16 resultados para routing paths
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Winter maintenance, particularly snow removal and the stress of snow removal materials on public structures, is an enormous budgetary burden on municipalities and nongovernmental maintenance organizations in cold climates. Lately, geospatial technologies such as remote sensing, geographic information systems (GIS), and decision support tools are roviding a valuable tool for planning snow removal operations. A few researchers recently used geospatial technologies to develop winter maintenance tools. However, most of these winter maintenance tools, while having the potential to address some of these information needs, are not typically placed in the hands of planners and other interested stakeholders. Most tools are not constructed with a nontechnical user in mind and lack an easyto-use, easily understood interface. A major goal of this project was to implement a web-based Winter Maintenance Decision Support System (WMDSS) that enhances the capacity of stakeholders (city/county planners, resource managers, transportation personnel, citizens, and policy makers) to evaluate different procedures for managing snow removal assets optimally. This was accomplished by integrating geospatial analytical techniques (GIS and remote sensing), the existing snow removal asset management system, and webbased spatial decision support systems. The web-based system was implemented using the ESRI ArcIMS ActiveX Connector and related web technologies, such as Active Server Pages, JavaScript, HTML, and XML. The expert knowledge on snow removal procedures is gathered and integrated into the system in the form of encoded business rules using Visual Rule Studio. The system developed not only manages the resources but also provides expert advice to assist complex decision making, such as routing, optimal resource allocation, and monitoring live weather information. This system was developed in collaboration with Black Hawk County, IA, the city of Columbia, MO, and the Iowa Department of transportation. This product was also demonstrated for these agencies to improve the usability and applicability of the system.
Resumo:
The choice of a research path in attacking scientific and technological problems is a significant component of firms’ R&D strategy. One of the findings of the patent races literature is that, in a competitive market setting, firms’ noncooperative choices of research projects display an excessive degree of correlation, as compared to the socially optimal level. The paper revisits this question in a context in which firms have access to trade secrets, in addition to patents, to assert intellectual property rights (IPR) over their discoveries. We find that the availability of multiple IPR protection instruments can move the paths chosen by firms engaged in an R&D race toward the social optimum.
Resumo:
Growing Green Communities is strongly committed to improving the quality of Camp Creek and its watershed by reducing soil loss, which will benefit landowners by preserving their topsoil and improve the water quality of Camp Creek by reducing sediment loading of the creek. To accomplish the goal of reducing soil loss and improving water quality, Growing Green Communities has worked with the Iowa Department of Natural Resources to identify areas of concentrated flow paths (CFPs) within the Camp Creek Watershed using LiDAR topographic mapping technology. A goal of this project is to identify sites expected to have the greatest impact in reducing soil loss and to install Best Management Practices (BMPs) at these sites. Landowners and other project partners will work to develop the most effective BMPs for each site. After the BMPs are designed and constructed, a conservation easement will be recorded to protect the BMPs. GGC plans to record 40 acres as easements. The easements will be purchased by Growing Green Communities and donated to a qualified conservation organization for long term management and maintenance.
Resumo:
Parental concerns about traffic and strangers have reduced children’s freedom to move about their neighborhoods on their own. Programs like the Walking School Bus — an adult-supervised walk to school — identify safe routes to school, and teach safe crossing practices and “street smart” skills. Appropriate infrastructure like sidewalks and bicycling paths is also important.
Resumo:
Nationwide, about five cents of each highway construction dollar is spent on culverts. In Iowa, average annual construction costs on the interstate, primary, and federal-aid secondary systems are about $120,000,000. Assuming the national figure applies to Iowa, about $6,000,000 are spent on culvert construction annually. For each one percent reduction in overall culvert costs, annual construction costs would be reduced by $60,000. One area of potential cost reduction lies in the sizing of the culvert. Determining the flow area and hydraulic capacity is accomplished in the initial design of the culvert. The normal design sequence is accomplished in two parts. The hydrologic portion consists of the determination of a design discharge in cubic feet per second using one of several available methods. This discharge is then used directly in the hydraulic portion of the design to determine the proper type, size, and shape of culvert to be used, based on various site and design restrictions. More refined hydrologic analyses, including rainfall-runoff analysis, flood hydrograph development, and streamflow routing techniques, are not pursued in the existing design procedure used by most county and state highway engineers.
