24 resultados para thin porous coating electrodes
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The objective of this research was to evaluate the performance of the product Ultracote® (a polymer based additive produced by Ultrapave, a division of Goodyear) as an aggregate pre-treatment for the reduction of asphalt binder absorption in hot mix asphalt (HMA). The product was tested with a paving project in Louisa county, Iowa with aggregate that had historically shown very high asphalt binder absorption. Results of the testing did not provide any evidence of reduction in binder absorption.
Resumo:
· Evaluate conventional methods of slab removal and asphalt surface preparation for subsequent overlays of portland cement concrete (PCC) in the “remove and replace” areas. · Evaluate existing asphaltic concrete surface under the “remove and patch” areas of rehabilitation areas and evaluate joint formation in the areas of patching. · Evaluate polypropylene fiber enhanced concrete at the three-inch depth to determine the cost/benefit of its inclusion. · Evaluate the performance of the rehabilitated ultra-thin whitetopping sections and the extended performance of the existing ultra-thin sections with and without patching. · Validate existing ultra-thin whitetopping design procedures of the Portland Cement Association (PCA) and American Concrete Pavement Association (ACPA) for application in Iowa.
Resumo:
In this day of the mature highway systems, a new set of problems is facing the highway engineer. The existing infrastructure has aged to or past the design life of the original pavement design. In many cases, increased commercial traffic is creating the need for additional load carrying capacity, causing state highway engineers to consider new alternatives for rehabilitation of existing surfaces. Alternative surface materials, thicknesses, and methods of installation must be identified to meet the needs of individual pavements and budgets. With overlays being one of the most frequently used rehabilitation alternatives, it is important to learn more about the limitations and potential performance of thin bonded portland cement overlays and subsequent rehabilitation. The Iowa ultra-thin project demonstrated the application of thin portland cement concrete overlays as a rehabilitation technique. It combined the variables of base preparation, overlay thickness, slab size, and fiber enhancement into a series of test sections over a 7.2-mile length. This report identifies the performance of the overlays in terms of deflection reduction, reduced cracking, and improved bonding between the portland cement concrete (PCC) and asphalt cement concrete (ACC) base layers. The original research project was designed to evaluate the variables over a 5-year period of time. A second project provided the opportunity to test overlay rehabilitation techniques and continue measurement of the original overlay performance for 5 additional years. All performance indicators identified exceptional performance over the 10-year evaluation period for each of the variable combinations considered. The report summarizes the research methods, results, and identifies future research ideas to aid the pavement overlay designer in the successful implementation of ultra-thin portland cement concrete overlays as an lternative pavement rehabilitation technique.
Resumo:
As our nation’s highway system continues to age, asphalt maintenance and rehabilitation techniques have become increasingly important. The deterioration of pavement over time is inevitable. Preventive maintenance is a strategy to extend the serviceable life of a pavement by applying cost-effective treatments that slow the deterioration of pavement and extend its usable life. Thin maintenance surfaces (TMSs) are preventive maintenance techniques that can effectively prolong the life of pavement when applied at an opportune time. Common TMSs include bituminous fog seal, bituminous seal coat, slurry seal, cold in-place recycling (CIR), and micro-surfacing. This research project investigated ways to improve Iowa Statewide Urban Design and Specifications (SUDAS) and Iowa Department of Transportation (DOT) documents regarding asphalt roadway maintenance and rehabilitation. Researchers led an effort to review and help ensure that the documents supporting proper selection, design, and construction for asphalt maintenance and rehabilitation techniques reflect the latest research findings on these processes: seal coating, slurry sealing, micro-surfacing, and fog sealing. Full results of this investigation are included in this report and its appendices. This report also presents a summary of the recommendations based on the study results.
Resumo:
The use of a thin bonded concrete overlay atop an older surface has been widely incorporated for pavement rehabilitation in Iowa since the early 70's. Two test sections were constructed in 1985 on county road T61 on the Monroe-Wapello County line without the use of grout as a bonding agent to determine if adequate bond could be achieved and structural capacity uncompromised. Both test sections have performed well with one section having higher bond strengths, lower roughness values, higher structural capacity, and less debonding at the joints than the other section. Overall, both ungrouted sections have performed well under substantial truck traffic with minimal surface distress. More attention should be given, however, to rectifying apparent debonding at the joints when no grout is used as a bonding agent.
