28 resultados para Maintenance of wind turbines
Resumo:
The application of VSC-HVDC technology throughout the world has turned out to be an efficient solution regarding a large share of wind power in different power systems. This technology enhances the overall reliability of the grid by utilization of the active and reactive power control schemes which allows to maintain frequency and voltage on busbars of the end-consumers at the required level stated by the network operator. This master’s thesis is focused on the existing and planned wind farms as well as electric power system of the Åland Islands. The goal is to analyze the wind conditions of the islands and appropriately predict a possible production of the existing and planned wind farms with a help of WAsP software program. Further, to investigate the influence of increased wind power it is necessary to develop a simulation model of the electric grid and VSC-HVDC system in PSCAD and examine grid response to different wind power production cases with respect to the grid code requirements and ensure the stability of the power system.
Resumo:
Tämä diplomityö käsittelee tuulivoimageneraattorin konseptisuunnittelua. Työssä käydään läpi tuulivoimateollisuuden, -markkinoiden ja -turbiinien historiaa, nykyhetkeä ja tulevaisuuden ennusteita. Tuulivoimaturbiineista esitellään yleisimmät tyypit ja teknologiat, joita vertaillaan keskenään. Lisäksi selvitetään tarkemmin suoravetoisten tuuliturbiinigeneraattoreiden teknologiaa ja teknisiä rakenteita joita myös vertaillaan keskenään. Työn pääasiallisena tarkoituksena on luoda selkeä konseptisuunnitteluprojektin toimintamalli, jota noudattamalla projekti voidaan hoitaa johdonmukaisesti läpi. Lopuksi työssä vielä käydään läpi suoravetoisen kestomagneettigeneraattorin todellinen konseptisuunnitteluprojekti, jossa ei ole ollut käytössä selkeää toimintamallia.
Resumo:
The amount of installed wind power has been growing exponentially during the past ten years. As wind turbines have become a significant source of electrical energy, the interactions between the turbines and the electric power network need to be studied more thoroughly than before. Especially, the behavior of the turbines in fault situations is of prime importance; simply disconnecting all wind turbines from the network during a voltage drop is no longer acceptable, since this would contribute to a total network collapse. These requirements have been a contributor to the increased role of simulations in the study and design of the electric drive train of a wind turbine. When planning a wind power investment, the selection of the site and the turbine are crucial for the economic feasibility of the installation. Economic feasibility, on the other hand, is the factor that determines whether or not investment in wind power will continue, contributing to green electricity production and reduction of emissions. In the selection of the installation site and the turbine (siting and site matching), the properties of the electric drive train of the planned turbine have so far been generally not been taken into account. Additionally, although the loss minimization of some of the individual components of the drive train has been studied, the drive train as a whole has received less attention. Furthermore, as a wind turbine will typically operate at a power level lower than the nominal most of the time, efficiency analysis in the nominal operating point is not sufficient. This doctoral dissertation attempts to combine the two aforementioned areas of interest by studying the applicability of time domain simulations in the analysis of the economicfeasibility of a wind turbine. The utilization of a general-purpose time domain simulator, otherwise applied to the study of network interactions and control systems, in the economic analysis of the wind energy conversion system is studied. The main benefits of the simulation-based method over traditional methods based on analytic calculation of losses include the ability to reuse and recombine existing models, the ability to analyze interactions between the components and subsystems in the electric drive train (something which is impossible when considering different subsystems as independent blocks, as is commonly done in theanalytical calculation of efficiencies), the ability to analyze in a rather straightforward manner the effect of selections other than physical components, for example control algorithms, and the ability to verify assumptions of the effects of a particular design change on the efficiency of the whole system. Based on the work, it can be concluded that differences between two configurations can be seen in the economic performance with only minor modifications to the simulation models used in the network interaction and control method study. This eliminates the need ofdeveloping analytic expressions for losses and enables the study of the system as a whole instead of modeling it as series connection of independent blocks with no lossinterdependencies. Three example cases (site matching, component selection, control principle selection) are provided to illustrate the usage of the approach and analyze its performance.
Resumo:
Toiminnanohjausjärjestelmien käyttö on muuttanut metsäteollisuuden kunnossapidon työntekijän toimenkuvaa kunnossapidon perustoiminnoista itseohjautuvampaan tietojen käsittelyyn ja jalostamiseen. Työn tavoitteena oliselvittää mobiilin työtilausjärjestelmän vaikutuksia metsäteollisuuden kunnossapidon kenttätyössä. Mobiilin työtilausjärjestelmän käyttö metsäteollisuuden kunnossapidossa mahdollistaa tärkeän kunnossapitotiedon keräämisen ja tarkentamisen kentällä, jossa se usein on ajanmukaisinta ja tarkinta. Haasteellisinta on oikeanlaisen teknologian löytäminen ja standardoiminen kunnossapidon toimintaympäristöihin. Myös organisaation toimintoprosessien on oltava selkeät ennen kuin prosesseja voidaan tehostaa teknologisin keinoin.