Resumo:
regional transportation workforce development summits held across the United States in 2009 and 2010 as part of a coordinated initiative to ultimately develop a national strategy to address future transportation workforce issues. The initiative is being led by the U.S. Department of Transportation’s (DOT) Research and Innovative Technology Administration (RITA). This particular summit was hosted by Iowa State University’s Midwest Transportation Consortium (MTC) and Institute for Transportation (InTrans). The purpose of the Midwest summit was to assess the educational and training needs of the future transportation workforce and identify strategies to address those needs across various career paths. It addressed a broad spectrum of topics including strategies to attract women and under-represented minority groups, pre-college opportunities and strategies, post-secondary education, post-college continuing education, professional licensure, and specific industry perspectives. The goals of the summit were (1) to gain an improved understanding of the transportation workforce needs of Iowa and the surrounding states and (2) to identify best practices in addressing the workforce development needs. This event had two tracks: one focused on pre-college education and the other focused primarily on college education and practitioners. Attendees provided a good cross-section of the larger transportation industry. From what was learned at the summit, Iowa State University, like other regional hosts, can develop a “profile of needs” for Iowa including specific job categories over specific time horizons. The summit was also successful in identifying best practices in addressing the workforce needs that can be utilized by us and others as potential tools or in a “national-level list of attributes.” Each regional summit has provided some guidance in developing statewide profiles. The collection of best practices or tools from all the regional summits can be shared and applied to address state (or regional) needs profiles to attract, develop, and retain an effective workforce.
Resumo:
Single-vehicle run-off-road crashes are the most common crash type on rural two-lane Iowa roads. Rumble strips have proven effective in mitigating these crashes, but the strips are commonly installed in paved shoulders on higher-volume roads that are owned by the State of Iowa. Lower-volume paved rural roads owned by local agencies do not commonly feature paved shoulders but frequently experience run-off-road crashes. This project involved installing rumble stripes, which are a combination of conventional rumble strips with a painted edge line placed on the surface of the milled area, along the edge of the travel lanes, but at a narrow width to avoid possible intrusion into the normal vehicle travel paths. The research described in this report was part of a project funded by the Federal Highway Administration, Iowa Highway Research Board, and Iowa Department of Transportation to evaluate the effectiveness of edge-line rumble strips in Iowa. The project evaluated the effectiveness of rumble stripes in reducing run-off-road crashes and in improving the longevity and wet-weather visibility of edge-line markings. This project consisted of two phases. The first phase was to select pilot study locations, select a set of test sites, install rumble stripes, summarize lessons learned during installation, and provide a preliminary assessment of the rumble stripes’ performance. The purpose of this report was to document results from Phase II. A before and after crash analysis was conducted to assess whether use of the treatment had resulted in fewer crashes. However, due to low sample size, results of the analysis were inconclusive. Lateral position was also evaluated before and after installation of the treatment to determine whether vehicles engaged in better lane keeping. Pavement marking wear was also assessed.
Resumo:
Traumatic Brain Injury (TBI) impacts the lives of thousands of Iowans every year. TBI has been described as the “Silent Epidemic” because so often the scars are not visible to others. The affects of brain injury are cognitive, emotional, social, and can result in physical disability. In addition to the overwhelming challenges individuals with brain injury experience, families also face many difficulties in dealing with their loved one’s injury, and in navigating a service delivery system that can be confusing and frustrating. In 1998, the Iowa Department of Public Health (IDPH) conducted a comprehensive statewide needs assessment of brain injury in Iowa. This assessment led to the development of the first Iowa Plan for Brain Injury, “Coming Into Focus.” An updated state plan, the Iowa Plan for Brain Injuries 2002 – 2005, was developed, which reported on progress of the previous state plan, and outlined gaps in service delivery in Iowa. Four areas of focus were identified by the State Plan for Brain Injuries Task Force that included: 1) Expanding the Iowa Brain Injury Resource Network (IBIRN); 2) Promoting a Legislative and Policy Agenda, While Increasing Legislative Strength; 3) Enhancing Data Collection; and, 4) Increasing Funding. The IDPH utilized “Coming Into Focus” as the framework for an application to the federal TBI State Grant Program, which has resulted in more than $900,000 for plan implementation. Iowa continues to receive grant dollars through the TBI State Grant Program, which focuses on increasing capacity to serve Iowans with brain injury and their families. Highlighting the success of this grant project, in 2007 the IDPH received the federal TBI Program’s “Impacting Systems Change” Award. The Iowa Brain Injury Resource Network (IBIRN) is the product of nine years of TBI State Grant Program funding. The IBIRN was developed to ensure that Iowans got the information and support they needed after a loved one sustained a TBI. It consists of a hospital and service provider pre-discharge information and service linkage process, a resource facilitation program, a peer-to-peer volunteer support network, and a service provider training and technical assistance program. Currently over 90 public and private partners work with the IDPH and the Brain Injury Association of Iowa (BIA-IA) to administer the IBIRN system and ensure that families have a relevant and reliable location to turn for information and support. Further success was accomplished in 2006 when the Iowa legislature created the Brain Injury Services Program within the IDPH. This program consists of four components focusing on increasing access to services and improving the effectiveness of services available to individuals with TBI and their families, including: 1) HCBS Brain Injury Waiver-Eligible Component; 2) Cost Share Component; 3) Neuro-Resource Facilitation; and, 4) Enhanced Training. The Iowa legislature appropriated $2.4 million to the Brain Injury Services Program in state fiscal year (SFY) 2007, and increased that amount to $3.9 million in SFY 2008. The Cost Share Component models the HCBS Brain Injury Waiver menu of services but is available for Iowans who do not qualify functionally or financially for the Waiver. In addition, the Neuro-Resource Facilitation program links individuals with brain injury and their families to needed supports and services. The Iowa Plan for Brain Injury highlights the continued need for serving individuals with brain injury and their families. Additionally, the Plan outlines the paths of prevention and services, which will expand the current system and direct efforts into the future.
