The objective of this project was to evaluate the in-use fuel economy and emission differences between hybrid-electric and conventional transit buses for the Ames, Iowa transit authority, CyRide. These CyRide buses were deployed in the fall of 2010. Fuel economy was compared for the hybrid and control buses. Several older bus types were also available and were included in the analysis. Hybrid buses had the highest fuel economy for all time periods for all bus types. Hybrid buses had a fuel economy that was 11.8 percent higher than control buses overall, 12.2 percent higher than buses with model years 2007 and newer, 23.4 percent higher than model years 2004 through 2006, 10.2 percent higher than model years 1998 through 2003, 38.1 percent higher than model years 1994 through 1997, 36.8 percent higher than model years 1991 through 1993, and 36.8 percent higher for model years pre-1991. On-road emissions were also compared for three of the hybrid buses and two control buses using a portable emissions monitor. On-average, carbon dioxide, carbon monoxide, and hybrid carbon emissions were much higher for the control buses than for the hybrid buses. However, on average nitrogen oxide emissions were higher for the hybrid buses.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The objectives of the project were to develop methodologies for (i) prediction and measurement of the magnitude of pressure which develops within pores of saturated porous materials upon freezing, (ii) determination of pore structure (pore size distribution) of porous materials; (iii) prediction and measurement of the rate with which pore ice grows; and (iv) prediction of frost susceptibility of porous materials with varying pore structures. As with all research endeavors solution of one problem leads to another one and this project was no exception. Emergence of new problems and the measures taken as the work progressed were discussed in progress reports submitted to the board. This final report will discuss only the conclusive finds and suggest measures to be taken for future investigations. The theory discussed in the proposal is not repeated in this report for the sake of brevity. However, the paper published as part of this project containing the theory is attached as Appendix I for the reader interested in the theory. In conformity with the objectives, this report consists of four parts. In accordance with the project contract two ice porosimeters were built and one will be delivered to the Iowa DOT after training of a DOT technician under the supervision of Mr. Wendell Dubberke with assistance from ISU researchers. During the training period debugging and further improvements in software will continue.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. The research reported here was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There are still many vintage portland cement concrete (PCC) pavements, 18 ft wide (5.4 m), dating back to pre-World War II era in use today. Successive overlays have been placed to cover joints and to improve rideability. The average thickness of the existing asphalt cement concrete (ACC) along route E66 in Tama County, Iowa, was 6.13 in. (15.6 cm). The rehabilitation strategy called for widening the base using the top 3 in. (7.6 cm) of the existing ACC by a recycling process involving cold milling and mixing with additional emulsion/rejuvenator. The material was then placed into a widening trench and compacted to match the level of the milled surface. This project was undertaken to develop a rehabilitation methodology to widen these older pavements economically and to have a finished surface capable of carrying traffic with little or no additional work.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.