Resumo:
Tässä diplomityössä selvitetään teollisen mittakaavan merituulipuistojen taloudellisia ja osin myös teknisiä rakentamisedellytyksiä Kokkolan seudun rannikolla. Lisäksi työssä tarkastellaan erilaisten tukitoimien vaikutusta tuulivoiman kannattavuuteen sekä selvitetään lyhyesti merituulivoiman hallinnollisia ja oikeudellisia edellytyksiä. Esimerkkikohteina tarkastellaan viittä Kokkolan edustalle suunniteltua merituulipuistoa, joiden tehot ovat 20 – 100 MW ja yksikkökoot 1,8 – 5 MW. Tuulipuistojen tuuliolot on arvioitu läheisten mittauspisteiden tietojen perusteella ja niiden pohjalta on laskettu puistojen energiantuotto. Tuulivoimaloiden huipunkäyttöajoiksi on saatu noin 2400 – 2500 h/a. Puistojen investointikustannukset ovat noin 6 500 –10 200 mk/kW: itse turbiinin lisäksi suurimpia kustannuseriä ovat perustukset ja sähköverkkoliitäntä. Vuosittaisten käyttö- ja kunnossapitokustannusten suuruudeksi on arvioitu noin 3 % investointikustannuksista. Kannattavuustarkastelut on suoritettu 5 % laskentakorolla ja 25 vuoden pitoajalle. Tuotantokustannukset ovat ilman tukia noin 27 – 38 p/kWh. Kun sähkön hintana on 150 mk/MWh, ei taloudellista kannattavuutta voida saavuttaa edes nykyisin käytössä olevan investointi- ja tuotantotuen avulla. Tuulisähköstä saatava mahdollinen ”vihreän sähkön lisä” tai päästökaupan aloittaminen voisivat mahdollistaa tuulivoiman taloudellisen kannattavuuden myös silloin, kun sähkön hintataso on matala. Kannattavuutta voitaisiin parantaa myös tukijärjestelmällä, joka painottaa nykyistä enemmän tuotantoa.
Resumo:
Maintenance is a part of system development and it is possible to develop operation models for accomplishing maintenance tasks. These models can be applied to individual maintenance tasks, maintenance projects and version management. Beneficial operation models makes maintenance more effective and they assist in managing various changes. The purpose of this thesis was to develop a maintenance process which can be used to remote administer network servers. This consisted of defining those operation models and technical specifications which enable to set up, manage changes, maintain and monitor resources of information systems that are located in several different sites. At first in this thesis the needs of the process were determined and requirements were defined based on those needs. The meaning of processes in maintenance of information systems, maintenance workflows and challenges were studied. Then current practical problems and disadvantages of maintenance work were analyzed in order to focus the development to proper issues. Because available operation models did not cover all the recent needs, new maintenance process which fulfilled the requirements was developed.
Resumo:
This Master's thesis deals with a Micro Scale Wind Wind Turbine application. The thesis consists of nine chapters. The first chapter is an introduction to the philosophy of a small scale wind turbine application. The second defines concepts, and lists the requirements. The third presents the whole application for an On-Grid , and for an Off-Grid arrangement, with main concentration on lighting, heating, and energy storage. The fourth deals with the Inverter's technology, which are used for the conversion of the produced power. The fifth chapter presents the available storage technology and it's possibilities. The sixth deals with the system, and the technological means used for the implementation. The seventh presents the PLC device, which was used as the controller for the management of the whole application. The eighth deals with the concept and the control application philosophy that the PLC involves. And the final chapter presents conclusions and ideas for further considerations.
Resumo:
The goal of the master's thesis is a detailed research of the technical wind energy potential in Russian Federation: the distribution of the potential all over the territory of the country and the possibility of the application of the potential for power supply of various objects. The main attention of the thesis is devoted to the assessment of wind energy resources (potential) of Russian Federation, both for the territory of country in whole and for every region. Theoretical basic wind energy concepts and the scheme of transformation of kinetic energy of a wind into electric energy by modern wind turbines are given in the work. Also the costs of energy, stimuli of development of wind-engineering and obstacles which impact the industry development are analyzed. The review of existent and projected wind power plants in Russia is carried out.
Resumo:
The objective of this master's thesis is to compare two different generator systems for wind turbines. It is the doubly fed induction generator system with three stage gearbox and the direct drive permanent magnet generator system. The comparison of generator systems is based on annual energy production for a given wind climate. For comparison a 3 MW, 15 rpm wind turbine is used. Modelling of a turbine rotor, gearbox and converters were done. Design of two generators was done and their performance was examined.
Resumo:
The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented.