Resumo:
In 1980, a Vanguard High Pressure Water Blaster capable of providing 10 gallons of water per minute at 2000 psi was purchased to evaluate water blasting as a crack cleaning method prior to crack filling on asphalt concrete pavements. Afer some iniital trials demonstrated its effectiveness of removing dirt, debris and vegetation, it was included in joint and crack maintenance research on Iowa 7 in Webster County. The objective of the research was to evaluate six crack preparation methods and seven "sealant" materials. The cleaning and sealing was performed in the spring of 1983. Visual evaluations of the performance were made in the fall of 1983 and spring of 1985. Compressed air and/or high pressure water did not adequately prepare cracks less than 3/8 inch wide. Routing or sawing was necessary to provide a sealant reservoir. The water blaster was more effective than compressed air in removing dirt, debris and vegetation but this did not yield significant improvement in sealant adhesion or longevity. Periodic crack filling is necessary on ACC surfaces throughout the remaining life of the pavement.
Resumo:
East Okoboji Beach was platted on April 20, 1961 and includes over 90.4 acres with 489 lots. The East Okoboji Beach project includes a complete storm water discharge system, which includes low impact development and reconstruction of the roadways in East Okoboji Beach. The East Okoboji Beach Project is an enormous project that is the first Dickinson County project to retrofit LID practices, lake-friendly storm-water drainage systems and roadway reconstruction throughout an existing sub- division. This cooperative project between DNR, Dickinson County, and EOB landowners includes engineering retention ponds, rain gardens, bio-swales and other LID practices to reduce nutrient and sediment pollutants flowing directly into East Okoboji. The nature of the problem stems back to that original plat where small lots were platted and developed without planning for storm water discharge. There was no consideration of the effects of filling in and developing over the many wetland areas existing in EOB. The scope of the problem covers the entire 90.4 acres in East Okoboji Beach, the DNR owned land and the farmed land to the east. The nature of the problem stems from storm water runoff flowing throughout the watershed and into East Okoboji Beach where it flows down self-made paths and then into East Lake Okoboji. That storm water runoff dumps nutrient and sediment pollutions directly into East Lake Okoboji. The expected result of this project is a new roadway and drainage system constructed with engineering that is intended to protect East Lake Okoboji and the land and homes in East Okoboji Beach. The benefit will be the improvement in the waters and the reduction of the siltation in the East Lake Okoboji.
Resumo:
This project develops a smartphone-based prototype system that supplements the 511 system to improve its dynamic traffic routing service to state highway users under non-recurrent congestion. This system will save considerable time to provide crucial traffic information and en-route assistance to travelers for them to avoid being trapped in traffic congestion due to accidents, work zones, hazards, or special events. It also creates a feedback loop between travelers and responsible agencies that enable the state to effectively collect, fuse, and analyze crowd-sourced data for next-gen transportation planning and management. This project can result in substantial economic savings (e.g. less traffic congestion, reduced fuel wastage and emissions) and safety benefits for the freight industry and society due to better dissemination of real-time traffic information by highway users. Such benefits will increase significantly in future with the expected increase in freight traffic on the network. The proposed system also has the flexibility to be integrated with various transportation management modules to assist state agencies to improve transportation services and daily operations.
