state-of-the-art CFB performance. Based on the performed simulations, considerably good improvements to the CFB process parameters are achieved with repowering. Consequently, the results show possibilities to higher ramp rate values achieved with repowered CFB technology. This enables better plant suitability to the grid balance markets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the expansion of steam in turbine, the steam crosses the saturation line and hence subsequent turbine stages run under wet condition. The stages under wet condition run with low efficiency as compared to stages running with supersaturated steam and the life of the last stage cascade is reduced due to erosion. After the steam crosses the saturation line it does not condense immediately but instead it becomes supersaturated which is a meta-stable state and reversion of equilibrium results in the formation of large number of small droplets in the range of 0.05 - 1 μm. Although these droplets are small enough to follow the stream lines of vapor however some of the fog droplets are deposited on the blade surface. After deposition they coagulate into films and rivulets which are then drawn towards the trailing edge of the blade due to viscous drag of the steam. These large droplets in the range of radius 100 μm are accelerated by steam until they impact on the next blade row causing erosion. The two phenomenon responsible for deposition are inertial impaction and turbulent-diffusion. This work shall discuss the deposition mechanism in steam turbine in detail and numerically model and validate with practical data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wind energy is one of the most promising and fast growing sector of energy production. Wind is ecologically friendly and relatively cheap energy resource available for development in practically all corners of the world (where only the wind blows). Today wind power gained broad development in the Scandinavian countries. Three important challenges concerning sustainable development, i.e. energy security, climate change and energy access make a compelling case for large-scale utilization of wind energy. In Finland, according to the climate and energy strategy, accepted in 2008, the total consumption of electricity generated by means of wind farms by 2020, should reach 6 - 7% of total consumption in the country [1]. The main challenges associated with wind energy production are harsh operational conditions that often accompany the turbine operation in the climatic conditions of the north and poor accessibility for maintenance and service. One of the major problems that require a solution is the icing of turbine structures. Icing reduces the performance of wind turbines, which in the conditions of a long cold period, can significantly affect the reliability of power supply. In order to predict and control power performance, the process of ice accretion has to be carefully tracked. There are two ways to detect icing – directly or indirectly. The first way applies to the special ice detection instruments. The second one is using indirect characteristics of turbine performance. One of such indirect methods for ice detection and power loss estimation has been proposed and used in this paper. The results were compared to the results directly gained from the ice sensors. The data used was measured in Muukko wind farm, southeast Finland during a project 'Wind power in cold climate and complex terrain'. The project was carried out in 9/2013 - 8/2015 with the partners Lappeenranta university of technology, Alstom renovables España S.L., TuuliMuukko, and TuuliSaimaa.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tämä insinöörityö tehtiin ABB:n Pitäjänmäen konetehtaalle Tahtikoneet-tulosyksikölle. Työssä tutkittiin mahdollisuuksia valmistaa murtovakovyyhtejä kestomagneettituuligeneraattoreihin, joissa vakoluku on alle yhden. Työ tehtiin tutustumalla aluksi Pitäjänmäen konetehtaan käytössä oleviin vyyhden valmistus- ja käämintämenetelmiin. Lisäksi tutkittiin erilaisia mahdollisia murtovakovyyhden valmistusmenetelmiä, joista lupaavimpia myös kokeiltiin. Saatujen kokemusten pohjalta valittiin vyyhden valmistusmenetelmä, jonka mukaan valmistettiin koe-erä. Koe-erälle suoritettiin mittauksia, joilla varmistettiin niiden sähköinen kestävyys Työn tuloksena valitulla valmistusmenetelmällä valmistettiin vyyhdet prototyyppi tuuligeneraattorin.