7 resultados para weak-strong uniqueness

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

80.00% 80.00%

Publicador:

Resumo:

More and more, integral abutment bridges are being used in place of the more traditional bridge designs with expansion releases. In this study, states which use integral abutment bridges were surveyed to determine their current practice in the design of these structures. To study piles in integral abutment bridges, a finite element program for the soil-pile system was developed (1) with materially and geometrically nonlinear, two and three dimensional beam elements and (2) with a nonlinear, Winkler soil model with vertical, horizontal, and pile tip springs. The model was verified by comparison to several analytical and experimental examples. A simplified design model for analyzing piles in integral abutment bridges is also presented. This model grew from previous analytical models and observations of pile behavior. The design model correctly describes the essential behavioral characteristics of the pile and conservatively predicts the vertical load-carrying capacity. Analytical examples are presented to illustrate the effects of lateral displacements on the ultimate load capacity of a pile. These examples include friction and end-bearing piles; steel, concrete, and timber piles; and bending about the weak, strong, and 45° axes for H piles. The effects of cyclic loading are shown for skewed and nonskewed bridges. The results show that the capacity of friction piles is not significantly affected by lateral displacements, but the capacity of end-bearing piles is reduced. Further results show that the longitudinal expansion of the bridge can introduce a vertical preload on the pile.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was conducted in an attempt to determine the cause of paste strength variability in Iowa fly ashes and to develop test methods to more adequately reflect fly ash physical and chemical characteristics. An extensive three year sampling and testing program was developed and initiated which incorporated fly ash from several Iowa power plants. Power plant design and operating data were collected. The variability was directly linked to power plant maintenance schedules and to sodium carbonate coal pretreatment. Fly ash physical and chemical properties can change drastically immediately before and after a maintenance outage. The concentrations of sulfate bearing minerals in the fly ash increases sharply during shutdown. Chemical, mineralogical, and physical testing indicated that the sodium, sulfate bearing minerals, lime and tricalcium aluminate contents of the fly ashes play important roles in the development of hydration reaction products in fly ash pastes. The weak pastes always contained ettringite as the major reaction product. The strong pastes contained straetlingite and monosulfoaluminate as the major reaction products along with minor amounts of ettringite. Recommendations for testing procedure changes and suggested interim test methods are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report documents an extensive field program carried out to identify the relationships between soil engineering properties, as measured by various in situ devices, and the results of machine compaction monitoring using prototype compaction monitoring technology developed by Caterpillar Inc. Primary research tasks for this study include the following: (1) experimental testing and statistical analyses to evaluate machine power in terms of the engineering properties of the compacted soil (e.g., density, strength, stiffness) and (2) recommendations for using the compaction monitoring technology in practice. The compaction monitoring technology includes sensors that monitor the power consumption used to move the compaction machine, an on-board computer and display screen, and a GPS system to map the spatial location of the machine. In situ soil density, strength, and stiffness data characterized the soil at various stages of compaction. For each test strip or test area, in situ soil properties were compared directly to machine power values to establish statistical relationships. Statistical models were developed to predict soil density, strength, and stiffness from the machine power values. Field data for multiple test strips were evaluated. The R2 correlation coefficient was generally used to assess the quality of the regressions. Strong correlations were observed between averaged machine power and field measurement data. The relationships are based on the compaction model derived from laboratory data. Correlation coefficients (R2) were consistently higher for thicker lifts than for thin lifts, indicating that the depth influencing machine power response exceeds the representative lift thickness encountered under field conditions. Caterpillar Inc. compaction monitoring technology also identified localized areas of an earthwork project with weak or poorly compacted soil. The soil properties at these locations were verified using in situ test devices. This report also documents the steps required to implement the compaction monitoring technology evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since integral abutment bridges decrease the initial and maintenance costs of bridges, they provide an attractive alternative for bridge designers. The objective of this project is to develop rational and experimentally verified design recommendations for these bridges. Field testing consisted of instrumenting two bridges in Iowa to monitor air and bridge temperatures, bridge displacements, and pile strains. Core samples were also collected to determine coefficients of thermal expansion for the two bridges. Design values for the coefficient of thermal expansion of concrete are recommended, as well as revised temperature ranges for the deck and girders of steel and concrete bridges. A girder extension model is developed to predict the longitudinal bridge displacements caused by changing bridge temperatures. Abutment rotations and passive soil pressures behind the abutment were neglected. The model is subdivided into segments that have uniform temperatures, coefficients of expansion, and moduli of elasticity. Weak axis pile strains were predicted using a fixed-head model. The pile is idealized as an equivalent cantilever with a length determined by the surrounding soil conditions and pile properties. Both the girder extension model and the fixed-head model are conservative for design purposes. A longitudinal frame model is developed to account for abutment rotations. The frame model better predicts both the longitudinal displacement and weak axis pile strains than do the simpler models. A lateral frame model is presented to predict the lateral motion of skewed bridges and the associated strong axis pile strains. Full passive soil pressure is assumed on the abutment face. Two alternatives for the pile design are presented. Alternative One is the more conservative and includes thermally induced stresses. Alternative Two neglects thermally induced stresses but allows for the partial formation of plastic hinges (inelastic redistribution of forces). Ductility criteria are presented for this alternative. Both alternatives are illustrated in a design example.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reinforced Earth is a French development that has been used in the United States for approximately ten years. Virbro-Replacement, more commonly referred to as stone columns, is an outgrowth of deep densification of cohesionless soils originally developed in Germany. Reinforced Earth has applicability when wall height is greater than about twelve feet and deep seated foundation failure is not a concern. Stone columns are applicable when soft, cohesive subsoil conditions are encountered and bearing capacity and shearing resistance must be increased. The conditions in Sioux City on Wesley Way can be summarized as: (1) restricted right of way, (2) fill height in excess of 25 feet creating unstable conditions, (3) adjacent structures that could not be removed. After analyzing alternatives, it was decided that Reinforced Earth walls constructed on top of stone columns were the most practical approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is the annual report for the Board of Regents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many prairie restoration projects are hampered by a lack of knowledge on how to restore the high diversity found in prairies, while at the same time preventing the establishment of a large weedy component. Methods are needed to increase diversity and abundance of native species while minimizing exotic species invasions in both 1) newly planted restorations and 2) established restorations. We established an experiment in Story and Monona counties in 2005 to determine the effects of different native cover crop species and timing of seeding on the establishment of new prairie restorations. We found that adding a 30-species prairie mix in early spring led to diverse native communities, but adding the mix in the late summer or the following year after cover crops established led to low diversity communities dominated by exotics. The identity of cover crops affected communities less than timing of seed additions. A second seed addition added to ash after a spring fire in the seventh year (Monona County site) increased recruitment from the prairie mix slightly, but the increase was not enough to cause convergence in the treatments. Surprisingly, the second seed addition increased diversity only in communities that were already the most diverse (i.e., in plots seeded with the prairie mix in early spring before cover crops established). These results imply that 1) cover crops are not effective for establishing prairie and 2) over seeding into established plots may not be an easy and efficient way to increase native recruitment and lower weedy species abundances. Therefore, focusing on establishing high levels of recruitment and diversity and excluding weedy species during the critical time early in establishment should be a priority for new projects.