13 resultados para sexual maturity
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
A two page informational sheet about workplace sexual harassment produced by Iowa Commission on the Status of Women
Resumo:
An informational sheet about workplace sexual harassment produced by Iowa Commission on the Status of Women.
Resumo:
An informational sheet about housing and sexual harassment produced by Iowa Commission on the Status of Women.
Resumo:
An informational sheet about developing and implementing a policy which prohibits sexual harassment in the workplace.
Resumo:
Another recently enacted law is the Iowa Safe Schools Law. Effective September 1, 2007, Iowa Code Chapter 280 requires both public and private schools to establish policies prohibiting harassment and bullying against students by employees, school volunteers, or other students. Sexual Orientation and Gender identity are covered under the Safe Schools Law. Students may now seek remedies under both Chapter 216 and Chapter 280.
Resumo:
Effective July 1, 2007, the Iowa Civil Rights Act (Iowa Code Chapter 216) was expanded to add sexual orientation and gender identity to the list of protected characteristics. It is now illegal in Iowa to discriminate against a person because of his/her actual or perceived sexual orientation or gender identity.
Resumo:
Effective July 1, 2007, the Iowa Civil Rights Act (Iowa Code Chapter 216) was expanded to add sexual orientation and gender identity to the list of protected classes. It is now ILLEGAL in Iowa to discriminate against a person because of his/her sexual orientation or gender identity.
Resumo:
Effective July 1, 2007, the Iowa Civil Rights Act (Iowa Code Chapter 216) was expanded to add sexual orientation and gender identity to the list of protected classes. It is now ILLEGAL in Iowa to discriminate against a person because of his/her sexual orientation or gender identity.
Resumo:
This project is part of an effort conducted by the Justice Research and Statistics Association (JRSA) under a grant whose objective is to provide states with descriptions of existing methodologies to collect Domestic Violence (DV) and Sexual Assault (SA) data. JRSA has identified three different methodologies to collect such data: · Incident-based reporting as part of the Uniform Crime Reports · Specialized data collection from law enforcement through a separate data collection system · Specialized data collection coming directly from service providers. One state has been selected as an example of each type of data collection above, with Iowa selected as a representative of states with incident based reporting (IBR) as part of the UCR system.
Resumo:
The result and experience of field implementation of the maturity method on 14 portland cement concrete (PCC) paving and patching projects during 1995 are summarized in this report. The procedure for developing reference PCC maturity-strength curve of concrete is discussed. Temperature measurement as well as effects of datum temperature, entrained air content and type of aggregate on maturity-strength relationship are examined. Some limitations of the maturity method are discussed. The available field experience and results indicate that the maturity method provides a simple approach to determine strength of concrete, and can be easily implemented in field paving and patching projects. The use of the maturity method may result in reduced project construction time.
Resumo:
This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.
Resumo:
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.
Resumo:
The effect of curing temperature, in the range of 4.4 to 22.8 degrees C (40 to 73 degrees F), on strength development was studied based on the maturity and pulse velocity measurements in this report. The strength-maturity relationships for various mixes using a Type I cement and using a Type IP cement, respectively, were experimentally developed. The similar curves for early age strength development of both the patching concrete, using a Type I cement with the addition of calcium chloride, and the fast track concrete, using a Type III cement and fly ash, have also been proposed. For the temperature ranges studied, the strength development of concrete can be determined using a pulse velocity measurement, but only for early ages up to 24 hours. These obtained relationships can be used to determine when a pavement can be opened to traffic. The amount of fly ash substitution, up to 30%, did not have a significant influence on the strength-maturity relationship.