Resumo:
The first phase of a two-phase research project was conducted to develop guidelines for Iowa transportation officials on the use of thin maintenance surfaces (TMS) for asphaltic concrete and bituminous roads. Thin maintenance surfaces are seal coats (chip seals), slurry seals, and micro-surfacing. Interim guidelines were developed to provide guidance on which roads are good candidates for TMS, when TMS should be placed, and what type of thin maintenance surface should be selected. The guidelines were developed specifically for Iowa aggregates, weather, traffic conditions, road user expectations, and transportation official expectations. In addition to interim guidelines, this report presents recommendations for phase-two research. It is recommended that test section monitoring continue and that further investigations be conducted regarding thin maintenance surface aggregate, additional test sections, placed, and a design method adopted for seal coats.
Resumo:
In recent years there has been renewed interest in using preventive maintenance techniques to extend pavement life and to ensure low life cycle costs for our road infrastructure network. Thin maintenance surfaces can be an important part of a preventive maintenance program for asphalt cement concrete roads. The Iowa Highway Research Board has sponsored Phase Two of this research project to demonstrate the use of thin maintenance surfaces in Iowa and to develop guidelines for thin maintenance surface uses that are specific to Iowa. This report documents the results of test section construction and monitoring started in Phase One and continued in Phase Two. The report provides a recommended seal coat design process based on the McLeod method and guidance on seal coat aggregates and binders. An update on the use of local aggregates for micro-surfacing in Iowa is included. Winter maintenance guidelines for thin maintenance surfaces are reported herein. Finally, Phase One's interim, qualitative thin maintenance surface guidelines are supplemented with Phase two's revised, quantitative guidelines. When thin maintenance surfaces are properly selected and applied, they can improve the pavement surface condition index and the skid resistance of pavements. For success to occur, several requirements must be met, including proper material selection, design, application rate, workmanship, and material compatibility, as well as favorable weather during application and curing. Specific guidance and recommendations for many types of thin maintenance surfaces and conditions are included in the report.
Resumo:
This report is a supplement to one issued in late summer 1986 which covered construction on U.S. 71, in Buena Vista County Iowa. The work involved rehabilitation of an older 20 feet wide pavement by placing a four inch thick bonded concrete overlay monolithically with two feet of widening on each side. The work was performed on one lane at a time while construction traffic and limited public traffic used the adjacent traffic lane. When work on the first lane was complete traffic was moved onto it and rehabilitation was completed on the second lane. This report covers the condition of the rehabilitated roadway in May 1987 after the first winter. The condition is described by visual observations, core conditions, and various test results including core compressive strength, direct shear tests on cores for bond strength, profilometer results and delamtect test results.
Resumo:
In recent years, ultra-thin whitetopping (UTW) has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavement. Numerous UTW projects have been constructed and tested, enabling researchers to identify key elements contributing to their successful performance. These elements include foundation support, the interface bonding condition, portland cement concrete (PCC) overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. The interface bonding condition is the most important of these elements. It enables the pavement to act as a composite structure, thus reducing tensile stresses and allowing an ultra-thin PCC overlay to perform as intended. Although the main factors affecting UTW performance have been identified in previous research, neither the impact that external variables have on the elements nor the element interaction have been thoroughly investigated. The objective of this research was to investigate the interface bonding condition between an ultra-thin PCC overlay and an ACC base over time, considering the previously mentioned variables. Laboratory testing and full scale field testing were planned to accomplish the research objective. Laboratory testing involved monitoring interface strains in fabricated PCC/ACC composite test beams subjected to either static or dynamic flexural loading. Variables investigated included ACC surface preparation, PCC thickness, and synthetic fiber reinforcement usage. Field testing involved monitoring PCC/ACC interface stains and temperatures, falling weight deflectometer (FWD) deflection responses, direct shear strengths, and distresses on a 7.2 mile Iowa Department of Transportation (Iowa DOT) UTW project (HR-559). The project was located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. Variables investigated included ACC surface preparation, PCC thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. This report documents the planning, equipment selection, and construction of the project built in 1994.