Resumo:
Single-vehicle run-off-road crashes are the most common crash type on rural two-lane Iowa roads. Rumble strips have been proven effective in mitigating these crashes, but these strips are commonly installed in paved shoulders adjacent to higher-volume roads owned by the State of Iowa. Lower-volume paved rural roads owned by local agencies do not commonly feature paved shoulders but frequently experience run-off-road crashes. This project involved installing “rumble stripes,” which are a combination of conventional rumble strips with a painted edge line placed on the surface of the milled area, along the edge of the travel lanes but at a narrow width to avoid possible intrusion into the normal vehicle travel paths. Candidate locations were selected from a list of paved local rural roads that were most recently listed in the top 5% of roads for run-off-road crashes in Iowa. Horizontal curves were the most favored locations for rumble stripe installation because they commonly experience roadway departure crashes. The research described in this report was part of a project funded by the Federal Highway Administration, Iowa Highway Research Board, and Iowa Department of Transportation to evaluate the effectiveness of edge line rumble strips in Iowa. The project evaluated the effectiveness of “rumble stripes” in reducing run-off-road crashes and in improving the longevity and wet weather visibility of edge line markings. This project consists of two phases. The first phase was to select pilot study locations, select a set of test sites, install rumble stripes, summarize lessons learned during installation, and provide a preliminary assessment of the rumble stripes’ performance. This information is summarized in this report. The purpose of the second phase is to provide a more long-term assessment of the performance of the pavement markings, conduct preliminary crash assessments, and evaluate lane keeping. This will result in a forthcoming second report.
Resumo:
In 1990, early distress had shown up on US 20 in Hamilton/Webster counties, three years after paving. Since that time, over a dozen more projects, constructed between 1984 and 1994, have been found to exhibit similar early distress. Several changes to the concrete and Portland cement specifications occurred in 1994 and 1996. This study was undertaken to investigate in place concrete pavements before and after specification changes were implemented. The objective of this research is to evaluate the impact of Portland cement and concrete specification changes made in 1994 and 1996 on PCC durability. Cores were obtained in 1998 and 2003 from projects constructed in 1992, before specification changes, and 1997 after specification changes. The following is a brief summary of the conclusions: 1. The pavements in the study constructed under the new specifications are performing much better after 5 years of service than the pavements constructed under the old specifications. 2. According to ISU, micro-cracking is evident in all concrete that has been in service, due to thermal stresses and loading stresses. Also, the low vacuum SEM will desiccate the concrete enough to cause micro-cracking. The SEM should not be used as a tool to indicate micro-cracking. 3. Use of Type II cement (C3A <8%) and a 3.0% SO3 limit does not completely eliminate ettringite infilling in air voids, as indicated in the bottom of the 1997 cores. 4. In areas of high moisture (bottom of the core), infilling is present in most of the 1997 cores. 5. Low air content and high spacing factor in the top of 1992 cores apparently causes F/T cycling cracking and then increased moisture paths from cracking causes infilling. 6. Use of ground granulated blast furnace slag (GGBFS) and fly ash reduces ettringite infilling either by diluting the aluminate (C3A) or lowering permeability, which slows ingress of moisture. 7. The specification changes that made the biggest impact on pavement durability are the limits on vibration and increase in air content in September 1994. 8. Investigations of cores from pavements placed in 2002 and 2003 indicate improved air contents and spacing factors. In-place air content and spacing factors should be monitored to determine if appropriate air void parameters are being met.
Resumo:
In jointed portland cement concrete pavements, dowel bars are typically used to transfer loads between adjacent slabs. A common practice is for designers to place dowel bars at a certain, consistent spacing such that a sufficient number of dowels are available to effectively transfer anticipated loads. In many cases, however, the standards developed today for new highway construction simply do not reflect the design needs of low traffic volume, rural roads. The objective of this research was to evaluate the impact of the number of dowel bars and dowel location on joint performance and ultimately on pavement performance. For this research, test sections were designed, constructed, and tested in actual field service pavement. Test sections were developed to include areas with load transfer assemblies having three and four dowels in the outer wheel path only, areas with no joint reinforcement whatsoever, and full lane dowel basket assemblies as the control. Two adjacent paving projects provided both rural and urban settings and differing base materials. This report documents the approach to implementing the study and provides discussion and suggestions based on the results of the research. The research results indicate that the use of single three or four dowel basket assemblies in the outer wheel path is acceptable for use in low truck volume roads. In the case of roadways with relatively stiff bases such as asphalt treated or stabilized bases, the use of the three dowel bar pattern in the outside wheel path is expected to provide adequate performance over the design life of the pavement. In the case of untreated or granular bases, the results indicate that the use of the three or four dowel bar basket in both wheel paths provides the best long-term solution to load transfer and faulting measurements.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.