41 resultados para web-based instruction
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Winter maintenance, particularly snow removal and the stress of snow removal materials on public structures, is an enormous budgetary burden on municipalities and nongovernmental maintenance organizations in cold climates. Lately, geospatial technologies such as remote sensing, geographic information systems (GIS), and decision support tools are roviding a valuable tool for planning snow removal operations. A few researchers recently used geospatial technologies to develop winter maintenance tools. However, most of these winter maintenance tools, while having the potential to address some of these information needs, are not typically placed in the hands of planners and other interested stakeholders. Most tools are not constructed with a nontechnical user in mind and lack an easyto-use, easily understood interface. A major goal of this project was to implement a web-based Winter Maintenance Decision Support System (WMDSS) that enhances the capacity of stakeholders (city/county planners, resource managers, transportation personnel, citizens, and policy makers) to evaluate different procedures for managing snow removal assets optimally. This was accomplished by integrating geospatial analytical techniques (GIS and remote sensing), the existing snow removal asset management system, and webbased spatial decision support systems. The web-based system was implemented using the ESRI ArcIMS ActiveX Connector and related web technologies, such as Active Server Pages, JavaScript, HTML, and XML. The expert knowledge on snow removal procedures is gathered and integrated into the system in the form of encoded business rules using Visual Rule Studio. The system developed not only manages the resources but also provides expert advice to assist complex decision making, such as routing, optimal resource allocation, and monitoring live weather information. This system was developed in collaboration with Black Hawk County, IA, the city of Columbia, MO, and the Iowa Department of transportation. This product was also demonstrated for these agencies to improve the usability and applicability of the system.
Resumo:
A statewide study was performed to develop regional regression equations for estimating selected annual exceedance- probability statistics for ungaged stream sites in Iowa. The study area comprises streamgages located within Iowa and 50 miles beyond the State’s borders. Annual exceedanceprobability estimates were computed for 518 streamgages by using the expected moments algorithm to fit a Pearson Type III distribution to the logarithms of annual peak discharges for each streamgage using annual peak-discharge data through 2010. The estimation of the selected statistics included a Bayesian weighted least-squares/generalized least-squares regression analysis to update regional skew coefficients for the 518 streamgages. Low-outlier and historic information were incorporated into the annual exceedance-probability analyses, and a generalized Grubbs-Beck test was used to detect multiple potentially influential low flows. Also, geographic information system software was used to measure 59 selected basin characteristics for each streamgage. Regional regression analysis, using generalized leastsquares regression, was used to develop a set of equations for each flood region in Iowa for estimating discharges for ungaged stream sites with 50-, 20-, 10-, 4-, 2-, 1-, 0.5-, and 0.2-percent annual exceedance probabilities, which are equivalent to annual flood-frequency recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years, respectively. A total of 394 streamgages were included in the development of regional regression equations for three flood regions (regions 1, 2, and 3) that were defined for Iowa based on landform regions and soil regions. Average standard errors of prediction range from 31.8 to 45.2 percent for flood region 1, 19.4 to 46.8 percent for flood region 2, and 26.5 to 43.1 percent for flood region 3. The pseudo coefficients of determination for the generalized leastsquares equations range from 90.8 to 96.2 percent for flood region 1, 91.5 to 97.9 percent for flood region 2, and 92.4 to 96.0 percent for flood region 3. The regression equations are applicable only to stream sites in Iowa with flows not significantly affected by regulation, diversion, channelization, backwater, or urbanization and with basin characteristics within the range of those used to develop the equations. These regression equations will be implemented within the U.S. Geological Survey StreamStats Web-based geographic information system tool. StreamStats allows users to click on any ungaged site on a river and compute estimates of the eight selected statistics; in addition, 90-percent prediction intervals and the measured basin characteristics for the ungaged sites also are provided by the Web-based tool. StreamStats also allows users to click on any streamgage in Iowa and estimates computed for these eight selected statistics are provided for the streamgage.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was formally established in 2004, though surveillance has been conducted at the Iowa Department of Public Health (IDPH) for more than ten years. The IISN is comprised of four primary surveillance systems- sentinel health care providers, hospital-based, laboratory-based, and school-based. Sentinel health care providers are part of the U.S. Influenza Sentinel Provider Surveillance System. All systems, except certain sentinel sites, report October-March. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.
Resumo:
Use of ICN’s Internet and data services have continued to increase exponentially, which reflects the capacity needed for greater access to high-speed Internet (Broadband). Users are incorporating more web-based applications, which uses larger amounts of bandwidth; such as transmitting hospital MRIs, video streaming, and web-based systems.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
What we do: Since 1892, the Iowa Geological and Water Survey (IGWS) has provided earth, water, and mapping science to all Iowans. We collect and interpret information on subsurface geologic conditions, groundwater and surface water quantity and quality, and the natural and built features of our landscape. This information is critical for: Predicting the future availability of economic water supplies and mineral resources. Assuring proper function of waste disposal facilities. Delineation of geologic hazards that may jeopardize property and public safety. Assessing trends and providing protection of water quality and soil resources. Applied technical assistance for economic development and environmental stewardship. Our goal: Providing the tools for good decision making to assure the long-term vitality of Iowa’s communities, businesses, and quality of life. Information and technical assistance are provided through web-based databases, comprehensive Geographic Information System (GIS) tools, predictive groundwater models, and watershed assessments and improvement grants. The key service we provide is direct assistance from our technical staff, working with Iowans to overcome real-world challenges. This report describes the basic functions of IGWS program areas and highlights major activities and accomplishments during calendar year 2011. More information on IGWS is available at http://www.igsb.uiowa.edu/.
Resumo:
Data are provided to CJJP through statistical summary forms completed by the JCSLs. Because forms are completed only when meaningful contact between a student and a liaison takes place, only a portion of the total population served is reported. Meaningful contact is defined as having at least five contacts within a 60-day period (at any point during the academic year) regarding at least one of the referral reasons supplied on the form. Data are entered into a web-based application by the liaisons and retrieved electronically by CJJP via the internet. Service information is submitted and uploaded only at the end of the academic year.
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.
Resumo:
During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom developed WPMS solutions on Iowa DOT bridge projects. At the end of the first year of research, a Request for Proposals (RFP) was developed and issued by the Iowa DOT for the selection of a commercial WPMS to pilot test on multiple bridge projects. During the second year of research, the responses to the RFP issued during the first year of research were evaluated and a solution was selected. The selected solution, Attolist, was customized, tested, and implemented during the fall of 2009. Beginning in the winter of 2010, the solution was implemented on Iowa DOT projects. Researchers worked to assist in the training, implementation, and performance evaluation of the solution. Work will continue beyond the second year of research to implement Attolist on an additional pilot project. During this time, work will be completed to evaluate the impact of WPMS on Iowa DOT bridge projects.
Resumo:
Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was established in 2004, though surveillance has been conducted at the Iowa Department of Public Health. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was established in 2004, though surveillance has been conducted at the Iowa Department of Public Health. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was established in 2004, though surveillance has been conducted at the Iowa Department of Public Health. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was established in 2004, though surveillance has been conducted at the Iowa Department of Public Health. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.
Resumo:
The Iowa Influenza Surveillance Network (IISN) was established in 2004, though surveillance has been conducted at the Iowa Department of Public Health. Schools and long-term care facilities report data weekly into a Web-based reporting system. Schools report the number of students absent due to illness and the total enrolled. Long-term care facilities report cases of influenza and vaccination status of each case. Both passively report outbreaks of illness, including influenza, to IDPH.