Resumo:
Recently, due to the increasing total construction and transportation cost and difficulties associated with handling massive structural components or assemblies, there has been increasing financial pressure to reduce structural weight. Furthermore, advances in material technology coupled with continuing advances in design tools and techniques have encouraged engineers to vary and combine materials, offering new opportunities to reduce the weight of mechanical structures. These new lower mass systems, however, are more susceptible to inherent imbalances, a weakness that can result in higher shock and harmonic resonances which leads to poor structural dynamic performances. The objective of this thesis is the modeling of layered sheet steel elements, to accurately predict dynamic performance. During the development of the layered sheet steel model, the numerical modeling approach, the Finite Element Analysis and the Experimental Modal Analysis are applied in building a modal model of the layered sheet steel elements. Furthermore, in view of getting a better understanding of the dynamic behavior of layered sheet steel, several binding methods have been studied to understand and demonstrate how a binding method affects the dynamic behavior of layered sheet steel elements when compared to single homogeneous steel plate. Based on the developed layered sheet steel model, the dynamic behavior of a lightweight wheel structure to be used as the structure for the stator of an outer rotor Direct-Drive Permanent Magnet Synchronous Generator designed for high-power wind turbines is studied.
Resumo:
Electrical machine drives are the most electrical energy-consuming systems worldwide. The largest proportion of drives is found in industrial applications. There are, however many other applications that are also based on the use of electrical machines, because they have a relatively high efficiency, a low noise level, and do not produce local pollution. Electrical machines can be classified into several categories. One of the most commonly used electrical machine types (especially in the industry) is induction motors, also known as asynchronous machines. They have a mature production process and a robust rotor construction. However, in the world pursuing higher energy efficiency with reasonable investments not every application receives the advantage of using this type of motor drives. The main drawback of induction motors is the fact that they need slipcaused and thus loss-generating current in the rotor, and additional stator current for magnetic field production along with the torque-producing current. This can reduce the electric motor drive efficiency, especially in low-speed, low-power applications. Often, when high torque density is required together with low losses, it is desirable to apply permanent magnet technology, because in this case there is no need to use current to produce the basic excitation of the machine. This promotes the effectiveness of copper use in the stator, and further, there is no rotor current in these machines. Again, if permanent magnets with a high remanent flux density are used, the air gap flux density can be higher than in conventional induction motors. These advantages have raised the popularity of PMSMs in some challenging applications, such as hybrid electric vehicles (HEV), wind turbines, and home appliances. Usually, a correctly designed PMSM has a higher efficiency and consequently lower losses than its induction machine counterparts. Therefore, the use of these electrical machines reduces the energy consumption of the whole system to some extent, which can provide good motivation to apply permanent magnet technology to electrical machines. However, the cost of high performance rare earth permanent magnets in these machines may not be affordable in many industrial applications, because the tight competition between the manufacturers dictates the rules of low-cost and highly robust solutions, where asynchronous machines seem to be more feasible at the moment. Two main electromagnetic components of an electrical machine are the stator and the rotor. In the case of a conventional radial flux PMSM, the stator contains magnetic circuit lamination and stator winding, and the rotor consists of rotor steel (laminated or solid) and permanent magnets. The lamination itself does not significantly influence the total cost of the machine, even though it can considerably increase the construction complexity, as it requires a special assembly arrangement. However, thin metal sheet processing methods are very effective and economically feasible. Therefore, the cost of the machine is mainly affected by the stator winding and the permanent magnets. The work proposed in this doctoral dissertation comprises a description and analysis of two approaches of PMSM cost reduction: one on the rotor side and the other on the stator side. The first approach on the rotor side includes the use of low-cost and abundant ferrite magnets together with a tooth-coil winding topology and an outer rotor construction. The second approach on the stator side exploits the use of a modular stator structure instead of a monolithic one. PMSMs with the proposed structures were thoroughly analysed by finite element method based tools (FEM). It was found out that by implementing the described principles, some favourable characteristics of the machine (mainly concerning the machine size) will inevitable be compromised. However, the main target of the proposed approaches is not to compete with conventional rare earth PMSMs, but to reduce the price at which they can be implemented in industrial applications, keeping their dimensions at the same level or lower than those of a typical electrical machine used in the industry at the moment. The measurement results of the prototypes show that the main performance characteristics of these machines are at an acceptable level. It is shown that with certain specific actions it is possible to achieve a desirable efficiency level of the machine with the proposed cost reduction methods.
Resumo:
Wind turbines based on doubly fed induction generators (DFIG) become the most popular solution in high power wind generation industry. While this topology provides great performance with the reduced power rating of power converter, it has more complicated structure in comparison with full-rated topologies, and therefore leads to complexity of control algorithms and electromechanical processes in the system. The purpose of presented study is to present a proper vector control scheme for the DFIG and overall control for the WT to investigate its behavior at different wind speeds and in different grid voltage conditions: voltage sags, magnitude and frequency variations. The key principles of variable-speed wind turbine were implemented in simulation model and demonstrated during the study. Then, based on developed control scheme and mathematical model, the set of simulation is made to analyze reactive power capabilities of the DFIG wind turbine. Further, the rating of rotor-side converter is modified to not only generate active rated active power, but also to fulfill Grid Codes. Results of modelling and analyzing of the DFIG WT behavior under different speeds and different voltage conditions are presented in the work.