Resumo:
A four and one-half inch thick, bonded portland cement concrete (PCC) overlay and integral widening were used to rehabilitate a 4.5 mile section of Iowa route 141 from US 169 to Iowa 210 in Dallas County. There was a substantial amount of cracking in the old 20 feet wide PCC pavement. Most of the widening, which was tied to the original slab by dowel bars, was placed as a four feet wide section on one side. Coring has shown that the overlay is well bonded and testing with the Delamtect has shown less than 1% debonding. Midpanel transverse cracks in the old pavement have reflected through the overlay (as expected). Some new transverse cracking has occurred. This cracking has not caused any significant problems. In general, the overlay is performing quite well.
Resumo:
An 11.6 km research project was constructed in 1994 on a portion of Iowa Highway 21 in Iowa County, from U.S. 6 to Iowa Highway 212. This research is intended to evaluate the effect of four primary variables on long term performances of the PCC concrete overlay, commonly called whitetopping. The variables are thickness (50 mm, 100 mm, 150 mm, and 200 mm), joint spacing (0.6 m squares, 1.2 m squares, 1.8 m squares, and 4.6 m spacing), fiber use (concrete with and without polypropolene fibers) and surface preparation (patch only, scarifying the surface, and cold-in-place recycling). After two years, only two sections exhibit a small amount of debonding and distress cracking. Both sections are 50 mm thick. Within each of these two sections, only 2% of the area is affected. Two other 50 mm thick sections have a small number of cracks but no debonding has been found. No adverse effects of these cracks are evident. Three asphalt overlay sections were also constructed. In each asphalt section, transverse cracks have recently been found. At two years of age, the research sections are performing very well. An insignificant number of cracks and no distressed areas have been found in any research sections thicker than 50 mm.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.
Resumo:
A research project involving 2, 3, 4, and 5 in. (5.1, 7.6, 10.2, and 12.7 cm) of bonded portland cement concrete (PCC) overlay on a 1.3 mile (2.1 km) PCC pavement was conducted in Clayton County, Iowa, during September 1977, centering on the following objectives: (1) Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense PCC mixture using standard mixes with super water reducing admixtures; (2) Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced PCC resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super water reducing admixtures; and (3) Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced PCC can be obtained with only special surface cleaning and no surface removal or grinding. The conclusions are as follows: (1) Normal mixing equipment and proportioning procedures could be used using a conventional central-mix proportioning plant. This was successful when used with super water reducing admixtures. Only minor changes need be made in procedures and timing. (2) The time has been too short since the completion of the project to determine how the new pavement will perform, however, initially it appears that the method is economical and no reason is seen at this time why the life of the pavement should not be comparable to an all new pavement. (3) The initial test results show that bond strength, regardless of which method of cleaning is used, scarifying, sand blasting or water blasting, far exceed what is considered the minimum bond strength of 200 psi (1379 kPa) except where the paint stripes were intentionally left, thus showing that the paint must be removed. (4) It appears that either cement and water grout or sand, cement and water grout may be used and still obtain the required bond.
Resumo:
A Research Project involving two, three, four and five inches of bonded Portland Cement Concrete Overlay on a 1.3 mile Portland Cement Concrete pavement was conducted in Clayton County, Iowa, during September, 1977, centering on the following objectives: 1. Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense Portland Cement Concrete mixture using standard mixes with super-water reducing admixtures; 2. Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced Portland Cement Concrete resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super-water reducing admixtures; 3. Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced Portland Cement Concrete can be obtained with only special surface cleaning and no surface removal or grinding.
Resumo:
Pavements have been overlaid with thin bonded portland cement concrete (PCC) for several years. These projects have had traffic detoured for a period of 5-10 days. These detours are unacceptable to the traveling public and result in severe criticism. The use of thin bonded fast track overlay was promoted to allow a thin bonded PCC overlay with minimal disruption of local traffic. This project demonstrated the concept of using one lane of the roadway to maintain traffic while the overlay was placed on the other and then with the rapid strength gain of the fast track concrete, the construction and local traffic is maintained on the newly placed, thin bonded overlay. The goals of this project were: 1. Traffic usage immediately after placement and finishing. 2. Reduce traffic disruption on a single lane to less than 5 hours. 3. Reduce traffic disruption on a given section of two-lane roadway to less than 2 days. 4. The procedure must be economically viable and competitive with existing alternatives. 5. Design life for new construction equivalent to or in excess of conventional pavements. 6. A 20 year minimum design life for rehabilitated pavements.